20.08.2015 Views

Subcontractors

ADDENDUM X

ADDENDUM X

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.02 Coordination ENGINEER's Consultants DESIGNER. DESIGNER'sConsultants or the officers, directors, employees, agents,A. If OWNER contracts with others for the performance or other consultants of each and any of them or permit anyof other work on the Site, the CONTRACTOR shall attend action against any of them to be maintained and continuedand participate in coordination meetings with the other on- in its name or for its benefit in any court or before anysite contractors. If OWNER intends to contract vth other mediator or arbitrator which seeks to impose liability onfor the perfarmance of oher erk an tonhe Project at the Site, or to recover damages from OWNER, ENGINEER, orthe following will be set forth in SupplementuayConditions: ENGINEER's Consultants DESIGNER, DESIGNER'sConsultants or the officers, directors, employees, agents,1. t1e indi'-idual or entity who "ill have .ad authorityor other consultants of each and any of them on account ofresponsibility for coordination of the activit mong th" any such damage or claim. If CONTRACTOR is delayedva'iatswintractar ill l be identified;at any time in performing or furnishing Work by any actor neglect of a separate contractor and OWNER and2. the specific matters ta be overed by:uchauthorityand CONTRACTOR are unable to agree as to the extent ofrespansibilitywil be itemi.ed; andany adjustment in Contract Times attributable thereto,CONTRACTOR may make a claim for an extension of- the optont of such autharity enid responsibilities'ellbetimes in accordance with Article 12. An extension of thepContractTimes shall be CONTRACTOR's exclusiveremedy with respect to OWNER, ENGINEER, andB. Unless otherwise provided in the Supplementary ENGINEER's Consultants and the officers, directors,Conditions, OWNER shall have sole authority and respon- employees, agents, or other consultants of each and any ofsibility for such coordination,them for any delay, disruption, interference or hindrancecaused by any separate contractor. This paragraph doesC. Should CONTRACTOR cause damage to the not prevent recovery from OWNER, ENGINEER orwork or property of any separate contractor at the site, or ENGINEER's Consultant for activities that are theirshould any claim arising out of CONTRACTOR's respectiveits responsibilities.performance of the Work at the site be made by anyseparate contractor against CONTRACTOR, OWNER, ARTICLE 8 - OWNER'S RESPONSIBILITIESENGINEER, or ENGINEER's Consultants, DESIGNER,DESIGNER's Consultants or any other person, 8.01 Communications to ContractorCONTRACTOR shall promptly attempt to settle withsuch other contractor by agreement, or to otherwise A. Except as otherwise provided in these Generalresolve the dispute by mediation, arbitration, or at law, Conditions, OWNER shall issue all communications toCONTRACTOR shall, to the fullest extent permitted by CONTRACTOR through ENGINEER.Laws and Regulations, indemnify and hold OWNER,ENGINEER, and ENGINEER's Consultants DESIGNER, 8.02 Replacement of ENGINEERDESIGNER's Consultants and the officers, directors,employees, agents, and other consultants of each and anyA. In case of termination of the employment ofof them harmless from and against all claims, costs, losses ENGINEER, OWNER shall appoint an engineer towhamand damages. (including, but not limited to, all fees and CONTPXCTOR make:: no reascnablc objection, whosecharges of engineers, architects, attorneys and other status under the Contract Documents shall be that of theprofessionals and all court or arbitration or other dispute former ENGINEER.resolution costs) arising directly, indirectly orconsequentially out of or resulting from any action, legal 8.03 Furnish Dataor equitable, brought by any separate contractor againstOWNER, ENGINEER, or ENGINEER's Consultants A. OWNER shall promptly furnish the data requiredDESIGNER. DESIGNER's Consultants or the officer's, of OWNER under the Contract Documents.directors, employees, agents, or other consultants of eachand any of them to the extent based on a claim arising out 8.04 Pay Promptly When Dueof CONTRACTOR's performance of the Work. Should aseparate contractor cause damage to the Work or propertyA. OWNER shall make payments to CONTRACTORof CONTRACTOR or should the performance of work by promptly when they are due as provided in paragraphsany separate contractor at the site give rise to any other 14.02.C and 14.07.C.claim, CONTRACTOR shall not institute any action, legalor equitable, against OWNER. ENGINEER orEJCDC No. 1910-8 (1996 Edition) 007200-28w/ JJG Modifications (Rev03/06/08)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!