B. The policies of insurance so required by this 5.05 OWNER's Liability Insuranceparagraph 5.04 to be purchased and maintained shall:A- In addition to the insurance required to be provided by1. with respect to insurance required by paragraphs CONTRACTOR under paragraph 5.04,5.04.A.3 through 5.04.A.6 inclusive, include as additional OWNERCONTRACTOR shall, at OWN.ER's option, mayinsureds (subject to any customary exclusion in respect of purchase and maintain at OIWNER's expense OWNER'sprofessional liability) OWNER, ENGINEER, ENGINEER's own liability insurance as will protect OWNER againstConsultants, and any other individuals or entities identified claims which may arise from operations under the Contractin the Supplementary Conditions, all of whom shall be listed Documents.as additional insureds, and include coverage for the respectiveofficers, directors, partners, employees, agents, and 5.06 Property Insuranceother consultants and subcontractors of each and any of allsuch additional insureds, and the insurance afforded to these A. CONTRACTOR shall purchase and maintainadditional insureds shall provide primary coverage for all propert v insurance upon the Work at the site, written onclaims covered thereby;the completed value form, in an amount equal to the totalbid price for the completed construction.A Unless -2. include at least the specific coverages and be written Otherwise provided inl the Supplemenitafy Ctnditins,for not less than the limits of liability provided in the OM/NER shall pur.hase and aintain propert in.uranc.Supplementary Conditions or required by Laws or upon the Wrki at the Site in the an.unt of th. _fulRegulations, whichever is greater; replacement Cost...r..f (subject to such.d.ductibamo4unts as may be provided in the Supplementa"y3. include completed operations insurance; Cnditienao r required by Laws and Regulations). Thisinsurance shall:4. include contractual liability insurance coveringCONTRACTOR's indemnity obligations under paragraphs 1. include the interests of OWNER, CONTRACTOR,6.07, 6.11, and 6.20; <strong>Subcontractors</strong>, ENGINEER, ENGINEER's Consultants,and any other individuals or entities identified in the5. contain a provision or endorsement that the coverage Supplementary Conditions, and the officers, directors,afforded will not be canceled, materially changed or partners, employees, agents, and other consultants andrenewal refused until at least thirty days prior written notice subcontractors of each and any of them, each of whom ishas been given to OWNER and CONTRACTOR and to deemed to have an insurable interest and shall be listed aseach other additional insured identified in the an additional insured;Supplementary Conditions to whom a certificate ofinsurance has been issued (and the certificates of insurance 2. be written on a Builder's Risk "all-risk" or open perilfurnished by the CONTRACTOR pursuant to paragraph or special causes of loss policy form that shall at least5.03 will so provide); include insurance for physical loss or damage to the Work,temporary buildings, false work, and materials and6. remain in effect at least until final payment and at all equipment in transit, and shall insure against at least thetimes thereafter when CONTRACTOR may be correcting, following perils or causes of loss: fire, lightning, extendedremoving, or replacing defective Work in accordance with coverage, theft, vandalism and malicious mischief,paragraph 13.07; andearthquake, collapse, debris removal, demolition occasionedby enforcement of Laws and Regulations, water damage,7. with respect to completed operations insurance, and and such other perils or causes of loss as may be specificallyany insurance coverage written on a claims-made basis, required by the Supplementary Conditions;remain in effect for at least two years after final payment(and CONTRACTOR shall furnish OWNER and each other 3. include expenses incurred in the repair or replacementadditional insured identified in the Supplementary of any insured property (including but not limited to feesConditions, to whom a certificate of insurance has been and charges of engineers and architects);issued, evidence satisfactory to OWNER and any suchadditional insured of continuation of such insurance at final 4. cover materials and equipment stored at the Site or atpayment and one year thereafter).another location that was agreed to in writing by OWNERprior to being incorporated in the Work, provided that suchmaterials and equipment have been included in anApplication for Payment recommended by ENGINEER;EJCDC No. 1910-8 (1996 Edition) 007200- 16w/ JJG Modifications (RevO3/06/08)
5. allow for partial utilization of the Work by OWNER; E. Deleted. . if 4NTRACTOR1 requests in AT"ir.gthat Othcr sfeial insv-rancee be included in the propeAr,6. include testing and startup; and insurance pelicics provided unade paragrph 5.06, OWN Rshall, if possible, include such iiswanee, and the east7. be maintained in effect until final payment is made thereof will be charged tW CONTPACTOR by appropRiateunless otherwise agreed to in writing by OWNER, Change Order or Writtenl Amendment. Prr to cAMCONTRACTOR, and ENGINEER with 30 days written .no.ment of the Work at the Site, OWNER shall innotice to each other additional insured to whom a certificate ATiting advise CONTRACTOR whether or nt sc h othirof insurance has been issued.in .rr bee b.pr.d by OW NER.B. Deleted. P. O47NRt shall purchase and maintain 5.07 Waiver of Rightssueh boiler and maehinery insurance or additional pFrperinsuance as may be required by Lhe Supp!mentay Cendi A. Deleted.A. OWNER and CONTRACTORions or Laws and RegulAions which will include the intend that all pelicieas purchased in ....... it h p..ainterests o ,ALNER. CONTRACTOR, Sucontractor. .aph 5.06 'sill protect O3AER, CONTRACTOR,ENGINEER. ENGINEER's CoGnsultants, and any ether Subcontrnctors, ENGI1NEER, ENGINEER's Consultants,individuals or entities identified in the Supplementary and all ether individuals or entities identified in the SuppleConditions, each ef whom is deefmed to have an insurable ..e..tary. Ckfnldition..s to be listed as insureds Or additionalinterest and shall be listed as An, in-uivdi or additional insufe(4o (andI the afficcz, difeetef, paftners, employees,in . agents, and other casltatnts and subcontractors of each andany of thei) in such policies and Will pr..id prilaryC. Certificates acceptable to the OWNER shall be attached eeverage for all losses and datmages caused by the perils orto the signed Contract Documents when they are transmitted causes of ss ored thereby. All such policies shallto the OWNER for execution. All certificates of insurance es..tain pe.isins to toe effect that in the event of paymentissued in conjunction with this Contract shall contain the of any, los or d. .ge toe insurefs ill have no rightst .statement that "Coverages afforded under the policies shall recover against any of the inseds or additional i..redsnot be cancelled unless at least 60 days prior to cancellation therouF.der. OVhJER and cONTpRCTOR wai'e al rghtswritten notice has been Q4iven to the OWNER, ENGINEER, against each ot;her and their respective officers, directors,and each additional insured as evidenced by receipts of p..ers, employees, agents, and other e...t.. t andregistered or certified mail."s.u."be Fawtos of eh and any Of theli f o all lescs anddamages caused by, arising out afarf resuting From. arly ofC. All the polieieg ofr rrtiane (and the certifiistesor the perils or caues f ls ewo. e b5d such policies and anyether .vi.. ... required to be purchased and other prope insurance applcable to the Wrlk and, inmai in aeerdanee>th parzagaph 5.06 will contan. additionl, waive aill such rights againist Sbo~cosprevision orat.the ti.n.........cevorage . af .Ld wll ENGINEER, ENGINEER's Consulant, and All othene.t be eancoled or nlaterally changed or renewal reffsed individuals or entities iden;ified in the sc...cn......ta.until at least 30 days prior wr4iten notice has been given-to Co9nditions to be litdas insureds Or additional inisurediOVNER and CONTRACTOR and to each other additionnl (and .a the offi.. direeton;, . pa.ters, e... pl... , gents andinsured t cA4om a certificate of insurance has been issaed other consultants and subcontractoa of each and any otan.dwl.w provsions inac Wth then) under such policies for leases and taff.gs so caused.paagraph447No.ne of the above waiver:; shl extend to the rights tatan~y pa y fnring suceh waiver may; have to the p~eeeeD. Deleted. D. OWNER shall noat be eso nsible forinsurc e held by OWNER .erwise as trstee or payablepure.as g an.d maintaining any prope .nsurae ander any poliy so issued.specified in this ptagraph 5.06 to preect the interests ofCONTRACTOR, Subco1tractor.s, or others in the Work to B. OWNER waives all rights againstthe extent of anv deductible amounts r.t are. identified in CONTRACTOR, <strong>Subcontractors</strong>, ENGINEER,t Supplemntary Conditicns. The risk of los within such ENGINEER's Consultants, and the officers, directors,identified ded"ctihle anHount w;'ill be boin-he by CON partners, employees, agents, and other consultants andT.CTOR, <strong>Subcontractors</strong>, or others suffiering any such subcontractors of each and any of them for:loss, sand if anly of diem wishes froperzty insuraieez.ergewithin :he li-it" of such amounts, each may pzurchase ai.dmaintain it at the purchaser's ov, experse,1. loss due to business interruption, loss of use, or otherconsequential loss extending beyond direct physical loss ordamage to OWNER's property or the Work caused by,EJCDC No. 1910-8 (1996 Edition) 007200-17w/ JJG Modifications (Rev03/06/08)
- Page 1 and 2:
ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4:
( 0ORO t'The Unified Government of
- Page 5 and 6:
R: No change to bid date.3- Q: (AG)
- Page 7 and 8:
Part IGeneralSection 01 57 00Enviro
- Page 9 and 10:
005700-3Environmental and Property
- Page 11 and 12:
JORDANJONES &SGOULDINGList of Planh
- Page 13 and 14:
List of Planholders, Athens North O
- Page 15 and 16:
RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18:
AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20:
* Delete page 00520-5 and replace w
- Page 21 and 22:
otherwise.F. Should either party re
- Page 23 and 24:
4gas well as construction of the la
- Page 25 and 26:
QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28:
Also on drawing 05-CD-1 typical roa
- Page 29 and 30:
R: No change will be made to the do
- Page 31 and 32:
R: Apply protective liner to all in
- Page 33 and 34:
16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36:
induction motor data sheet.a) Is th
- Page 37 and 38:
conduit size for P39 to be 1-1/2".
- Page 39 and 40:
R: No change will be made to the do
- Page 41 and 42:
(TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44:
(1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46:
004100-3Bidf. Utility Location Allo
- Page 47 and 48:
004100-5BidIte No Decito Qty uni Un
- Page 49 and 50:
0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52:
004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54:
0041 00-11BidThe Bidder agrees here
- Page 55 and 56:
EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58:
March 7, 2008 Amended May 13, 2008T
- Page 59 and 60:
System Controls:Not included in thi
- Page 61 and 62:
* No performance and laboratory tes
- Page 63 and 64:
C. Seller is familiar with and is s
- Page 65 and 66:
Project: Athens, GA North Oconee Ma
- Page 67 and 68:
ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70:
Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72:
ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74:
Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76:
1635W. Walnut StreetTU R B LEX Spri
- Page 77 and 78:
B. $ 33,658.00 The Seller's monthly
- Page 79 and 80:
Quotation # 08RAS-027-01Yancey Powe
- Page 81 and 82:
-k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84: Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86: - Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88: Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90: Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92: NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94: Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96: SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98: SC 15: Add the followtng paragraph:
- Page 99 and 100: 0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102: U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104: QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106: would the OCP policy not be enough
- Page 107 and 108: properties used in it methods allow
- Page 109 and 110: 12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112: R: Refer to 05-CU drawings and Spec
- Page 113 and 114: R: See subsequent addenda.Zone 2 84
- Page 115 and 116: actually a refractor 545 or if a re
- Page 117 and 118: ~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120: STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122: GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124: 29. Notice to Proceed--A written no
- Page 125 and 126: within the Contract Time, or extend
- Page 127 and 128: others as appropriate will be held
- Page 129 and 130: 3.04 Amending and Supplementing Con
- Page 131 and 132: a. reviewing and checking all such
- Page 133: Documents. CONTRACTOR shall also fu
- Page 137 and 138: ARTICLE 6 - CONTRACTOR'S RESPONSIBI
- Page 139 and 140: substitte item will perform adequat
- Page 141 and 142: permits and licenses. CONTRACTOR sh
- Page 143 and 144: esponse to such an emergency, a Wor
- Page 145 and 146: 1. is attributable to bodily injury
- Page 147 and 148: 8-05 Lands andEasements; Reports an
- Page 149 and 150: accordance with the provisions of p
- Page 151 and 152: such Claim, dispute, or other matte
- Page 153 and 154: equipment brought to the Project if
- Page 155 and 156: the ENGINEER and the other party to
- Page 157 and 158: incorporation in the Work. Such ins
- Page 159 and 160: ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162: 2. Should CONTRACTOR neglect to pay
- Page 163 and 164: 14.07 Final Payment ENGINEER will r
- Page 165 and 166: Documents in connection with uncomp
- Page 167 and 168: ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170: tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172: Copyright C 2 000National Society o
- Page 173 and 174: AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176: 6.04 Seller and Buyer shall execute
- Page 177 and 178: D. The Contract Documents may only
- Page 179 and 180: ATTACHMENT ASnecificationsSection T
- Page 181 and 182: PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184: ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186:
PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188:
Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190:
Furt-her,.p ease advise me ifyou wi
- Page 191 and 192:
Copyright 02000National Society of
- Page 193 and 194:
AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196:
6.04 Seller and Buyer shalt execute
- Page 197 and 198:
ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker