- Page 1: ST MARY REDCLIFFE PROJECT 450 RIBA
- Page 5 and 6: 2.0 INTRODUCTION Funded jointly by
- Page 7 and 8: Project 450 Board Review Instructio
- Page 9 and 10: 4.1 STRUCTURES Undertaken by Integr
- Page 11 and 12: s dopted e, whilst A full CCTV surv
- Page 13 and 14: 3.2 Existing Trees There are a larg
- Page 15 and 16: Stability can be provided by reinfo
- Page 17 and 18: 1563.R1 - Stage 2 report Page 5 of
- Page 19 and 20: LEGEND 40-60 W/m 2 HEAT GAINS - NAT
- Page 21 and 22: LEGEND 40-60 W/m 2 HEAT GAINS - NAT
- Page 24 and 25: 4.3 LANDSCAPE Introduction The purp
- Page 26 and 27: Historical Context The southern chu
- Page 28 and 29: Landscape Concept The diagram adjac
- Page 30 and 31: Response to Site The ANGULAR framew
- Page 32 and 33: Sketch Plan: North Churchyard 3 The
- Page 34 and 35: Sketch Ideas Red cliff - continuati
- Page 36 and 37: NORTH CHURCHYARD Simple high-qualit
- Page 38 and 39: SOUTH CHURCHYARD Mown paths/ margin
- Page 40 and 41: 4.4 SCHEME UPDATES ARCHITECTURAL PR
- Page 42 and 43: FFL 12.00 FFL 10.36 FFL 10.36 FFL 1
- Page 44 and 45: FFL 12.00 FFL 10.36 FFL 10.36 FFL 1
- Page 46 and 47: 4.5 CURRENT PROPOSALS 11 13 3 9 10
- Page 48 and 49: 27 29 28 A Concept Image for the Ne
- Page 50 and 51: 31 32 The Chancel South Aisle & Pri
- Page 52 and 53:
4.6 MATERIALITY The design team hav
- Page 54 and 55:
PROPOSED OPENING TO NORTH AISLE
- Page 56 and 57:
Former Opening to South Porch Stair
- Page 58 and 59:
4.8 AREAS OF FURTHER INVESTIGATION
- Page 60 and 61:
5.0 CONSULTATION In order to ensure
- Page 62 and 63:
6.0 COST PLAN Throughout RIBA Stage
- Page 64 and 65:
7.0 RISK REGISTER To ensure the eff
- Page 66 and 67:
SMR - PROJECT 450 - RISK REGISTER R
- Page 68 and 69:
8.0 PROGRAMME The below-listed prog
- Page 70 and 71:
10.0 APPENDICES Endnotes 1 Sampson,
- Page 72 and 73:
St Mary Redcliffe Appendix B BS 583
- Page 74 and 75:
10.2 ECOLOGICAL ASSESSMENT Contents
- Page 76 and 77:
2 Method 2.8 A list of other specie
- Page 78 and 79:
3 Results with some parts ancient w
- Page 80 and 81:
Eurasian Badger Meles meles Mammals
- Page 82 and 83:
oost is defined as any structure or
- Page 84 and 85:
Appendix 2 Policy & Legal Considera
- Page 86 and 87:
A A A A A A A A A A A A A A A A A A
- Page 88 and 89:
10.3 MEP STRATEGY 4 Site Infrastruc
- Page 90 and 91:
5 Proposed infrastructure This opti
- Page 92 and 93:
1563.R1 - Stage 2 report Page 12 of
- Page 94 and 95:
9 Mechanical Services Strategy 9.1
- Page 96 and 97:
In some public areas low surface te
- Page 98 and 99:
Drainage is provided to the existin
- Page 100 and 101:
1563.R1 - Stage 2 report Page 20 of
- Page 102 and 103:
Flexible conduits will be used for
- Page 104 and 105:
1563.R1 - Stage 2 report Page 24 of
- Page 106: