1563.R1 – <strong>St</strong>age 2 report Page 21 of 29<br />

The new buildings CCTV system will consist of internal and external CCTV cameras. It is envisaged that the main entrances,<br />

building facades and main corridors will be monitored.<br />

The cameras will be either static or Pan Tilt Zoom (PTZ).<br />

The current incumbent specialist is Select Electrics Limited, Ray Murphy, 07966 112233, 0117 963 1888, 10 Deery Road,<br />

Ashton, Bristol BS3 3JX<br />

Security systems<br />

10.1.8.1 Access Control<br />

The building will be equipped with an electronic access control system. A preliminary strategy has been indicated on the<br />

protective services drawings and will need to be further developed with the Client and the design team.<br />

This system will provide control for areas of the building and include the following elements.<br />

• Proximity Card Reader or fobs<br />

• Push Button request to exit<br />

• Emergency Exit within Protective Plastic Enclosure<br />

The access control systems will be backed up by a local integral UPS/battery system.<br />

10.1.8.2 Intruder Detection<br />

The system will consist of a separate stand-alone panel, with the facility to be remotely monitored. It will be installed to<br />

conform to BS4737 and NACOSS GOLD and should incorporate sequential alarm confirmation technology and comply with<br />

the requirements BS 8243:2010. Each area should be zoned to provide more flexibility to the system.<br />

The system will consist of a number of presence detectors and door contacts. Where required key-pads will be located to<br />

activate or deactivate the system. A preliminary strategy has been indicated on the protective services drawings and will<br />

need to be further developed with the Client and the design team.<br />

The Intruder detection system will be also monitored by remote monitoring system via a dedicated telephone link.<br />

The current incumbent specialist is ADT Fire and Security, 0344 8001999<br />

10.1.8.3 CCTV<br />

The existing building features an Analogue CCTV system with recording and head end equipment in the Head Verger’s<br />

office.<br />

The existing system will be relocated to the new Verger’s office in Phase 2 development and extended together with the<br />

recording equipment to provide coverage for the new areas.<br />

Personal Security Alarm system<br />

The current incumbent specialist is <strong>St</strong>andfast security systems, 0117 9423366.<br />

Electrical Wiring<br />

The incumbent electrician in the church is Roland Bell, Phil Moss, 07831633742<br />

The electrical final circuits will be installed to be fully re-wireable in all areas of the building.<br />

A network of galvanised, stainless steel and GRP cable trays, basket, ladder and trunking / conduit will be designed and<br />

installed throughout the building to separately support cables for:<br />

1. LV power<br />

2. General lighting and small power<br />

3. Fire Alarm<br />

4. Communications such as data, security, AV and mechanical controls.<br />

The cable containment will generally be routed horizontally within ceiling voids and vertically within designated service<br />

risers.<br />

In general, each element of containment will be sized to accommodate 25% spare capacity.<br />

Service penetrations will be co-ordinated to avoid primary structural elements. Openings through the walls will be<br />

provided for all M&E services. All openings will be properly designed and indicated clearly on the drawings.<br />

Fire stopping will be provided where services pass through fire-rated walls or partitions and as determined by the fire<br />

strategy adopted. The fire stopping provided will be equal to the rating of the partition in which it occurs. In addition, to<br />

enhance property protection and to minimise noise transference, fire stopping will be provided all around services where<br />

they pass through floor plates.<br />

The cable containment system will be continuous throughout and cabling will be mechanically protected to the final<br />

equipment termination point.