St Mary Redcliffe Project 450 RIBA 2 Stage End Report
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Project</strong> <strong>450</strong> - <strong>St</strong> <strong>Mary</strong> <strong>Redcliffe</strong> Church, Bristol<br />
<strong>RIBA</strong> <strong>St</strong>age 2 <strong>Report</strong><br />
Overall Outline Cost Plan Summary No 1 20/01/2020<br />
Ref<br />
A<br />
Scope of Works Description<br />
Church Yard North<br />
Approx.<br />
GIFA (m2)<br />
Current Costs Previous Costs Movement Comments<br />
£ £ £<br />
SUMMARY<br />
<strong>RIBA</strong> 2 Total Construction Cost<br />
<strong>RIBA</strong> 1 Total Construction Cost<br />
£8,345,961 (ex VAT)<br />
1 New facilities comprising new café & kitchen, gallery & exhibition space 1,098 £3,579,054 £2,939,000 £640,054<br />
B<br />
Church Yard South<br />
1 Education/Learning Building including new access lift/steps 212 £861,844 £562,200 £299,644<br />
2 Events Building including hard & soft landscaping 381 £1,183,259 £1,010,300 £172,959<br />
C<br />
Consequential Improvements to satisfy Building Regulations<br />
1 Allowance Excl Excl £0 To be confirmed<br />
D<br />
Other Works<br />
1 Proposals for storage and office at Nave Level & Volunteer room £0 £140,500 -£140,500 Works now included in A1 above<br />
2 Proposed Internal Porch to West Door £30,000 £0 £30,000 Additional Works added<br />
3 Allowance to provide new internal exhibition space £50,000 £0 £50,000 Allowance pending scope agreement<br />
4 New Armoire £50,000 £0 £50,000 Part included in D1 previously<br />
£5,754,157 £4,652,000 £1,102,157<br />
D Main Contractor's Preliminaries 16% £923,000 £930,400 -£7,400 Assumes South Church Yard projects share site management facilities<br />
£6,677,157 £5,582,400 £1,094,757<br />
E Main Contractor's Overheads & Profit 7.5% £491,037 £418,680 £72,357<br />
£7,168,194 £6,001,080 £1,167,114<br />
F Professional, Legal, Planning & Building Regulation Fees 16% £1,177,767 £1,086,946 £90,821 18% included for South Church Yard projects & 16% for Undercroft & Hogarth<br />
G<br />
H<br />
Design Development & Construction Risks<br />
Inflation<br />
SUB TOTAL: Facilitating and Building Works<br />
Sub-total<br />
TOTAL: Building Works Estimate<br />
Base Cost Estimate<br />
£8,345,961 £7,088,026 £1,257,935<br />
0.1 Design Development Risks 12% £991,006 £900,162 £90,844<br />
0.2 Construction Risks 0% £0 £0 £0 Included in Design Development Risk above<br />
0.3 Employer Change Risks 5% £0 £345,062 -£345,062 Allocated to building works above<br />
Total Risk Allowance Estimate<br />
Cost Estimate (excluding inflation)<br />
£991,006 £1,245,224 -£254,218<br />
£9,336,968 £8,333,250 £1,003,718<br />
0.1 Tender Inflation 0% Excl Excl £0<br />
0.2 Construction Inflation 0% Excl Excl £0<br />
Cost Estimate (including inflation)<br />
£9,336,968 £8,333,250 £1,003,718<br />
I VAT 20% £1,867,394 £1,666,650 £200,744<br />
TOTALS (incl VAT & Fees) @ Base Date 1Q20<br />
£11,204,000 £10,000,000 £1,204,000<br />
Base Scheme<br />
£7,088,026 (ex VAT)<br />
Enhanced Scheme £8,236,500 (ex VAT) *<br />
including increased:<br />
i) Events Space<br />
ii) Education Space<br />
iii) Nave Level ‘Armoire’<br />
Given that the <strong>RIBA</strong> 2 scheme includes the above increased<br />
provision, the most accurate comparator is the <strong>RIBA</strong> 1 Enhanced<br />
Scheme and, on this basis, project costs can be seen to have<br />
remained relatively consistent through the <strong>RIBA</strong> 2 design<br />
development<br />
However, the impact of both VAT and Quantified Risk Allowance is<br />
such that the forecast Total <strong>Project</strong> Cost now exceeds the agreed<br />
£10m budget by £1,024,000<br />
In relation to this, and to more adequately define the scope for<br />
<strong>RIBA</strong> 3, it is recommended that SMR:<br />
1. Seeks an update on the funding position from the Fundraising<br />
Consultant and, particularly, clarity on whether the anticipated<br />
£10m maximum relates to total construction or total project<br />
cost<br />
2. Seeks clarity from its Financial Advisors on the project’s VAT<br />
status<br />
3. Ensures the separate fundability of the excluded items, such as<br />
FF&E<br />
4. Considers the early undertaking of the suggested further<br />
surveys and investigations to manage the Quantified Risk<br />
Allowance<br />
5. Utilises the suggested review of the South Churchyard Buildings<br />
to achieve efficiencies wherever possible<br />
* As reported in <strong>RIBA</strong> 1 <strong>Report</strong>, July 2019<br />
T:\BLCM\123\MJQ\<strong>St</strong> <strong>Mary</strong> <strong>Redcliffe</strong> Church\2019\December 2019\<strong>RIBA</strong> <strong>St</strong>age 2 <strong>Report</strong>\Cost Plan Jan 20\Draft V1.xlsx