mag
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Malaysia Water Research Journal<br />
2.7 Free Flow Simulation Testing Methodology<br />
This test is to determine flow rate of Inverter Pump Setting to support the<br />
assembly factors of ram pump at the site. From this testing, correlation between<br />
Inverter Pump Setting and flow rate was produced as references to be used<br />
for application. The result was recorded only after the flow rate is stable. Based<br />
on standard operating procedure of current meter in-situ measurement and its<br />
tolerant factors, the test period had been selected for 300 second (5 minutes) of<br />
each testing.<br />
3 RESULT AND DISCUSSION<br />
A total of 17 test had successfully had been carried out as shown in Table<br />
2. Some of the constraints during the experiments are: (i) modification of precommissioning<br />
test due to unstable pressure at the receiver tank; and (ii)<br />
rectification of inverter pump due to da<strong>mag</strong>e to the rubber bush coupling. A<br />
total of six (6) test scenarios was carried out during the testing period.<br />
44<br />
Months<br />
Table 2. Successful Test Recorded<br />
No. Of Test<br />
May 9<br />
June 3<br />
July 5<br />
Total 17<br />
The Pre-Commissioning Testing and Pre-Dam Simulation Testing were to make<br />
sure the system operate smoothly, and no data were recorded for the test. Data<br />
were recorded for the rest of the testing scenarios for analysis. Table 3 showed<br />
the testing period for different testing scenarios.<br />
Table 3. Testing Period According To Testing Scenario.<br />
No. Scenarios<br />
Testing<br />
Period Type of Data<br />
(Day)<br />
i.<br />
Pre-Commissioning Testing and Pre-<br />
Visual<br />
7<br />
Dam Simulation Testing<br />
Observation<br />
ii. Dam Simulation Testing 6 Flow Data<br />
iii. Pre-River Simulation Testing 4<br />
Visual<br />
Observation<br />
iv. River Simulation Testing 6 Flow Data<br />
v. 24hrs Simulation Testing 1 Flow Data<br />
vi. Free Flow Simulation Testing 1 Flow Data<br />
Totals 25<br />
Institut Penyelidikan Hidraulik Kebangsaan Malaysia (NAHRIM)<br />
National Hydraulic Institute of Malaysia (NAHRIM)