In some public areas low surface temperature (LST) radiators have been required where particularly young children could<br />

be at risk from scalding by conventional radiators. Consideration should be given to<br />

the use of some areas so see if venerable adults or young children are regularly using<br />

the space. Shapes, sizes and styles for LST radiators are more limited. Finishes for all<br />

radiators are generally white but can be coloured as necessary.<br />

All radiators would be fitted with thermostatic valves for local control.<br />

Radiators sizing will need to take into account the lower water temperatures expected<br />

to be generated by the air source heat pump and will therefore be “oversized” to<br />

achieve the same output as from a traditional gas fired boiler system.<br />

Existing Heating Plant<br />

The existing boiler plant serving the church is to be retained as there are no reports of issues with this system.<br />

The current architectural layouts currently require the slab above this plant room to be lowered. From site inspection,<br />

this will likely affect the distribution pipework that leaves the plant room at high level. A survey will need to be conducted<br />

to make recommendations regarding the required diversions.<br />

Heating Distribution<br />

LTHW and refrigerant distribution pipework will be distributed largely within ceiling voids and vertically via dedicated<br />

risers. Pipework will all be insulated to mitigate the risk of overheating.<br />

9.2 Cooling<br />

Where possible, cooling is not proposed for the new development. Natural ventilation solutions will instead provide<br />

outdoor air to mitigate the risk of overheating.<br />

These will be thermally modelled at stage 3 to inform the expected conditions in the space and any limitations that this<br />

puts on the use and occupancy of the spaces.<br />

At this stage the expected exception to this is the events space due to its high occupancy and glazing. 2No. options to<br />

provide the cooling to this space are being considered as described below:<br />

Air Source Heat Pumps – VRF – As described in the heating section above the external heat pumps and FCUs are able to<br />

provide both heating and cooling<br />

Packaged Air Handling Plant Providing Cooling – Areas with high air volumes can be heated and cooled by heating the<br />

fresh air supply. This is a potential solution for the events space and the Hogarth Gallery. As these spaces have fairly high<br />

occupancy, this drives a high supply air volume requirement, which has the capacity to provide cooling.<br />

A packaged AHU will use a refrigerant compression and expansion system to take heat from exhaust air and “reject” this<br />

into the supply air stream. A thermal wheel will also be used to recover heat from the extracted air.<br />

This option reduces the required external plant in instances where high air volumes are already required.<br />

9.3 Domestic Water Services<br />

Cold Water<br />

The proposed extension will increase the domestic cold-water demand of the site. It is therefore expected that an upgrade<br />

to the mains cold water will be required to serve the existing and new water outlets.<br />

No cold-water storage has been identified on site, and so it is assumed to be a mains fed system. Therefore, it is reasonable<br />

to assume that sufficient pressure is available and can a mains fed system can be extended to serve the new development.<br />

Confirmation of the cold-water requirements of the kitchen is required.<br />

Hot Water<br />

Due to the distributed nature of the WCs and kitchen facilities, local hot-water provision is<br />

preferred.<br />

Each remotes WC area will be provided with a direct un-vented water heater to provide hot<br />

water to the basin outlets. The heater will be located under sinks or concealed in risers/store<br />

rooms as required.<br />

Due to the limited size of the proposed kitchen, it is not anticipated that this will have a high hot<br />

water demand and will therefore also be suited to local electric hot water production, but in this<br />

case with a small amount of storage.<br />

The hot water requirements of the kitchen are to be confirmed.<br />

9.4 Ventilation<br />

A successful ventilation strategy is essential to ensure there is adequate fresh air in all areas within the building and that<br />

a comfortable temperature is maintained in Summer.<br />

All areas and rooms such as gallery, exhibition spaces, event spaces and kitchens etc should be adequately ventilated so<br />

they are fit for purpose.<br />

The proposed strategy, in keeping with the passive design approach, is to provide natural ventilation for overheating and<br />

fresh air to as much of the new development as possible.<br />

Where necessary, mechanical ventilation shall be provided. The AHUs (Air Handling Unit) providing the mechanical<br />

ventilation need to have high efficiency heat recovery and be designed such that the ductwork pressure drop is minimised<br />

to reduce the associated energy consumption.<br />

Exhibition Spaces, Café & Education Space<br />

1563.R1 – <strong>St</strong>age 2 report Page 16 of 29