3.1 Result of Pre-Commissioning Testing<br />

Malaysia Water Research Journal<br />

After the ram pump system had been set up, pre-commissioning test was run<br />

to determine ram pump steady operation. No flow data were recorded for this<br />

testing, but observations were recorded.<br />

3.2 Pre-Dam Simulation Testing<br />

Pre-commissioning testing has been successfully conducted as pre-requisite<br />

for further test. After the pre-commissioning testing, pre-dam simulation testing<br />

was run as to determine ram pump operation stability. Some of observation and<br />

flow were recorded as Table 4.<br />

Table 4. Pre-Dam Simulation Testing At Different Setting of Inverter Pump.<br />

Inverter Pump Setting<br />

(Hertz)<br />

Impact of Water Level<br />

At Dam Tank<br />

Ram Pump Operation<br />

Status<br />

30.0 Decreased Not Operating<br />

30.5 Decreased Not Operating<br />

31.0 Decreased Not Operating<br />

31.5 Decreased Not Operating<br />

32.0 Decreased Not Operating<br />

32.5 Decreased Not Operating<br />

33.0 Decreased Not Operating<br />

33.5 Decreased Not Operating<br />

34.0 Decreased Not Operating<br />

34.5 Decreased Not Operating<br />

35.0 Decreased Not Operating<br />

35.5 Decreased Not Operating<br />

36.0 Decreased Not Operating<br />

36.5 Decreased Not Operating<br />

37.0 Decreased Not Operating<br />

37.5 Decreased Not Operating<br />

37.8 Constant In Operation<br />

38.00 Constant In Operation<br />

39.00 Constant In Operation<br />

Institut Penyelidikan Hidraulik Kebangsaan Malaysia (NAHRIM)<br />

45<br />

National Hydraulic Institute of Malaysia (NAHRIM)