LEGEND<br />

40-60 W/m 2 HEAT GAINS - NATURAL VENTILATION<br />

- GAS HEATING - NO COOLING<br />

40-50 W/m 2 HEAT GAINS -FULL MECHANICAL<br />

VENTILATION WITH VRF HEATING AND COOLING<br />

70-80W/m 2 HEAT GAINS - MECHANICAL<br />

VENTILATION WITH VRF HEATING AND COOLING<br />

110-120W/m 2 CHEAT GAINS - FULL MECHANICAL<br />

VENTILATION WITH VRF HEATING AND COOLING<br />

NOTE:<br />

COOLING LOADS ABOVE EXCLUDE SOLAR GAIN AND ARE TO<br />

INDICATE THE FEASIBILITY OF A NATURAL VENTILATION<br />

SOLUTION.<br />

EXISTING ELECTRICAL AND MAINS COLD WATER CAPACITY TO<br />

BE ASSESSED AND PLANT ROOM REQUIREMENTS ADVISED<br />

ACCORDINGLY.<br />

250KVA<br />

SUBSTATION<br />

REQUIRED WITH<br />

24HRS VEHICULAR<br />

ACCESS<br />

AS PER EXISTING<br />

AND DUE TO SIZE<br />

OF KITCHEN<br />

SHOWN, COOKING<br />

IS EXPECTED TO<br />

BE MINIMAL -<br />

EXTRACT<br />

VENTILATION<br />

PLANT THEREFORE<br />

PROPOSED TO<br />

EXHAUST AT LOW<br />

LEVEL WITH PLANT<br />

LOCATED AT HIGH<br />

LEVEL WITHIN<br />

BASEMENT<br />

KITCHEN.<br />

UNDERGROUND<br />

LOW VOLTAGE<br />

CONNECTION<br />

ALTERNATIVE<br />

LOCATION FOR<br />

UTILITY METER,<br />

CUTOUT AND<br />

EARTH BAR<br />

M<br />

MET<br />

ACCCESS<br />

ACCCESS<br />

OPTION A<br />

SIDE BY SIDE AHU<br />

3m x 10m x 1.8mH -<br />

INCLUDES<br />

ALLOWANCE FOR<br />

DUCTWORK AND<br />

ATTENUATION -<br />

1.5m ACCESS<br />

WIDTH REQUIRED<br />

ON EACH SIDE -<br />

SLIGHT OVERLAP<br />

WITH GREEN ROOF<br />

OPTIONS FOR AIR DISTRIBUTION<br />

TO EVENTS SPACE<br />

LOW LEVEL VERTICAL LOUVRES<br />

BEHIND JOINERY:<br />

HIGH LEVEL HIGH PRESSURE<br />

SLOT IN BULKHEAD:<br />

ACCCESS<br />

LOW PROFILE<br />

SUPPLY AND<br />

EXTRACT<br />

DUCTWORK<br />

DISTRIBUTED<br />

ABOVE ROOF.<br />

OPTION B<br />

DOUBLE DECKER<br />

AHU 1.5m x 10m x<br />

3.2mH - INCLUDES<br />

ALLOWANCE FOR<br />

DUCTWORK AND<br />

ATTENUATION<br />

M<br />

MET<br />

UTILITY METER,<br />

CUT-OUT, EARTH<br />

BAR AND<br />

DISTRIBUTION<br />

BOARD. 2.5M IN<br />

LENGHT IN TOTAL<br />

CLEAR FRONT<br />

ACCESS<br />

REQUIRED.<br />

PROJECT:<br />

ST MARY REDCLIFFE<br />

SKETCH TITLE:<br />

SOUTH COURTYARD M&E<br />

COMMENTS_rev 4<br />

DATE: 29/08/2019<br />

ENGR: JD<br />

A Slatted Timber Interior Utilised to Integrate Lighting, Provide<br />

Concealed Ventilation and Passive Acoustic Attenuation