30.03.2017 Views

Local Development Plan

2oBkyQa

2oBkyQa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Key Issue 22: Retention of Key Transportation Infrastructure<br />

Schemes (Road and Rail)<br />

Key Issue 22: Retention of Key Transportation Infrastructure<br />

Both the existing <strong>Development</strong> <strong>Plan</strong> (BMAP) and Belfast Metropolitan<br />

Schemes (Road and Rail)<br />

Transportation <strong>Plan</strong> (BMTP) set out the transport schemes and measures<br />

which Both the were existing expected <strong>Development</strong> to be implemented <strong>Plan</strong> (BMAP) up and to 2015. Belfast BMAP Metropolitan<br />

incorporated<br />

those Transportation elements <strong>Plan</strong> of BMTP (BMTP) which set have out the land transport use and schemes spatial planning and measures<br />

implications.<br />

which were expected to be implemented up to 2015. BMAP incorporated<br />

those elements of BMTP which have land use and spatial planning<br />

A implications.<br />

number of key transport proposals are spread throughout the Council<br />

area as previously identified including the M1 to A1 Link; the A24<br />

A Saintfield number Road of key Relief transport Road; proposals Knockmore are - spread M1 Link; throughout completion the of Council<br />

the<br />

North area as Lisburn previously Feeder identified Road; and including Quarry the Corner M1 to – A1 Comber Link; the Road A24<br />

Link.<br />

Saintfield Road Relief Road; Knockmore - M1 Link; completion of the<br />

Whilst North Lisburn the Knockmore-M1 Feeder Road; Link and is Quarry currently Corner identified – Comber as a Road non-strategic Link.<br />

scheme, given the importance of this link to the Council area in terms of<br />

unlocking Whilst the the Knockmore-M1 development Link potential is currently of West identified Lisburn as and a non-strategic<br />

the Maze Lands<br />

it scheme, is identified given as the being importance a key priority of this for link the to Council. the Council Redesignation area in terms of of<br />

the<br />

West unlocking Lisburn the / development Blaris Major Employment potential of West Location Lisburn as detailed and the in Maze Key Lands<br />

Issue<br />

6 it has is identified the potential as being to facilitate a key priority development for the Council. of the Knockmore Redesignation – M1 of Link. the<br />

West Lisburn / Blaris Major Employment Location as detailed in Key Issue<br />

The 6 has relocation the potential of the to Rail facilitate Halt/ development Station at Knockmore of the Knockmore to West Lisburn – M1 Link.<br />

will<br />

also be safeguarded.<br />

The relocation of the Rail Halt/ Station at Knockmore to West Lisburn will<br />

It is proposed to retain the option of re-instating the Antrim–Lisburn<br />

also be safeguarded.<br />

railway as a part of a potential passenger circle line which could serve<br />

Belfast It is proposed international to retain Airport the option as envisaged of re-instating the RDS. the Antrim–Lisburn<br />

At present the<br />

railway connection as a part of between a potential Lisburn passenger and Antrim circle line is disused. which could The Regional serve<br />

Transport Belfast international Strategy identifies Airport as the envisaged need to retain the this RDS. option. At present The Regional the<br />

railway connection between Lisburn and Antrim is disused. The Regional<br />

Transport Strategy identifies the need to retain this option. The Regional<br />

43 Ministerial Debate on Rail Services between Belfast City Centre and Belfast<br />

International Airport, September 2016<br />

43 Ministerial Debate on Rail Services between Belfast City Centre and Belfast<br />

International Airport, September 2016<br />

Transport Strategy also proposes that disused rail routes are protected<br />

for possible re-use for transport purposes.<br />

The<br />

Transport Minister<br />

Strategy for the<br />

also Department<br />

proposes for<br />

that Infrastructure<br />

disused rail routes has stated<br />

are protected<br />

that the<br />

project<br />

for possible<br />

is currently re-use for not<br />

transport viable. 43 The<br />

purposes.<br />

number of passengers using the<br />

airport The Minister falls well for short the Department of the figure for of Infrastructure 10 million that has would stated realistically that the<br />

be project required is currently for a rail not line viable. to be 43 effective. The number At present, of passengers there are using 4.4 the<br />

million<br />

airport users, and falls the well Minister short of says the it figure would of be 10 another million that 14 years would before realistically<br />

the<br />

number required reaches for a the rail necessary line to be effective. figure. At present, there are 4.4 million<br />

users, Map<br />

and 29: Proposed<br />

the Minister Knockmore<br />

says it would – M1<br />

be Link<br />

another Road<br />

14 at West<br />

years Lisburn<br />

before the<br />

and<br />

number Relocation<br />

Map 29: reaches Proposed of Rail<br />

the Halt<br />

Knockmore necessary from Knockmore<br />

figure. – M1 Link Road<br />

to West Lisburn<br />

at West Lisburn and Relocation of Rail Halt from<br />

Map Knockmore 29: Proposed to West Knockmore Lisburn – M1 Link Road at West Lisburn and<br />

Relocation of Rail Halt from Knockmore to West Lisburn<br />

Key Issues and Options 155

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!