A. Seller has examined and carefully studied the Contract Documents and the other related data.:B. If specified or if, in Seller's judgment, any local condition mayaffect cost, progress orthe.furnishing of the Goods andSpecial Services, Sellerhas:visited the point ofDestiaiatioxfaid bedome familiar with and is saiisfied as tb the l6calfnditions "thmay affect cost, progress or the furnishing of the Goods and Special Services.C. Seller is familiar with and is satisfied as to all local federalj state and local Laws and Regulations that may affect cost,progress and the furnishing of the Goods and Special Services.D. Seller has carefully studied and correlated the information known to Seller, and information and observations obtainedfrom Seller's visits, if any, to the Point of Destination, with the Contract Documents.E. Seller has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Seller has discovered inthe Contract Documents, and the written resolution thereof by Engineer is acceptable to Seller.F. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions forfurnishing Goods and Special Services.ARTICLE 10 - CONTRACT DOCUMENTS10.01 ContentsA. The Contract Documents consist of the following:I. This Agreement;2. General Conditions;3. Specifications bearing the title of Athens North Oconee Water Reclamation Facility (not attached, seeAttachment A for list of applicable sections);5. Drawings beating the title of Athens North Oconee Water Reclamation Facility (notattached, see AttachmentA forlist of applicable sheets);6. Exhibits to this Agreement (enumerated as follows):a. Seller's Proposal, consisting of the following:* Proposal Form (5 pages)* Quotation( 14 pages)* Email from Romey Schwieterman, dated May 14,2008,4:17 P.M. (1 page)7. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attachedhereto:a. Written Amndment(s);b. Change Order(s);c. Field Order(s);d. Engineer's Written Interpretation(s).B. The documents listed in paragraph 10.01 .A are attached to this Agreement (except as expressly noted otherwise above).EJCDC P-f2O Form of Agreement Betwen Buyer and Seller for Procurement ContractsCopyright CZOOO, National Society of Professional Engineers. All rights resenved.00520-502001-158 Diesel Engine Driven Generator Sets
Quotation # 08RAS-027-01Yancey Power Systems259 Lee Industrial slvP t hAustell, GA 30168-7406Project: North Oconee WWTP770.941.2424 tel770.941.2411 fax. Date Issued: 5-14-08877.278.6235 tog free Expiration: 12-3-08 (P.O. for Release)www.YaneyPower.Com Page# I of 14Proposal For Procurement ContractsTwo (2) New Caterpillar Diesel, 3516B, package generator sets, rated 2250kW Standby, 12,470 volt, 3 phase, 4wire, 60 hz, 1800 rpm each with the following features and equipment per packaged system:AIR INLET SYSTEM+ Aftercooler core, Material: copper nickel* Two turbochargers, center mounted, on 1800 rpm engines+ Air cleaner, regular duty with service indicatorCONTROL SYSTEM ...* Caterpillar ADEM - Electronic engine control, with speed control moduleCOOLING SYSTEM* Blower fan, fan drive and fan guard+ Radiator mounted to geriset, with initial coolant fill.* Jacket water pump, gear driven, centrifugal.* Water pump, gear driven, centrifugal.* Coolant level sensor* Jacket water heater, with isolation shut-off valves.EXHAUST SYSTEM* Dual Exhaust manifolds and housing, dry, 6 inch ID square flanged outlet+ Critical grade exhaust silencer* Flex assemblyFUEL SYSTEM* Engine mounted Racor fuel/water separator with changeover valve to permit changing filter while engine isrunning.* Fuel filter, RH with service indicator* Engine mounted fuel transfer pump (max. allowable head 9 ft.)* Electronic control unit injectors* Braided steel flexible fuel lines* Fuel priming pump+ Fuel cooler installed inradiatorGENERATORS AND GENERATOR ATTACHMENTS* Caterpillar, 105 degree C temp rise, two-bearing, heavy Duty, Brushless, 12,470 volt, SR4B generator, permanentmagnet excited, form wound, 2/3'rds pitch.* Stator RTD's with monitoring on control panel.* Generator bearing RTD's with monitoring on control panel.* Includes Caterpillar 3 phase voltage regulator* Generator space heater with t-stat* Oversized generator extension box with bus extensions for mounting differential and neutral CT's and powerconductor cables* One (1) Neutral grounding resistor for each genset.* Four (4) vibration sensors, dry contact type wired to control panel.INSTRUMENTATION* CAT EMCP 3.2 Genset Controller* Instrumentation: LCD .Display with adjustable contrast and backlight with auto power off.AC metering: Volts.3-phase (L-L & L-N); Amps (per phase & average); Frequency; kW (total & per phase);kVA (total & per phase); kVAr (total & per phase); Power Factor (overall & per phase); kW hours; kVAr hoursDC metering: Battery Volts; Engine Hours run; Engine Jacket Water Temperature (in 6C or 0 F); Lube OilPressure (In psi, kPa or bar); Engine Speed (rpm); Crank attempt counter; Start counter* Protection: Fail to start shutdown, Low oil pressure shutdown, High engine temperature, Approaching highcoolant temperature alarm, Approaching low oil pressure alarm, Not In auto mode alarm, Underspeed /Overspeed, Loss of Engine Speed Detection, Low I High battery voltage, Battery charger failure (If fitted),
- Page 1 and 2:
ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4:
( 0ORO t'The Unified Government of
- Page 5 and 6:
R: No change to bid date.3- Q: (AG)
- Page 7 and 8:
Part IGeneralSection 01 57 00Enviro
- Page 9 and 10:
005700-3Environmental and Property
- Page 11 and 12:
JORDANJONES &SGOULDINGList of Planh
- Page 13 and 14:
List of Planholders, Athens North O
- Page 15 and 16:
RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18:
AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20:
* Delete page 00520-5 and replace w
- Page 21 and 22:
otherwise.F. Should either party re
- Page 23 and 24:
4gas well as construction of the la
- Page 25 and 26:
QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28: Also on drawing 05-CD-1 typical roa
- Page 29 and 30: R: No change will be made to the do
- Page 31 and 32: R: Apply protective liner to all in
- Page 33 and 34: 16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36: induction motor data sheet.a) Is th
- Page 37 and 38: conduit size for P39 to be 1-1/2".
- Page 39 and 40: R: No change will be made to the do
- Page 41 and 42: (TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44: (1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46: 004100-3Bidf. Utility Location Allo
- Page 47 and 48: 004100-5BidIte No Decito Qty uni Un
- Page 49 and 50: 0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52: 004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54: 0041 00-11BidThe Bidder agrees here
- Page 55 and 56: EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58: March 7, 2008 Amended May 13, 2008T
- Page 59 and 60: System Controls:Not included in thi
- Page 61 and 62: * No performance and laboratory tes
- Page 63 and 64: C. Seller is familiar with and is s
- Page 65 and 66: Project: Athens, GA North Oconee Ma
- Page 67 and 68: ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70: Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72: ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74: Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76: 1635W. Walnut StreetTU R B LEX Spri
- Page 77: B. $ 33,658.00 The Seller's monthly
- Page 81 and 82: -k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84: Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86: - Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88: Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90: Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92: NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94: Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96: SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98: SC 15: Add the followtng paragraph:
- Page 99 and 100: 0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102: U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104: QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106: would the OCP policy not be enough
- Page 107 and 108: properties used in it methods allow
- Page 109 and 110: 12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112: R: Refer to 05-CU drawings and Spec
- Page 113 and 114: R: See subsequent addenda.Zone 2 84
- Page 115 and 116: actually a refractor 545 or if a re
- Page 117 and 118: ~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120: STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122: GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124: 29. Notice to Proceed--A written no
- Page 125 and 126: within the Contract Time, or extend
- Page 127 and 128: others as appropriate will be held
- Page 129 and 130:
3.04 Amending and Supplementing Con
- Page 131 and 132:
a. reviewing and checking all such
- Page 133 and 134:
Documents. CONTRACTOR shall also fu
- Page 135 and 136:
5. allow for partial utilization of
- Page 137 and 138:
ARTICLE 6 - CONTRACTOR'S RESPONSIBI
- Page 139 and 140:
substitte item will perform adequat
- Page 141 and 142:
permits and licenses. CONTRACTOR sh
- Page 143 and 144:
esponse to such an emergency, a Wor
- Page 145 and 146:
1. is attributable to bodily injury
- Page 147 and 148:
8-05 Lands andEasements; Reports an
- Page 149 and 150:
accordance with the provisions of p
- Page 151 and 152:
such Claim, dispute, or other matte
- Page 153 and 154:
equipment brought to the Project if
- Page 155 and 156:
the ENGINEER and the other party to
- Page 157 and 158:
incorporation in the Work. Such ins
- Page 159 and 160:
ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162:
2. Should CONTRACTOR neglect to pay
- Page 163 and 164:
14.07 Final Payment ENGINEER will r
- Page 165 and 166:
Documents in connection with uncomp
- Page 167 and 168:
ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170:
tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172:
Copyright C 2 000National Society o
- Page 173 and 174:
AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176:
6.04 Seller and Buyer shall execute
- Page 177 and 178:
D. The Contract Documents may only
- Page 179 and 180:
ATTACHMENT ASnecificationsSection T
- Page 181 and 182:
PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184:
ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186:
PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188:
Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190:
Furt-her,.p ease advise me ifyou wi
- Page 191 and 192:
Copyright 02000National Society of
- Page 193 and 194:
AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196:
6.04 Seller and Buyer shalt execute
- Page 197 and 198:
ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker