St Mary Redcliffe Project 450 RIBA 2 Stage End Report

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LEGEND<br />

40-60 W/m 2 HEAT GAINS - NATURAL VENTILATION<br />

- GAS HEATING - NO COOLING<br />

40-50 W/m 2 HEAT GAINS -FULL MECHANICAL<br />

VENTILATION WITH VRF HEATING AND COOLING<br />

70-80W/m 2 HEAT GAINS - MECHANICAL<br />

VENTILATION WITH VRF HEATING AND COOLING<br />

110-120W/m 2 CHEAT GAINS - FULL MECHANICAL<br />

VENTILATION WITH VRF HEATING AND COOLING<br />

NOTE:<br />

COOLING LOADS ABOVE EXCLUDE SOLAR GAIN AND ARE TO<br />

INDICATE THE FEASIBILITY OF A NATURAL VENTILATION<br />

SOLUTION.<br />

EXISTING ELECTRICAL AND MAINS COLD WATER CAPACITY TO<br />

BE ASSESSED AND PLANT ROOM REQUIREMENTS ADVISED<br />

ACCORDINGLY.<br />

LOW LEVEL<br />

KITCHEN EXHAUST<br />

PROPOSED - AS<br />

CURRENTLY<br />

INSTALLED<br />

ELECTRICAL DISTRIBUTION BOARD<br />

MEP STRATEGY DRAWINGS<br />

The following drawings highlight the intended MEP strategic approach. In accordance with the<br />

outcomes of <strong>RIBA</strong> 2, they provide a robust basis for further development at <strong>RIBA</strong> 3<br />

This is particularly critical, as a key element of the design approach is the requirement for:<br />

ROUTE REQUIRED<br />

FOR KITCHEN<br />

EXHAUST<br />

DUCTWORK<br />

EXISTING BOILER<br />

PLANT TO REMAIN.<br />

NEW AREAS<br />

HEATED BY AIR<br />

SOURCE HEAT<br />

PUMP.<br />

• Natural and passive environmental strategies wherever possible<br />

• A ‘fabric-first’ approach to sustainability<br />

• The maximum concealment of services to maintain the purity of the spaces themselves<br />

PROJECT:<br />

ST MARY REDCLIFFE<br />

SKETCH TITLE:<br />

BASEMENT M&E COMMENTS_rev 4<br />

DATE: 29/08/2019<br />

ENGR: JD