LEGEND<br />
40-60 W/m 2 HEAT GAINS - NATURAL VENTILATION<br />
- GAS HEATING - NO COOLING<br />
40-50 W/m 2 HEAT GAINS -FULL MECHANICAL<br />
VENTILATION WITH VRF HEATING AND COOLING<br />
70-80W/m 2 HEAT GAINS - MECHANICAL<br />
VENTILATION WITH VRF HEATING AND COOLING<br />
110-120W/m 2 CHEAT GAINS - FULL MECHANICAL<br />
VENTILATION WITH VRF HEATING AND COOLING<br />
NOTE:<br />
COOLING LOADS ABOVE EXCLUDE SOLAR GAIN AND ARE TO<br />
INDICATE THE FEASIBILITY OF A NATURAL VENTILATION<br />
SOLUTION.<br />
EXISTING ELECTRICAL AND MAINS COLD WATER CAPACITY TO<br />
BE ASSESSED AND PLANT ROOM REQUIREMENTS ADVISED<br />
ACCORDINGLY.<br />
LOW LEVEL<br />
KITCHEN EXHAUST<br />
PROPOSED - AS<br />
CURRENTLY<br />
INSTALLED<br />
ELECTRICAL DISTRIBUTION BOARD<br />
MEP STRATEGY DRAWINGS<br />
The following drawings highlight the intended MEP strategic approach. In accordance with the<br />
outcomes of <strong>RIBA</strong> 2, they provide a robust basis for further development at <strong>RIBA</strong> 3<br />
This is particularly critical, as a key element of the design approach is the requirement for:<br />
ROUTE REQUIRED<br />
FOR KITCHEN<br />
EXHAUST<br />
DUCTWORK<br />
EXISTING BOILER<br />
PLANT TO REMAIN.<br />
NEW AREAS<br />
HEATED BY AIR<br />
SOURCE HEAT<br />
PUMP.<br />
• Natural and passive environmental strategies wherever possible<br />
• A ‘fabric-first’ approach to sustainability<br />
• The maximum concealment of services to maintain the purity of the spaces themselves<br />
PROJECT:<br />
ST MARY REDCLIFFE<br />
SKETCH TITLE:<br />
BASEMENT M&E COMMENTS_rev 4<br />
DATE: 29/08/2019<br />
ENGR: JD