St Mary Redcliffe Project 450 RIBA 2 Stage End Report

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1563.R1 – <strong>St</strong>age 2 report Page 5 of 29<br />

2 Key Design Drivers<br />

Environmental Requirements:<br />

Overheating<br />

Building Regulations:<br />

As the building is an extension it will fall under approved document Part L2B. CO2<br />

calculations maybe required for the new build areas if the size of the extension is<br />

greater than 25% of the existing floor area. The extension and the provision of<br />

additional building services will also trigger consequential improvements and<br />

Acoustics<br />

Draughts<br />

Daylighting<br />

Air quality<br />

Occupancy hours<br />

and numbers<br />

Practical and easy to Maintain<br />

Expected energy<br />

demands<br />

therefore 10% of the primary works costs will need to be allocated to improving the<br />

existing building.<br />

Planning Requirements:<br />

The project falls under Bristol City Council and will need to meet there planning<br />

requirements. As part of the stage 3 works an energy statement will be produced<br />

which will show how we aim to meet the 20% renewable energy target as well as a<br />

feasibility into connection into the proposed district heating network.<br />

Passive design<br />

opportunities<br />

Capacity of existing<br />

utilities and site<br />

limitations<br />

Site Layout &<br />

Infrastructure<br />

Environmental<br />

Requirements<br />

Functional<br />

Requirements<br />

Architectural<br />

Design<br />

Massing / layout /<br />

fenestration /<br />

orientation<br />

Thermal performance /<br />

thermal mass / air<br />

permeability<br />

Energy/Client low carbon targets:<br />

Capital cost<br />

The question regarding client specific energy and carbon targets has been raised<br />

during this design phase. It was suggested that a workshop takes place to talk<br />

through the aspirations in more detail. QODA will arrange and this should be a key<br />

priority before we start stage 3 design work.<br />

Running cost<br />

Maintenance<br />

cost<br />

Costs<br />

Building Services<br />

Design<br />

Controls<br />

Centralised vs<br />

local<br />

Certifications e.g. BREEAM<br />

Performance<br />

Targets<br />

Legal<br />

requirements<br />

Building<br />

regulations<br />

Energy / Client low<br />

carbon targets?<br />

Planning targets /<br />

constraints<br />

Heating Hot Water Ventilation Cooling Lighting Power