20.08.2015 Views

Subcontractors

ADDENDUM X

ADDENDUM X

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

004100-3Bidf. Utility Location Allowance $ 20,000.00Utility Relocation for the existing North Oconee $ 25,000.00Treatment Facility and EPA Buildingh. Engineer's Field Office Furnishings and Allowance $ 50,000.00Equipmenti. Owner's Office Furnishings and Lab Equipment Allowance $ 80,000.00J'Unforeseen Site Conditions and Utility Allowance $ 1,000,000.00Conflictsk. Removal of Hazardous Substances as Allowance $ 200,000.00DirectedI. Telephone Communication System Allowance $ 100,000.00m. Site Security System Allowance $ 400,000.00n. Landscaping and Signage Allowance $ 150,000.00o. Overtime Inspection Allowance $ 160,000.00p. Cleaning of Digester Allowance $ 200,000.00**** ADDITIONAL WORK IF ORDERED BY THE ENGINEER ....4. Erosion Controla. Construction Exits 1 EA $ $b. Type C Silt Fence 2,000 LF $ $c. Inlet Protection/Gravel 5 EA $ $d. Inlet Protection 5 EA $ $e. Inlet Protection/Pigs in Blanket 5 EA $ $f. Stone Check Dams 5 EA $ $g. Rip Rap 100 CY $ $5. Trench Stabilizationa. Beyond Bedding 300 CY J$Removal of Unsuitable Material and 1 T6. Replacement Witha. Crushed Stone 300 CY $ $b. Suitable Earth Material 300 CY $ $05/16/08 2001-158\XA 00 41 00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!