30.03.2017 Views

Local Development Plan

2oBkyQa

2oBkyQa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Comprehensive <strong>Development</strong> Scheme Laganbank Quarter, Lisburn<br />

Comprehensive <strong>Development</strong> Scheme Laganbank Quarter, Lisburn<br />

The Department of Social <strong>Development</strong> (DSD) adopted a Comprehensive<br />

<strong>Development</strong> Comprehensive The Department<br />

Area in <strong>Development</strong> of Social <strong>Development</strong><br />

February 2015. Scheme 31 The objective Laganbank (DSD) adopted<br />

is Quarter, a Comprehensive<br />

to secure Lisburn a<br />

<strong>Development</strong> Area in February 2015. 31 The objective is to secure a<br />

comprehensive, major mixed use scheme, in order to regenerate the<br />

comprehensive,<br />

Laganbank The Department major<br />

Quarter area of Social mixed<br />

of Lisburn, <strong>Development</strong> use scheme,<br />

enhance (DSD) in order<br />

the City adopted to regenerate<br />

Centre’s a Comprehensive the<br />

regional<br />

Laganbank<br />

role, <strong>Development</strong> Quarter<br />

integrate with Area the in area<br />

surrounding February of Lisburn, 2015. enhance<br />

urban 31 fabric The objective the City<br />

and strengthen is Centre’s to secure regional<br />

links a<br />

with comprehensive, role, integrate with<br />

the River Lagan. major the mixed surrounding use scheme, urban in fabric order and to strengthen regenerate links the<br />

Laganbank with the River Quarter Lagan. area of Lisburn, enhance the City Centre’s regional<br />

The role, aims integrate of the non-statutory with the surrounding <strong>Development</strong> urban Scheme fabric in and relation strengthen to retail links<br />

The aims of the non-statutory <strong>Development</strong> Scheme in relation to retail<br />

include with amongst the River others: Lagan.<br />

include amongst others:<br />

• The Maximising aims of the and non-statutory capitalising on <strong>Development</strong> the undeveloped Scheme riverside in relation location to retail<br />

• Maximising and capitalising on the undeveloped riverside location<br />

• include Enhancement amongst of others:<br />

retail function and overall attractiveness of the<br />

• Enhancement of the retail function and overall attractiveness of the<br />

City Centre<br />

City Centre<br />

• Enhancing<br />

• Maximising<br />

the commercial<br />

and capitalising<br />

leisure<br />

on<br />

offer<br />

the undeveloped<br />

and generate<br />

riverside<br />

a new driver<br />

location<br />

Enhancing the commercial leisure offer and generate a new driver<br />

for<br />

•<br />

the<br />

Enhancement<br />

evening economy<br />

of the retail function and overall attractiveness of the<br />

for the evening economy<br />

• Encouraging<br />

City Centre<br />

and strengthening links between the commercial core<br />

Encouraging and strengthening links between the commercial core<br />

of<br />

•<br />

the<br />

Enhancing<br />

City Centre<br />

the<br />

and<br />

commercial<br />

the River<br />

leisure<br />

Lagan.<br />

offer and generate a new driver<br />

of for the City evening Centre economy and the River Lagan.<br />

• Encouraging and strengthening links between the commercial core<br />

of the City Centre and the River Lagan.<br />

Map 19: Quarter Comprehensive <strong>Development</strong> Scheme<br />

Map<br />

19: Laganbank<br />

19: Laganbank<br />

Quarter<br />

Quarter<br />

Comprehensive<br />

Comprehensive<br />

<strong>Development</strong><br />

<strong>Development</strong><br />

Scheme<br />

Scheme<br />

(Character Areas)<br />

(Character Areas)<br />

Map 19: Laganbank Quarter Comprehensive <strong>Development</strong> Scheme<br />

(Character Areas)<br />

31 This document is currently subject to review<br />

31 This document is currently subject to review<br />

31 This document is currently subject to review<br />

Key Issues and Options 101

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!