St Mary Redcliffe Project 450 RIBA 2 Stage End Report
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
LEGEND<br />
40-60 W/m 2 HEAT GAINS - NATURAL VENTILATION<br />
- GAS HEATING - NO COOLING<br />
40-50 W/m 2 HEAT GAINS -FULL MECHANICAL<br />
VENTILATION WITH VRF HEATING AND COOLING<br />
70-80W/m 2 HEAT GAINS - MECHANICAL<br />
VENTILATION WITH VRF HEATING AND COOLING<br />
110-120W/m 2 CHEAT GAINS - FULL MECHANICAL<br />
VENTILATION WITH VRF HEATING AND COOLING<br />
NOTE:<br />
COOLING LOADS ABOVE EXCLUDE SOLAR GAIN AND ARE TO<br />
INDICATE THE FEASIBILITY OF A NATURAL VENTILATION<br />
SOLUTION.<br />
EXISTING ELECTRICAL AND MAINS COLD WATER CAPACITY TO<br />
BE ASSESSED AND PLANT ROOM REQUIREMENTS ADVISED<br />
ACCORDINGLY.<br />
250KVA<br />
SUBSTATION<br />
REQUIRED WITH<br />
24HRS VEHICULAR<br />
ACCESS<br />
AS PER EXISTING<br />
AND DUE TO SIZE<br />
OF KITCHEN<br />
SHOWN, COOKING<br />
IS EXPECTED TO<br />
BE MINIMAL -<br />
EXTRACT<br />
VENTILATION<br />
PLANT THEREFORE<br />
PROPOSED TO<br />
EXHAUST AT LOW<br />
LEVEL WITH PLANT<br />
LOCATED AT HIGH<br />
LEVEL WITHIN<br />
BASEMENT<br />
KITCHEN.<br />
UNDERGROUND<br />
LOW VOLTAGE<br />
CONNECTION<br />
ALTERNATIVE<br />
LOCATION FOR<br />
UTILITY METER,<br />
CUTOUT AND<br />
EARTH BAR<br />
M<br />
MET<br />
ACCCESS<br />
ACCCESS<br />
OPTION A<br />
SIDE BY SIDE AHU<br />
3m x 10m x 1.8mH -<br />
INCLUDES<br />
ALLOWANCE FOR<br />
DUCTWORK AND<br />
ATTENUATION -<br />
1.5m ACCESS<br />
WIDTH REQUIRED<br />
ON EACH SIDE -<br />
SLIGHT OVERLAP<br />
WITH GREEN ROOF<br />
OPTIONS FOR AIR DISTRIBUTION<br />
TO EVENTS SPACE<br />
LOW LEVEL VERTICAL LOUVRES<br />
BEHIND JOINERY:<br />
HIGH LEVEL HIGH PRESSURE<br />
SLOT IN BULKHEAD:<br />
ACCCESS<br />
LOW PROFILE<br />
SUPPLY AND<br />
EXTRACT<br />
DUCTWORK<br />
DISTRIBUTED<br />
ABOVE ROOF.<br />
OPTION B<br />
DOUBLE DECKER<br />
AHU 1.5m x 10m x<br />
3.2mH - INCLUDES<br />
ALLOWANCE FOR<br />
DUCTWORK AND<br />
ATTENUATION<br />
M<br />
MET<br />
UTILITY METER,<br />
CUT-OUT, EARTH<br />
BAR AND<br />
DISTRIBUTION<br />
BOARD. 2.5M IN<br />
LENGHT IN TOTAL<br />
CLEAR FRONT<br />
ACCESS<br />
REQUIRED.<br />
PROJECT:<br />
ST MARY REDCLIFFE<br />
SKETCH TITLE:<br />
SOUTH COURTYARD M&E<br />
COMMENTS_rev 4<br />
DATE: 29/08/2019<br />
ENGR: JD<br />
A Slatted Timber Interior Utilised to Integrate Lighting, Provide<br />
Concealed Ventilation and Passive Acoustic Attenuation