20.08.2015 Views

Subcontractors

ADDENDUM X

ADDENDUM X

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ORGContract, all Bidders and component suppliers must ensurethat there is full compliance with all applicable laws of thestate of Georgia and any other state governing professionalengineering. The Owner and Engineer do not warrant thatthe name of an entity listed as an acceptable manufacturer orsupplier is or will be in compliance with said laws."6. Page 00 73 00-1, following Paragraph 4.02.C, delete Paragraphs 4.02.C.1 and4.02.C.2. Renumber subsequent paragraphs.7. Page 01 10 11-3, Article 1.05, Paragraph C.1,Change,"Owner will provide information to the Contractor as soon asit is known"To"Gary's Grading & Pipeline Co., Inc.7434 Highway 81Monroe, Georgia 30656770-267-1270"8. Page 01 10 11-7, Article 1.07, delete Paragraph J in its entirety and relettersubsequent paragraphs.9. Page 01 10 11-9, Article 1.09, delete Paragraph D in its entirety and replace withthe following,"D.Except for the existing digesters, the Owner shall be responsible fordraining and cleaning existing operating tanks and structures prior todemolition or other scheduled construction activities. The Contractorshall identify this activity within the Construction Project Schedule asa predecessor to the corresponding work activity."10. Page 01 29 00-5, Article 1.03, delete Paragraph 14 in its entirety and replace withthe following,"14. Landscaping and Signage Allowance: This allowance may be used,as authorized and directed by the Engineer, to pay the costs ofadditional work involving landscaping and main entrance signage,where the cost amounts are determined as specified in the GeneralConditions for Lump Sum changes or Time and Expense changes.This work is not shown or specified in the Drawings andSpecifications bid by the Contractor and not covered by another lineitem in the Bid, may be required in the event the Engineer or Ownerestablishes the need for additional work deemed to be necessary forthe successful completion of this contract. Costs associated withgrassing, sodding, plantings shown on the Drawing and/or specified,#00280 Addendum 9 BIDdoc Page 5 of 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!