30.03.2017 Views

Local Development Plan

2oBkyQa

2oBkyQa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Urban Capacity<br />

An urban capacity study was carried out in the settlements of Lisburn<br />

4. Urban Capacity<br />

City, Greater Urban Areas of Lisburn & Castlereagh and Carryduff in line<br />

with An urban the Strategic capacity <strong>Plan</strong>ning study was Policy carried Statement out in the (SPPS) settlements and <strong>Plan</strong>ning of Lisburn Policy<br />

Statement City, Greater 12 Urban (PPS 12) Areas 19 . The of Lisburn urban capacity & Castlereagh study: and Carryduff in line<br />

with the Strategic <strong>Plan</strong>ning Policy Statement (SPPS) and <strong>Plan</strong>ning Policy<br />

• Ensures a sequential<br />

Statement 12 (PPS 12) 19 approach to the identification of sites<br />

. The urban capacity study:<br />

through the development plan process and managing the release<br />

• Ensures of housing a sequential land approach to the identification of sites<br />

• Assesses through the development potential for future plan process housing and growth managing within the the release urban<br />

footprint of housing land<br />

• Assesses the capacity potential for different future housing types and growth densities within of the housing urban<br />

• Takes footprint account of housing development opportunities arising from<br />

• Assesses previously the developed capacity for land, different infill sites, types the and conversion densities of of existing housing<br />

• Takes buildings account and possible of housing changes development of land use. opportunities arising from<br />

previously developed land, infill sites, the conversion of existing<br />

Lisburn City: Currently 3.47 hectares of land could be developed for<br />

buildings and possible changes of land use.<br />

possible housing development in Lisburn City on urban capacity sites. At<br />

Lisburn an estimated City: Currently density of 3.47 25 dwellings hectares per of land hectare could this be could developed amount for to 86<br />

dwelling possible housing units. development in Lisburn City on urban capacity sites. At<br />

an estimated density of 25 dwellings per hectare this could amount to 86<br />

Lisburn Greater Urban Area: There is only 0.83 hectares identified as<br />

dwelling units.<br />

urban capacity sites amounting to an estimated 20 dwelling units.<br />

Lisburn Greater Urban Area: There is only 0.83 hectares identified as<br />

In Castlereagh Greater Urban Area (Forestside, Cairnshill, Newtownbreda<br />

urban capacity sites amounting to an estimated 20 dwelling units.<br />

and Dundonald areas), 5.38 hectares of land could be used for possible<br />

In housing, Castlereagh amounting Greater to 134 Urban dwelling Area (Forestside, units. Additionally Cairnshill, in the Newtownbreda<br />

Dundonald<br />

area and Dundonald 4.31 hectares areas), of land 5.38 could hectares possibly of land be developed could be used for housing for possible<br />

amounting housing, amounting to 109 housing to 134 units. dwelling units. Additionally in the Dundonald<br />

area 4.31 hectares of land could possibly be developed for housing<br />

amounting 19 PPS 12 states<br />

to 109<br />

urban<br />

housing<br />

capacity<br />

units.<br />

studies should be carried out within existing<br />

urban areas of cities and towns of over 5,000 population<br />

19 PPS 12 states urban capacity studies should be carried out within existing<br />

urban areas of cities and towns of over 5,000 population<br />

In Carryduff 4.23 hectares of land could possibly be developed for<br />

housing amounting to 105 housing units.<br />

In Carryduff 4.23 hectares of land could possibly be developed for<br />

In total, 8.14 hectares in these settlements are within the urban footprint<br />

housing amounting to 105 housing units.<br />

and 10.1 hectares are outside the urban footprint on previously<br />

undeveloped In total, 8.14 hectares sites but in within these the settlements development are within limits. (NB: the urban this figure footprint<br />

and excludes 10.1 zoned hectares housing are outside land and the land urban with footprint planning on permissions previously for<br />

undeveloped housing and is sites either but whiteland, within the infill development or redevelopment limits. (NB: sites this that figure could<br />

excludes possibly be zoned developed housing for land housing and land in the with future planning subject permissions to planning for<br />

housing application). and is either whiteland, infill or redevelopment sites that could<br />

possibly be developed for housing in the future subject to planning<br />

Currently there remains 378 hectares of zoned housing land and<br />

application).<br />

committed housing land (land likely to be developed with planning<br />

Currently decisions) there in the remains settlements 378 hectares of Lisburn, of Lisburn zoned housing Greater land Urban and Area,<br />

committed Castlereagh housing Greater land Urban (land Area likely and to Carryduff be developed with a with population planning over<br />

decisions) 5,000. in the settlements of Lisburn, Lisburn Greater Urban Area,<br />

Castlereagh Greater Urban Area and Carryduff with a population over<br />

The majority of land zoned for housing in BMAP 2015 is located outside<br />

5,000.<br />

the urban footprint but within the settlement limit.<br />

The majority of land zoned for housing in BMAP 2015 is located outside<br />

the urban footprint but within the settlement limit.<br />

5. Windfall Housing<br />

Over the course of the plan period, windfall housing can also make up an<br />

5. Windfall Housing<br />

important part of the land supply. Windfall development is housing<br />

Over provision the course on undesignated of the plan sites period, and windfall as such, housing cannot be can precisely also make up an<br />

important anticipated. part It can of the arise land as a supply. result, Windfall for example, development of plot sub-division is housing or<br />

provision property conversion undesignated and can sites normally and as make such, a cannot significant be precisely contribution to<br />

anticipated. the housing land It can supply arise as over a result, any <strong>Plan</strong> for period. example, In of line plot with sub-division the objectives or<br />

property of the RDS, conversion it is necessary and can to make normally allowance make a for significant this when contribution deciding the to<br />

the housing land supply over any <strong>Plan</strong> period. In line with the objectives<br />

of the RDS, it is necessary to make allowance for this when deciding the<br />

Key Issues and Options 45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!