7.02 Coordination ENGINEER's Consultants DESIGNER. DESIGNER'sConsultants or the officers, directors, employees, agents,A. If OWNER contracts with others for the performance or other consultants of each and any of them or permit anyof other work on the Site, the CONTRACTOR shall attend action against any of them to be maintained and continuedand participate in coordination meetings with the other on- in its name or for its benefit in any court or before anysite contractors. If OWNER intends to contract vth other mediator or arbitrator which seeks to impose liability onfor the perfarmance of oher erk an tonhe Project at the Site, or to recover damages from OWNER, ENGINEER, orthe following will be set forth in SupplementuayConditions: ENGINEER's Consultants DESIGNER, DESIGNER'sConsultants or the officers, directors, employees, agents,1. t1e indi'-idual or entity who "ill have .ad authorityor other consultants of each and any of them on account ofresponsibility for coordination of the activit mong th" any such damage or claim. If CONTRACTOR is delayedva'iatswintractar ill l be identified;at any time in performing or furnishing Work by any actor neglect of a separate contractor and OWNER and2. the specific matters ta be overed by:uchauthorityand CONTRACTOR are unable to agree as to the extent ofrespansibilitywil be itemi.ed; andany adjustment in Contract Times attributable thereto,CONTRACTOR may make a claim for an extension of- the optont of such autharity enid responsibilities'ellbetimes in accordance with Article 12. An extension of thepContractTimes shall be CONTRACTOR's exclusiveremedy with respect to OWNER, ENGINEER, andB. Unless otherwise provided in the Supplementary ENGINEER's Consultants and the officers, directors,Conditions, OWNER shall have sole authority and respon- employees, agents, or other consultants of each and any ofsibility for such coordination,them for any delay, disruption, interference or hindrancecaused by any separate contractor. This paragraph doesC. Should CONTRACTOR cause damage to the not prevent recovery from OWNER, ENGINEER orwork or property of any separate contractor at the site, or ENGINEER's Consultant for activities that are theirshould any claim arising out of CONTRACTOR's respectiveits responsibilities.performance of the Work at the site be made by anyseparate contractor against CONTRACTOR, OWNER, ARTICLE 8 - OWNER'S RESPONSIBILITIESENGINEER, or ENGINEER's Consultants, DESIGNER,DESIGNER's Consultants or any other person, 8.01 Communications to ContractorCONTRACTOR shall promptly attempt to settle withsuch other contractor by agreement, or to otherwise A. Except as otherwise provided in these Generalresolve the dispute by mediation, arbitration, or at law, Conditions, OWNER shall issue all communications toCONTRACTOR shall, to the fullest extent permitted by CONTRACTOR through ENGINEER.Laws and Regulations, indemnify and hold OWNER,ENGINEER, and ENGINEER's Consultants DESIGNER, 8.02 Replacement of ENGINEERDESIGNER's Consultants and the officers, directors,employees, agents, and other consultants of each and anyA. In case of termination of the employment ofof them harmless from and against all claims, costs, losses ENGINEER, OWNER shall appoint an engineer towhamand damages. (including, but not limited to, all fees and CONTPXCTOR make:: no reascnablc objection, whosecharges of engineers, architects, attorneys and other status under the Contract Documents shall be that of theprofessionals and all court or arbitration or other dispute former ENGINEER.resolution costs) arising directly, indirectly orconsequentially out of or resulting from any action, legal 8.03 Furnish Dataor equitable, brought by any separate contractor againstOWNER, ENGINEER, or ENGINEER's Consultants A. OWNER shall promptly furnish the data requiredDESIGNER. DESIGNER's Consultants or the officer's, of OWNER under the Contract Documents.directors, employees, agents, or other consultants of eachand any of them to the extent based on a claim arising out 8.04 Pay Promptly When Dueof CONTRACTOR's performance of the Work. Should aseparate contractor cause damage to the Work or propertyA. OWNER shall make payments to CONTRACTORof CONTRACTOR or should the performance of work by promptly when they are due as provided in paragraphsany separate contractor at the site give rise to any other 14.02.C and 14.07.C.claim, CONTRACTOR shall not institute any action, legalor equitable, against OWNER. ENGINEER orEJCDC No. 1910-8 (1996 Edition) 007200-28w/ JJG Modifications (Rev03/06/08)
8-05 Lands andEasements; Reports and Tests responsibility in respect thereof will be as set forth in theSupplementary Conditions.A. OWNER's duties in respect of providing lands andeasements and providing engineering surveys to establish ARTICLE 9 - ENGINEER'S STATUS DURINGreference points are set forth in paragraphs 4.01 and 4.05. CONSTRUCTIONParagraph 4.02 refers to OWNER's identifying and makingavailable to CONTRACTOR copies of reports of explora- 9.01 OWNER'S Representativetions and tests of subsurface conditions and drawings ofphysical conditions in or relating to existing surface or A. ENGINEER will be OWNER's representativesubsurface structures at or contiguous to the Site that have during the construction period. The duties and responsibeenutilized by ENGINEER in preparing the Contract bilities and the limitations of authority of ENGINEER asDocuments.OWNER's representative during construction are set forthin the Contract Documents and will not be changed without8.06 Insurance written consent of OWNER and ENGINEER.A. OWNER's responsibilities, if any, in respect to pur- 9.02 Visits to Sitechasing and maintaining liability and property insurance areset forth in Article 5.A. ENGINEER will make visits to the Site at intervalsappropriate to the various stages of construction as8.07 Change Orders ENGINEER deems necessary in order to observe as anexperienced and qualified design professional the progressA. OWNER is obligated to execute Change Orders as that has been made and the quality of the various aspects ofindicated in paragraph 10.03.CONTRACTOR's executed Work. Based on informationobtained during such visits and observations, ENGINEER,8.08 Inspections, Tests, and Approvals for the benefit of OWNER, will determine, in general, if theWork is proceeding in accordance with the ContractA. OWNER's responsibility in respect to certain Documents. ENGINEER will not be required to makeinspections, tests, and approvals is set forth in paragraph exhaustive or continuous -inspections on the Site to check13.03.B.the quality or quantity of the Work. ENGINEER's effortswill be directed toward providing for OWNER a greater8.09 Limitations on OWNER's Responsibilities degree of confidence that the completed Work will conformgenerally to the Contract Documents. On the basis of suchA. The OWNER shall not supervise, direct, or have visits and observations, ENGINEER will keep OWNERcontrol or authority over, nor be responsible for, informed of the progress of the Work and will endeavor toCONTRACTOR's means, methods, techniques, sequences, guard OWNER against defective Work.or procedures of construction, or the safety precautions andprograms incident thereto, or for any failure of CON- B. ENGINEER's visits and observations are subjectTRACTOR to comply with Laws and Regulations applica- to all the limitations on ENGINEER's authority andble to the performance of the Work. OWNER will not be responsibility set forth in paragraph 9.10, and particularly,responsible for CONTRACTOR's failure to perform the but without limitation, during or as a result of ENGINEER'sWork in accordance with the Contract Documents. visits or observations of CONTRACTOR's WorkENGINEER will not supervise, direct, control, or have8.10 Undisclosed Hazardous Environmental authority over or be responsible for CONTRACTOR'sConditionmeans, methods, techniques, sequences, or procedures ofconstruction, or the safety precautions and programsA. OWNER's responsibility in respect to an undis- incident thereto, or for any failure of CONTRACTOR toclosed Hazardous Environmental Condition is set forth in comply with Laws and Regulations applicable to theparagraph 4.06.performance of the Work.8.11 Evidence of Financial Arrangements 9.03 Project RepresentativeA. If and to the extent OWNER has agreed to furnish A. If OWNER and ENGINEER agree, ENGINEERCONTRACTOR reasonable evidence that financial will furnish a Resident Project Representative to assistarrangements have been made to satisfy OWNER's ENGINEER in providing more extensive observation of theobligations under the Contract Documents, OWNER's Work. The responsibilities and authority and limitationsEJCDC No. 1910-8 (1996 Edition) 007200-29w/ JJG Modifications (Rev03/06/08)
- Page 1 and 2:
ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4:
( 0ORO t'The Unified Government of
- Page 5 and 6:
R: No change to bid date.3- Q: (AG)
- Page 7 and 8:
Part IGeneralSection 01 57 00Enviro
- Page 9 and 10:
005700-3Environmental and Property
- Page 11 and 12:
JORDANJONES &SGOULDINGList of Planh
- Page 13 and 14:
List of Planholders, Athens North O
- Page 15 and 16:
RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18:
AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20:
* Delete page 00520-5 and replace w
- Page 21 and 22:
otherwise.F. Should either party re
- Page 23 and 24:
4gas well as construction of the la
- Page 25 and 26:
QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28:
Also on drawing 05-CD-1 typical roa
- Page 29 and 30:
R: No change will be made to the do
- Page 31 and 32:
R: Apply protective liner to all in
- Page 33 and 34:
16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36:
induction motor data sheet.a) Is th
- Page 37 and 38:
conduit size for P39 to be 1-1/2".
- Page 39 and 40:
R: No change will be made to the do
- Page 41 and 42:
(TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44:
(1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46:
004100-3Bidf. Utility Location Allo
- Page 47 and 48:
004100-5BidIte No Decito Qty uni Un
- Page 49 and 50:
0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52:
004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54:
0041 00-11BidThe Bidder agrees here
- Page 55 and 56:
EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58:
March 7, 2008 Amended May 13, 2008T
- Page 59 and 60:
System Controls:Not included in thi
- Page 61 and 62:
* No performance and laboratory tes
- Page 63 and 64:
C. Seller is familiar with and is s
- Page 65 and 66:
Project: Athens, GA North Oconee Ma
- Page 67 and 68:
ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70:
Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72:
ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74:
Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76:
1635W. Walnut StreetTU R B LEX Spri
- Page 77 and 78:
B. $ 33,658.00 The Seller's monthly
- Page 79 and 80:
Quotation # 08RAS-027-01Yancey Powe
- Page 81 and 82:
-k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84:
Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86:
- Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88:
Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90:
Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92:
NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94:
Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96: SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98: SC 15: Add the followtng paragraph:
- Page 99 and 100: 0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102: U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104: QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106: would the OCP policy not be enough
- Page 107 and 108: properties used in it methods allow
- Page 109 and 110: 12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112: R: Refer to 05-CU drawings and Spec
- Page 113 and 114: R: See subsequent addenda.Zone 2 84
- Page 115 and 116: actually a refractor 545 or if a re
- Page 117 and 118: ~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120: STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122: GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124: 29. Notice to Proceed--A written no
- Page 125 and 126: within the Contract Time, or extend
- Page 127 and 128: others as appropriate will be held
- Page 129 and 130: 3.04 Amending and Supplementing Con
- Page 131 and 132: a. reviewing and checking all such
- Page 133 and 134: Documents. CONTRACTOR shall also fu
- Page 135 and 136: 5. allow for partial utilization of
- Page 137 and 138: ARTICLE 6 - CONTRACTOR'S RESPONSIBI
- Page 139 and 140: substitte item will perform adequat
- Page 141 and 142: permits and licenses. CONTRACTOR sh
- Page 143 and 144: esponse to such an emergency, a Wor
- Page 145: 1. is attributable to bodily injury
- Page 149 and 150: accordance with the provisions of p
- Page 151 and 152: such Claim, dispute, or other matte
- Page 153 and 154: equipment brought to the Project if
- Page 155 and 156: the ENGINEER and the other party to
- Page 157 and 158: incorporation in the Work. Such ins
- Page 159 and 160: ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162: 2. Should CONTRACTOR neglect to pay
- Page 163 and 164: 14.07 Final Payment ENGINEER will r
- Page 165 and 166: Documents in connection with uncomp
- Page 167 and 168: ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170: tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172: Copyright C 2 000National Society o
- Page 173 and 174: AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176: 6.04 Seller and Buyer shall execute
- Page 177 and 178: D. The Contract Documents may only
- Page 179 and 180: ATTACHMENT ASnecificationsSection T
- Page 181 and 182: PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184: ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186: PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188: Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190: Furt-her,.p ease advise me ifyou wi
- Page 191 and 192: Copyright 02000National Society of
- Page 193 and 194: AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196: 6.04 Seller and Buyer shalt execute
- Page 197 and 198:
ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker