equipment shall be stored, applied, installed, connected, is f ;llowed by words reading tha no like, equivalena rerected, protected, used, cleaned, and conditioned in "or equal" ite or no substittion is pF-.ttd, ether tmsaccordance with instructions of the applicable Supplier, of m erial or equ4pment or material Or equipnent of etherexcept as otherwise may be provided in the Contract Docu- Supplierfs may be subn'5ted to ENGINEER for revitvments. wder the c n eseibed beloy'-D. C TRCTRshall omploy only competenit 1 . -0U' Erqu" Items:- If in ENGINEER's sale discretionpersons to do0 toe 'Aork AnId whlenever OVAhTER shall an item of material or eqiipmnent proposed by CONnotiftCONTRACTOR, in writing, that any person on the TRACTOR is f;rctinally equal. to that named an dWorkE apporFs to be inomffpetenlt, disordry, Or otherwise sufcetysmlrs that po ch4ange in related WorkJ wijlunsatisf.. o Fs, such person shall be .rmoved from the be required, it may be considered by ENGPT F _E as an.Project and shall not again be employed on it ecxeept with "or O equl" item, in which case review and approval of thethP consent Rf A*'ThJER.proposed item may, in ENGlNEE9R's sole discretion, beaccomplished without compliance with sonee or all of *theC. Without limiting the responsibility or liability of the requirementsfr ap 3r o .su prp.. bttute items. Fe.CONTRACTOR pursuant to this agreement, all warranties the putoses of this pa~graph 6.95.A. !, a proposed item ofgiven by manufacturers on materials or equipment material or equipment will be ensid.er.d f.actionally equalincorporated in the work are hereby assigned by the to an item so "a ned if:CONTRACTOR to the Owner. Such assignment shallbe effective upon completion of Contractor's warranty a. in the exorcise of reasonable judgment ENGINEERperiod. If requested, the CONTRACTOR shall execute determines that: 6) it is at least equal in qL.lit, durabilt ,formal assignments of said manufacturer's warranties to .ppearanec, se..h ., and design haraG@ristis; (ii) it Willthe Owner, All such warranties shall be directly reliably p fefom at least equally well the fi:etion imposedenforceable by the Owner. Such assignment shall in no by t.. design iconcept of the completed Project as away affect the Contractor's responsibilities and duties'Thole, aanctioningand;during the wan anty period.b. CONTR -ACTOR etrifies that: (i) there i~s no increase6.04 Progress Schedule in cot. 4 to t ONR; and (ii) it will conformsubstantially, even with deviations, to the detailedA. CONTRACTOR shall adhere to the progress requirements of the item m iaed in the Contract Documents.schedule established in accordance with paragraph 2.07 as itmay be adjusted from time to time as provided below. . S-bstilute ]tem1. CONTRACTOR shall submit to ENGINEER for a. If in ENGINEER's soWe disretioHn a. itR.M 4 materialacceptance (to the extent indicated in paragraph 2.07),or . q..pment proposed by CONTRACTOR doe; netproposed adjustments in the progress schedule that will not qua as an "or equal" item under pem--ph 6.9. A.1, itresult in changing the Contract Times (or Milestones). Such 'will be considered a p.pos.d substiwte item.adjustments will conform generally to the progress schedulethen in effect and additionally will comply with any provi- b. CONTRACTOR shall submit sufficienm infnnation assions of the General Requirements applicable thereto. prv-ided below to allow ENGINEER to t .. i that theitem sf ;4ater-ial or equipment preposed is esscntmlly2. Proposed adjustments in the progress schedule that will equivalent to that na.ed and an aceptable substittchange the Contract Times (or Milestones) shall be therefor. Requests far revie;y of proposed suhstitat itis.submitted in accordance with the requirements of Article of naterial or equipment will net be accepted by-ENGl-12. Such adjustments may only be made by a Change Order NEER &am anyo.e other tl n CONTRACTOR...or Written Amendment in accordance with Article 12.e.The procedurfe for review, by ENCIEER ill be a-6.05 Deleted 6.05S.b..... s 2 ..." > qua" set forth in paragraph 6,05.A.2.d, as sppl p....d , in theGertejlal Requirements anid as ENGINEE R may decide isA. When.r an ite-- of m"ei' or cqu.fflmnt is appropriate andorthe cir mstanc.specified or described in the Contract Docuiments by uisingthe name of a p.op.ie- item or thc names f a paftioular I. CONTRACTOR shall .;t F.. make ien appieaeon. toSupplier, the specification Or descriptin is intended to ENGINEER for r''iev.r of a p-oposed substitate item ofestablish the tsre, f.inetion., appearance, and quality materia.l or equipment th a CONTRACTOR seek.;. to fur.ishreqtuired. Unless the speeifi cation or description eontains or or Use. The application shall certify that the praeosedEJCDC No. 1910-8 (1996 Edition) 007200-20w/ JJG Modifications (Rev03/'06/08)
substitte item will perform adequately the funetions andachieve the results called for by the general design, be E. EAGL...R'. C10# Re44ibw r..... ENGINPERsimilar in substancee to that specified, anid be suited to the v.4ll reor PA timeA required by ENGINEEFR Andsame uie as that sVecified. The applicotien ;,41 state the ENGINER'- Consultants in ev~aluating substteproposedextent, if any, to which the use of the proposed substitt or submitted by CONTRACTOR pursuant to paragrahsitem will prejudice CONTRACTOR's achievef.ent o0 6.05.2 and 6.05.24 an.d in n..ing changes in; the C.OntfastSubstanltial Comffpletion en time,. wAhether Or rot uSe Of the DocumeRn (Or in thle previsionS of any ether direct contractproposed substimate item in the Work0FI will require a changew..ith OWINER for worik ont the Project) ocasioned thereby.in a.y ef the Contract Documents (or in the provisions eV.......r. not EN.NEER appro.es a substitu.te item soany other direct cen11Fact with O9IER, for worl, on the proposed or submitted b3y CONTRACTOR, CONProject) to adapt the design to the proposed substitute item TRACR-TO shall reimurs 01 T1ER for the chargeLs Ofand. whether Or not ineoa:oration or "ue of the proposed ENGINEER and NG IN ER':G; Conultants for evaluatingsubstitute item in eouaeetioa with the WorAk is subject to eahsc rooe 4usitute.payment Of any license fee Ar rOyalty. All yaations of thep .OPO.O..uibstitute iem farom that specified v.411 e ideni .1. CON TRCTO.R p CONTRAC.TOR shallfled in the applicai, and a .ailable engineering, sales, provide all data in support of an) proposed substitute ormaintenanee, rFePa., and. replacem entservices will hetr ea at.C......TOR.s expnseindicated. The application will al'o cRntain an itemizedes:timllate Of all costs Or credits that will reAut directly or 6.06 Concerning <strong>Subcontractors</strong>, Suppliers, and Othersindirectly from use of-such sbttt tm nldn otof redesign and claims of other ecntractors affected by an) A. CONTRACTOR shall not employ any Subconresultingchange, all of 'vhis h .41 be considered 5 tractor, Supplier, or other individual or entity (includingENGNEr . in ev.....n1 the pr-posed s ite. those acceptable to OWNER as indicated in paragraphEN( N1 ER ay r' equire CONTRACTOR tO fHi'41 6.06.B), whether initially or as a replacement, against whomadditional data abou t the proposed substitute im.OWNER may have reasonable objection. CONTRACTORshall not be required to employ any Subcontractor, Supplier,B. Deleted S:,bsetzt Ccust:v, tip Artads or or other individual or entity to furnish or perform any of therh-s... rt:if a pecific mean., m.ethod, techique, s Work against whom CONTRACTOR has reasonablequene, or procedure of onot..tion is showni or indicated objection.in and4 express5 requiaed by the C ontract Doetuatfflis.CONTRACTOR may' fraish or utilize a s'ubstitute means, B. Deleted. if the Supplementam' Conditions requiremethod, teehi.ique, sequence, r procedure of cantetin the-identity of cefainapproved by ENGIEER. CONTRACTOR sha ubmit individtal or ettic, to he submitted to OWNER insufficienlt infi~atian to alo sA EN SGINEER, in advancie for acceptance by 0'TR by a spcceifed dateENGINEER's sole discretion, to detenranie that the ptior to the Effective Date of the Agreemert, and itsubstitte proposed is eq.ivalent to that e.prcssly c.aled fr CONTRPXCTOR hias subm.itied a list thefef in ae ordaneby the Contract Pocument.9. The procedure for review by with the Supplementag' Conditions, 0VALJER's aceeptaneENGINER ;N411 be similar to that provided in subpara (either in writing er by faling to mae witen obje tionaph 6.5.A.2thefeo by the date indicated for. ac.eptance or objection inthe Bidding Docuetnt or the Contract Docetft) Of any9C. Engihot ..... v0 .E4aton:- ENGI I EER wil be sch Subcontracter, Supplier, or ether individual or nityal..owed a .... time . within which to ealuat each so identified May be revoked an the basi of reasonablefroposal Or oubm+ittl mfade pu.rsu.ant to paragrapehs 60- objectien after due investigation. CONT..A... . . shalland 6.05.B. ENGEINFER will be the sole judge of weept submit an acceptable replaement for the rejectedability. N. "or eual" or substitute will be "rdred, Subcontractor, Supplier, or other individual or entily, andinistalled or utilized uintil EN(CILER's review is emplete, the Contacat Price YAIl be adjusted by the difference in. the'hiEch will be ev'idpeed by either a Change Order forcost occasioned by such replacemontff, and an appropriatesubStimte Or an approved Shop Drawing for an a "" r uChe"age Order will be issued Or Written Panendmcut signed.E NGINEERZ will adv ise CONTRACTOR ini Arting ofany No acceptance by OIWNER of any such Subcontractor,negativ eSupplier-.,r other individual or entity, w.hether initially or asa replacement, shall constitte a .vaiver of any right otD. Sffcci&'[ C Hjwlfoee.: OVsER aya r qair CON OV.hIER Or ENGINEER te reject defetiw'e Wari.TRACTO:R to ft-'Hish at CONTRACTOR> pspecial peh " an..e guarantee ... thei t....... Aith r .p C. CONTRACTOR shall be fully responsible toto ai)' sabstitte.OWNER and ENGINEER for all acts and omissions of theEJCDC No. 1910-8 (1996 Edition) 007200-21w/ JJG Modifications (RcO03/06/08)
- Page 1 and 2:
ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4:
( 0ORO t'The Unified Government of
- Page 5 and 6:
R: No change to bid date.3- Q: (AG)
- Page 7 and 8:
Part IGeneralSection 01 57 00Enviro
- Page 9 and 10:
005700-3Environmental and Property
- Page 11 and 12:
JORDANJONES &SGOULDINGList of Planh
- Page 13 and 14:
List of Planholders, Athens North O
- Page 15 and 16:
RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18:
AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20:
* Delete page 00520-5 and replace w
- Page 21 and 22:
otherwise.F. Should either party re
- Page 23 and 24:
4gas well as construction of the la
- Page 25 and 26:
QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28:
Also on drawing 05-CD-1 typical roa
- Page 29 and 30:
R: No change will be made to the do
- Page 31 and 32:
R: Apply protective liner to all in
- Page 33 and 34:
16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36:
induction motor data sheet.a) Is th
- Page 37 and 38:
conduit size for P39 to be 1-1/2".
- Page 39 and 40:
R: No change will be made to the do
- Page 41 and 42:
(TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44:
(1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46:
004100-3Bidf. Utility Location Allo
- Page 47 and 48:
004100-5BidIte No Decito Qty uni Un
- Page 49 and 50:
0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52:
004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54:
0041 00-11BidThe Bidder agrees here
- Page 55 and 56:
EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58:
March 7, 2008 Amended May 13, 2008T
- Page 59 and 60:
System Controls:Not included in thi
- Page 61 and 62:
* No performance and laboratory tes
- Page 63 and 64:
C. Seller is familiar with and is s
- Page 65 and 66:
Project: Athens, GA North Oconee Ma
- Page 67 and 68:
ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70:
Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72:
ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74:
Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76:
1635W. Walnut StreetTU R B LEX Spri
- Page 77 and 78:
B. $ 33,658.00 The Seller's monthly
- Page 79 and 80:
Quotation # 08RAS-027-01Yancey Powe
- Page 81 and 82:
-k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84:
Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86:
- Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88: Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90: Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92: NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94: Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96: SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98: SC 15: Add the followtng paragraph:
- Page 99 and 100: 0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102: U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104: QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106: would the OCP policy not be enough
- Page 107 and 108: properties used in it methods allow
- Page 109 and 110: 12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112: R: Refer to 05-CU drawings and Spec
- Page 113 and 114: R: See subsequent addenda.Zone 2 84
- Page 115 and 116: actually a refractor 545 or if a re
- Page 117 and 118: ~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120: STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122: GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124: 29. Notice to Proceed--A written no
- Page 125 and 126: within the Contract Time, or extend
- Page 127 and 128: others as appropriate will be held
- Page 129 and 130: 3.04 Amending and Supplementing Con
- Page 131 and 132: a. reviewing and checking all such
- Page 133 and 134: Documents. CONTRACTOR shall also fu
- Page 135 and 136: 5. allow for partial utilization of
- Page 137: ARTICLE 6 - CONTRACTOR'S RESPONSIBI
- Page 141 and 142: permits and licenses. CONTRACTOR sh
- Page 143 and 144: esponse to such an emergency, a Wor
- Page 145 and 146: 1. is attributable to bodily injury
- Page 147 and 148: 8-05 Lands andEasements; Reports an
- Page 149 and 150: accordance with the provisions of p
- Page 151 and 152: such Claim, dispute, or other matte
- Page 153 and 154: equipment brought to the Project if
- Page 155 and 156: the ENGINEER and the other party to
- Page 157 and 158: incorporation in the Work. Such ins
- Page 159 and 160: ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162: 2. Should CONTRACTOR neglect to pay
- Page 163 and 164: 14.07 Final Payment ENGINEER will r
- Page 165 and 166: Documents in connection with uncomp
- Page 167 and 168: ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170: tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172: Copyright C 2 000National Society o
- Page 173 and 174: AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176: 6.04 Seller and Buyer shall execute
- Page 177 and 178: D. The Contract Documents may only
- Page 179 and 180: ATTACHMENT ASnecificationsSection T
- Page 181 and 182: PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184: ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186: PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188: Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190:
Furt-her,.p ease advise me ifyou wi
- Page 191 and 192:
Copyright 02000National Society of
- Page 193 and 194:
AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196:
6.04 Seller and Buyer shalt execute
- Page 197 and 198:
ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker