arising out of, or resulting from fire or other peril whether A. If OWNER has any objection to the coverageor not insured by OWNER; andafforded by or other provision of the insurance required tobe purchased and maintained by CONTRACTOR in2. loss or damage to the completed Project or part thereof accordance with this Article 5 on the basis of its notcaused by, arising out of, or resulting from fire or other complying with the Contract Documents. OWNER willinsured peril or cause of loss covered by any property notify CONTRACTOR in writing there of within ten daysinsurance maintained on the completed Project or part of the date of delivery of such certificate to OWNER inthereof by OWNER during partial utilization pursuant to accordance with paragraph 2.05. CONTRACTOR willparagraph 14.05, after Substantial Completion pursuant to provide such additional information in respect ofparagraph 14.04, or after final payment pursuant to insurance provided by CONTRACTOR as OWNER mayparagraph 14.07.reasonably recuestA. If either OWNER or CONTR CTOR has any objection to the coverage afforded by or otherC. Any insurance policy maintained by OWNER provisions of the Bonds or inPF :;ranc required to becovering any loss, damage or consequential loss referred to purchased and maintained by the other party in accordancein paragraph 5.07.B shall contain provisions to the effect wi'th Article 5 on the basis of non cvnf rnance vith thethat in the event of payment of any such loss, damage, or Contract Documen.ts, the objecting pa rt shall so noti' theconsequential loss, the insurers will have no rights of other party in .'.tiag within 10 days after receipt of therecovery against CONTRACTOR, <strong>Subcontractors</strong>, cetificates (or other evidenc e Fe uested) required byENGINEER, or ENGINEER's Consultants and the officers, paragraph 2.05.G. OWNER and CONTRXPCTOR shalldirectors, partners, employees, agents, and other consultants each provide to the other s uc additional infcnmation inand subcontractors of each and any of them.respect of insurance provided as the other may reasonablyrequest. If either pat does not purchawseo ma.intain all of5.08 Receipt and Application ofInsurance Proceeds the Bonds and insua nce required of suh party by the ConTfact DOGeRicnts, such pa" shall noti6' the otherc P", inA. Deleted, A. Any isured loss under the policies of .iting Of such failure to purchase pfrio to the st4 of theinsurance required by pF'agraph 5.06 will be adjusted with Work, or of such failure to n.intain pior to any.. change inOVALNJER and made pay able to OWNEfR as ficia'4fo the the required coverage. Without prejudice to aniy othier Fightinsureds, as their inteests ay appear, suibject to the or remedy, the other: part) mfay, elect to obtain equivalenrequirements of any applicable mortgage clause and t B nd or insurance to protect such other par."°s interests atpm-agraph 5.08A2. ONER shall deposit in ae t the expense of the party who was required topFo.ide- ,sc.acouent any Money so reei.ed and hall.. dis. f... iineerage, and. a Change Ordershall be issued to adjust theaccordanc 'ith tool; agreement as the parties imtcrest Contact Price accordingly.nmy reach. if no other special ageer..ent is reached, thedamaged Work shall he repaired or rfeplaced, the moneys so 5.10 Partial Utilization, Acknowledgment of Propertyreceived applied en acco unt.heeo a...nd theW r.k and. InsurerPAti.e~rf covered by an appropriate Change Order orWritten Amendment,A. If OWNER finds it necessary to occupy or use aportion or portions of the Work prior to SubstantialB, Deleted. B. O NER as fiduciar, shall have ..... t Completion of all the Work as provided in paragraph 14.05,ajust and se 1 an lo I .. with . the is..e unless one. oft no such use or occupancy shall commence before theparte~s in .nerest shall object in .Titing within is days afge insurers providing the property insurance pursuant tothe occurren.e of loss to OWN'ER's exercise of this power. paragraph 5.06 have acknowledged notice thereof and inIf: "eh objection be made, OWNER as fiduciafsh ll writing effected any changes in coverage necessitatedmake settlement with the insurers in accordance '.t such thereby. The insurers providing the property insurance shallageement as the paien ...ees. -. , each. i fno .such consent by endorsement on the policy or policies, but theagrccmruat among the paities in interest is reached, O'.'ThEP property insurance shall not be canceled or permitted toas fiduciarY shall adjut, .ad set4l@ the los w.th the lsi .. r lapse on account of any such partial use or occupancy.and, if required in wting by afay part.. in interest, OWNERas .......g' shall give bond for the Proper performance osuch duties.5.09 Acceptance of Bonds and Insurance; Option toReplaceEJCDC No. 1910-8 (1996 Edition) 007200- 18w/ JJG Modifications (Rev03/06/08)
ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES6.02 Labor; Working Hours6.01 Supervision and SuperintendenceA. CONTRACTOR shall provide competent, skilledA. CONTRACTOR shall supervise, provide quality suitably qualified personnel to survey, lay out, and constructcontrol inspect, and direct the Work competently and the Work as required by the Contract Documents. CONefficiently,devoting such attention thereto and applying TRACTOR shall at all times maintain good discipline andsuch skills and expertise as may be necessary to perform the order at the Site. CONTRACTOR shall, upon demandWork in accordance with the Contract Documents. CON- from the ENGINEER, immediately remove any manager,TRACTOR shall be solely responsible for the means, superintendent, foreman or workman whom themethods, techniques, sequences, and procedures of ENGINEER or OWNER may consider incompetent orconstruction, but CONTRACTOR shall not be responsible undesirable.for the negligence of OWNER or ENGINEER in the designor specification of a specific means, method, technique, B. Except as otherwise required for the safety orsequence, or procedure of construction which is shown or protection of persons or the Work or property at the Site orindicated in and expressly required by the Contract adjacent thereto, and except as otherwise stated in theDocuments. CONTRACTOR shall be responsible to see Contract Documents, all Work at the Site shall bethat the completed Work complies accurately with the performed during regular working hours, and CON-Contract Documents. TRACTOR will not permit overtime work or theperformance of Work on Saturday, Sunday, or any legalB. At all times during the progress of the Work, holiday without OWNER's written consent (which will notCONTRACTOR shall assign a competent resident superin- be unreasonably withheld) given after prior written notice totendent thereto who shall not be replaced without written ENGINEER.notice to OWNER and ENGINEER except underextraordinary circumstances. The CONTRACTOR shall C. Regular workiny hours are defined as 8 hours perdesignate, in writing, a representative, hereinafter referred day, Monday through Friday, excluding holidays,to as superintendent, assigned to the site on a full-time occurring between the hours of 7:00 AM and 7:00 PM.basis during execution of the Work who shall have Requests to work other than regular working hours shallauthority to act on behalf of CONTRACTOR, including be submitted to ENGINEER not less than 48 hours priorexecuting the orders or directions of the ENGINEER to any proposed weekend work or scheduled extendedwithout delay. This representative shall have full work weeks. Occasional unscheduled overtime onauthority to promptly supply products, tools, plant weekdays may be permitted provided two hours notice isequipment, and labor as may be required to diligently given to ENGINEER.prosecute the Work. All communications given to orreceived from the stuperintendent shall be binding on 6.03 Services, Materials, and EquipmentCONTRACTOR. If at any time during the Project thesuperintendent leaves the Project site while Work is inA. Unless otherwise specified in the General Reprogress,ENGINEER shall be notified and provided with quirements, CONTRACTOR shall provide and assume fullthe name of the CONTRACTOR's representative having responsibility for all services, materials, equipment, labor,responsible chargte. transportation, construction equipment and machinery,tools, appliances, fuel, power, light, heat, telephone, water,C. The CONTRACTOR shall desi~aate the person sanitary facilities, temporary facilities, and all otherresponsible for CONTRACTOR's quality control while facilities and incidentals necessary for the performance,Work is in progress. ENGINEER shall be notified in quality control, testing, start-up, and completion of thewriting prior to any change in quality control representative Work.assitnent. B. At all tfir.zg during th c progress of theWorkIE, CONTRACTOR shall assign a ,ompetent resident B. All materials and equipment incorporated into thesup..n..dei.t thereto "h shall not be replaced "witht Work shall be as specified or, if not specified, shall be of-'itten notice to OWNER and ENGINEER except ttndcreaarfdifi3': circums ----- cc - The stifirint~dnt ,will begood quality and new, except as otherwise provided in theContract Documents. All warranties and guaranteesCONTPACTOPR's representativ' at the Site and shall have specifically called for by the Specifications shall expresslyauthority to act an behalf of CONTRACTOR. Al! run to the benefit of OWNER. If required by ENGINEER,aes.....noen given q or received frem the supein CONTRACTOR shall furnish satisfactory evidencetencnt s;hall be binding en: CONTRACTOR.(including reports of required tests) as to the source, kind,and quality of materials and equipment. All materials andEJCDC No. 1910-8 (1996 Edition) 007200- 19w/ JJG Modifications (Rev03/06/08)
- Page 1 and 2:
ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4:
( 0ORO t'The Unified Government of
- Page 5 and 6:
R: No change to bid date.3- Q: (AG)
- Page 7 and 8:
Part IGeneralSection 01 57 00Enviro
- Page 9 and 10:
005700-3Environmental and Property
- Page 11 and 12:
JORDANJONES &SGOULDINGList of Planh
- Page 13 and 14:
List of Planholders, Athens North O
- Page 15 and 16:
RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18:
AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20:
* Delete page 00520-5 and replace w
- Page 21 and 22:
otherwise.F. Should either party re
- Page 23 and 24:
4gas well as construction of the la
- Page 25 and 26:
QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28:
Also on drawing 05-CD-1 typical roa
- Page 29 and 30:
R: No change will be made to the do
- Page 31 and 32:
R: Apply protective liner to all in
- Page 33 and 34:
16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36:
induction motor data sheet.a) Is th
- Page 37 and 38:
conduit size for P39 to be 1-1/2".
- Page 39 and 40:
R: No change will be made to the do
- Page 41 and 42:
(TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44:
(1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46:
004100-3Bidf. Utility Location Allo
- Page 47 and 48:
004100-5BidIte No Decito Qty uni Un
- Page 49 and 50:
0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52:
004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54:
0041 00-11BidThe Bidder agrees here
- Page 55 and 56:
EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58:
March 7, 2008 Amended May 13, 2008T
- Page 59 and 60:
System Controls:Not included in thi
- Page 61 and 62:
* No performance and laboratory tes
- Page 63 and 64:
C. Seller is familiar with and is s
- Page 65 and 66:
Project: Athens, GA North Oconee Ma
- Page 67 and 68:
ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70:
Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72:
ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74:
Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76:
1635W. Walnut StreetTU R B LEX Spri
- Page 77 and 78:
B. $ 33,658.00 The Seller's monthly
- Page 79 and 80:
Quotation # 08RAS-027-01Yancey Powe
- Page 81 and 82:
-k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84:
Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86: - Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88: Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90: Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92: NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94: Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96: SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98: SC 15: Add the followtng paragraph:
- Page 99 and 100: 0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102: U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104: QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106: would the OCP policy not be enough
- Page 107 and 108: properties used in it methods allow
- Page 109 and 110: 12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112: R: Refer to 05-CU drawings and Spec
- Page 113 and 114: R: See subsequent addenda.Zone 2 84
- Page 115 and 116: actually a refractor 545 or if a re
- Page 117 and 118: ~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120: STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122: GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124: 29. Notice to Proceed--A written no
- Page 125 and 126: within the Contract Time, or extend
- Page 127 and 128: others as appropriate will be held
- Page 129 and 130: 3.04 Amending and Supplementing Con
- Page 131 and 132: a. reviewing and checking all such
- Page 133 and 134: Documents. CONTRACTOR shall also fu
- Page 135: 5. allow for partial utilization of
- Page 139 and 140: substitte item will perform adequat
- Page 141 and 142: permits and licenses. CONTRACTOR sh
- Page 143 and 144: esponse to such an emergency, a Wor
- Page 145 and 146: 1. is attributable to bodily injury
- Page 147 and 148: 8-05 Lands andEasements; Reports an
- Page 149 and 150: accordance with the provisions of p
- Page 151 and 152: such Claim, dispute, or other matte
- Page 153 and 154: equipment brought to the Project if
- Page 155 and 156: the ENGINEER and the other party to
- Page 157 and 158: incorporation in the Work. Such ins
- Page 159 and 160: ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162: 2. Should CONTRACTOR neglect to pay
- Page 163 and 164: 14.07 Final Payment ENGINEER will r
- Page 165 and 166: Documents in connection with uncomp
- Page 167 and 168: ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170: tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172: Copyright C 2 000National Society o
- Page 173 and 174: AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176: 6.04 Seller and Buyer shall execute
- Page 177 and 178: D. The Contract Documents may only
- Page 179 and 180: ATTACHMENT ASnecificationsSection T
- Page 181 and 182: PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184: ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186: PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188:
Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190:
Furt-her,.p ease advise me ifyou wi
- Page 191 and 192:
Copyright 02000National Society of
- Page 193 and 194:
AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196:
6.04 Seller and Buyer shalt execute
- Page 197 and 198:
ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker