- Page 1:
Local Development Plan PREFERRED OP
- Page 4 and 5:
4
- Page 6 and 7:
Foreword Foreword Since 1 st April
- Page 8 and 9:
The Local Development Plan (LDP) wi
- Page 10 and 11:
2 | Have Your Say 2 | Have Your Say
- Page 12 and 13:
• Improving health and wellbeing
- Page 14 and 15:
Housing The new Lisburn & Castlerea
- Page 16 and 17:
Map 2: Spatial Context Lisburn & Ca
- Page 18 and 19:
continuous supply of land for a ran
- Page 20 and 21:
6 | Vision and Strategic Objectives
- Page 22 and 23:
Strategic Objective A: Enabling Sus
- Page 24 and 25:
Strategic Objective E: Supporting S
- Page 26 and 27:
7 | Key Issues and Options A | ENAB
- Page 28 and 29:
7 | Key Issues and Options A | ENAB
- Page 30 and 31:
The settlement hierarchy for the Co
- Page 32 and 33:
It is recommended that the settleme
- Page 34 and 35:
Settlement Development Limits are d
- Page 36 and 37:
Option 1B Retain the existing settl
- Page 38 and 39:
Housing Land Allocation The SPPS id
- Page 40 and 41:
Approximately 80 hectares of land a
- Page 42 and 43:
Table 2: Housing Evaluation Framewo
- Page 44 and 45:
Table 3: Housing units built in Lis
- Page 46 and 47:
number of sites to identify for dev
- Page 48 and 49:
Key Issue 2: Facilitating Future Ho
- Page 50 and 51:
Options for Key Issue 2: Facilitati
- Page 52 and 53:
Option 2C Protect Existing Housing
- Page 54 and 55:
• Improve accessibility for rural
- Page 56 and 57:
Key Issue 3: Facilitating Sustainab
- Page 58 and 59:
Map 6: Rural Housing Pressure Analy
- Page 60 and 61:
Education, Health, Community and Cu
- Page 62 and 63:
Key Issue 4: Facilitating Education
- Page 64 and 65:
7 | Key Issues and Options B | DRIV
- Page 66 and 67:
B | DRIVING SUSTAINABLE ECONOMIC GR
- Page 68 and 69:
• Promote mixed-use development a
- Page 70 and 71:
The Rural Economy BMAP facilitates
- Page 72 and 73:
Deprivation Within the Council Area
- Page 74 and 75:
Council Employment Priorities Lisbu
- Page 76 and 77:
Key Issue 5: Safeguarding Existing
- Page 78 and 79:
Key Issue 6: West Lisburn/Blaris Ma
- Page 80 and 81:
Key Issue 7: Purdysburn Mixed Use S
- Page 82 and 83:
Key Issue 8: The Maze Lands Strateg
- Page 84 and 85:
The Rural Economy POLICY CONTEXT AN
- Page 86 and 87:
Options for Key Issue 9: Facilitati
- Page 88 and 89: Key Issue 10: Mineral Safeguarding
- Page 90 and 91: Options for Key Issue 10: Mineral S
- Page 92 and 93: 7 | Key Issues and Options C | GROW
- Page 94 and 95: C | GROWING OUR CITY, TOWN CENTRES,
- Page 96 and 97: The SPPS advises that the LDP inclu
- Page 98 and 99: Ordnance Survey of Northern Ireland
- Page 100 and 101: Lisburn City Centre Masterplan 2015
- Page 102 and 103: The Castlereagh Urban Integrated De
- Page 104 and 105: Key Issue 11: Growing Lisburn City
- Page 106 and 107: Key Issue 12: Strengthening Town Ce
- Page 108 and 109: Key Issue 13: Sprucefield Regional
- Page 110 and 111: Key Issue 14: Strengthening Distric
- Page 112 and 113: Key Issue 15: Growing the Night Tim
- Page 114 and 115: Offices POLICY CONTEXT AND EVIDENCE
- Page 116 and 117: Comprehensive Development Scheme La
- Page 118 and 119: Option for Key Issue 16: Promoting
- Page 120 and 121: Option for Key Issue 17: City Centr
- Page 122 and 123: 7 | Key Issues and Options D | PROM
- Page 124 and 125: D | PROMOTING PROMOTING SUSTAINABLE
- Page 126 and 127: government tourism initiatives. The
- Page 128 and 129: Lisburn City Centre Masterplan The
- Page 130 and 131: Key Issue 18: Promoting Hillsboroug
- Page 132 and 133: Key Issue: 19 Promoting the Lagan N
- Page 134 and 135: Key Issue 20: Protecting and Promot
- Page 136 and 137: Open Space and Recreation POLICY CO
- Page 140 and 141: Categories of Open Space, Sport & O
- Page 142 and 143: Options for Key Issue 21: Protectin
- Page 144 and 145: 7 | Key Issues and Options E | SUPP
- Page 146 and 147: E | SUPPORTING SUSTAINABLE TRANSPOR
- Page 148 and 149: • Protect routes required for new
- Page 150 and 151: Belfast Metropolitan Transport Plan
- Page 152 and 153: Map 26: Transport Strategy Lisburn
- Page 154 and 155: Accessibility Analysis The Departme
- Page 156 and 157: Option for Key Issue 22: Retention
- Page 158 and 159: Options for Key Issue 23: Retention
- Page 160 and 161: Option for Key Issue 24: Promoting
- Page 162 and 163: Map 30: Strategic Plan for Greenway
- Page 164 and 165: Other Infrastructure Renewable Ener
- Page 166 and 167: Key Issue 26: Renewable Energy Key
- Page 168 and 169: Telecommunications POLICY CONTEXT A
- Page 170 and 171: Key Issue 27: Telecommunications No
- Page 172 and 173: Waste Management POLICY CONTEXT AND
- Page 174 and 175: Key Issue 28: Waste Management Regi
- Page 176 and 177: Water and Waste Water Infrastructur
- Page 178 and 179: 7 | Key Issues and Options F | PROT
- Page 180 and 181: F | PROTECTING & ENHANCING THE BUIL
- Page 182 and 183: Existing Development Plan The exist
- Page 184 and 185: Lisburn & Castlereagh Draft Communi
- Page 186 and 187: Options for Key Issue 29: Protectin
- Page 188 and 189:
could help reduce the fragmentation
- Page 190 and 191:
Much of the parks amenity landscape
- Page 192 and 193:
Key Issue 30: Protecting and Enhanc
- Page 194 and 195:
HILLSBOROUGH CASTLE GROUNDS
- Page 196 and 197:
Glossary Active Travel An approach
- Page 198 and 199:
and vehicle testing; Provision and
- Page 200 and 201:
Masterplan A plan that outlines an
- Page 202 and 203:
the Historic Monuments and Archaeol
- Page 204 and 205:
perform a number of roles: • An e
- Page 208:
www.lisburncastlereagh.gov.uk