20.08.2015 Views

Subcontractors

ADDENDUM X

ADDENDUM X

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

21. Q: (AW) Section 007328 (dated3-14-08)-i.02.c states general liability "shallprotect contractor and any subcontractor" A/W insurance will not protect usfrom subcontractors; it will however protect A/W for acts of our subcontractors.R: It is to protect the Contractor and Subcontractor, not protect "from"subcontractor.22. Q: (AW) 1.02.D states OCP with same limit as general liability, GL includes limitsfor Products & Comp Operations and Personal Injury, Fire Damage, MedicalExpense; which do not apply to OCP, so it is not possible to comply.R: No change.23. Q: (AW) 1.02.G. Builders Risk, what is the reason for carrying $10MM of extraexpense coverage?R: No change.24. Q: (AW) 1.04.B Waiver of subrogation, applies to Engineer, note the builders riskpolicy will not waiver subrogation in favor of the NE for acts or omissions of aprofessional nature.R: Understood but no change.26. Q: (AW) Section 00 72 00 (dated 3-6-08) 5.05 states contractor willpurchase/maintain owners liability insurance for claims under contract. Whywould the OCP policy not be enough coverage?R: No change.27. Q: (AW) 5.06.A.7 requires builders risk be maintained until final payment, thatshould be changed to substantial completion. Please Clarify.R: No change.31. Q: (AW) Specification Section 01 10 11 1.04E requires Owner's approval beforeany roadway or facilities are blocked off. The project requires that Bailey Streetbe permanently closed at the start of construction to begin the BiologicalTreatment Facility which would limit access to the existing plant. The existingwater and gas lines in Bailey Street would also be cut. Please confirm thatBailey Street maybe closed for construction at the start of construction andthere are no requirements for temporary access or temporary utilities.R: See Addendum No. 7.FROM QUESTIONS AND RESPONSES NO. 419. Q: (AG) On drawing 05-CS-2 and 4 there is a note calling out a 15' highlandscaped berm yet we cannot find any specifications for landscaping on thisproject, can this please be clarified?05116/08 02001-158A OR 5-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!