VGB POWERTECH 10 (2020) - International Journal for Generation and Storage of Electricity and Heat
VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 7 (2020). Technical Journal of the VGB PowerTech Association. Energy is us! Power plant products/by-products.
VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 7 (2020).
Technical Journal of the VGB PowerTech Association. Energy is us!
Power plant products/by-products.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>VGB</strong> PowerTech <strong>10</strong> l <strong>2020</strong><br />
Plants in direct exchange <strong>of</strong> experience with <strong>VGB</strong> I August <strong>2020</strong><br />
Nuclear<br />
power plant<br />
Country<br />
Type<br />
Nominal<br />
capacity<br />
Gross Net<br />
MW MW<br />
Operating<br />
time<br />
generator<br />
in h<br />
Energy generated<br />
(gross generation) MWh<br />
Month Year 1 commis-<br />
Since<br />
sioning<br />
Time Unit capability<br />
availability % factor %*<br />
Energy unavailability<br />
%*<br />
Energy<br />
utilisation %*<br />
1 1 Postponable Not postponable Month Year 1<br />
Planned** Unplanned***<br />
Month Year Month Year<br />
Month Year 1<br />
Month Year 1 Month Year 1<br />
GKN-II Neckarwestheim DE PWR 1400 13<strong>10</strong> 744 1 008 400 7 063 200 347 301 444 <strong>10</strong>0 .00 89 .01 <strong>10</strong>0 .00 89 .00 0 <strong>10</strong> .99 0 0 0 0 .01 96 .98 86 .27 -<br />
KBR Brokdorf DE PWR 1480 14<strong>10</strong> 744 988 411 7 654 253 368 375 275 <strong>10</strong>0 .00 <strong>10</strong>0 .00 94 .30 94 .14 5 .70 5 .64 0 0 0 0 .22 90 .20 88 .06 -<br />
KKE Emsl<strong>and</strong> DE PWR 1406 1335 744 1 025 896 7 3<strong>10</strong> 311 364 9<strong>10</strong> 512 <strong>10</strong>0 .00 90 .75 <strong>10</strong>0 .00 90 .64 0 9 .27 0 0 0 0 .09 98 .01 88 .79 -<br />
KKI-2 Isar DE PWR 1485 14<strong>10</strong> 647 918 631 7 384 853 373 147 322 87 .00 89 .74 85 .93 89 .49 12 .00 <strong>10</strong> .24 0 0 2 .08 0 .26 82 .74 84 .52 1,2<br />
KRB-C Gundremmingen DE BWR 1344 1288 743 950 355 6 243 803 347 567 356 99 .80 81 .51 96 .40 79 .63 0 12 .34 1 .66 7 .78 1 .93 0 .25 94 .23 78 .73 -<br />
KWG Grohnde DE PWR 1430 1360 744 1 0<strong>10</strong> 366 6 482 880 394 757 726 <strong>10</strong>0 .00 92 .03 99 .93 91 .78 0 .04 7 .64 0 0 .13 0 .03 0 .45 94 .33 76 .93 -<br />
OL1 Olkiluoto FI BWR 920 890 744 670 470 4 870 299 274 335 769 <strong>10</strong>0 .00 93 .28 99 .93 90 .64 0 .07 6 .38 0 2 .23 0 0 .75 97 .95 90 .42 -<br />
OL2 Olkiluoto FI BWR 920 890 744 667 454 5 073 464 264 437 550 <strong>10</strong>0 .00 95 .42 99 .94 94 .85 0 5 .08 0 .06 0 .01 0 0 .06 97 .51 94 .19 -<br />
KCB Borssele NL PWR 512 484 744 366 943 2 658 771 170 640 205 <strong>10</strong>0 .00 90 .11 <strong>10</strong>0 .00 89 .26 0 7 .53 0 2 .85 0 0 .36 96 .17 88 .77 -<br />
KKB 1 Beznau CH PWR 380 365 744 271 051 1 892 9<strong>10</strong> 132 201 730 <strong>10</strong>0 .00 85 .64 <strong>10</strong>0 .00 85 .43 0 14 .57 0 0 0 0 95 .69 84 .96 7<br />
KKB 2 Beznau CH PWR 380 365 423 146 462 2 079 391 139 376 174 56 .86 94 .52 55 .39 94 .25 42 .73 5 .43 0 0 1 .88 0 .32 51 .17 93 .40 1,7<br />
KKG Gösgen CH PWR <strong>10</strong>60 <strong>10</strong><strong>10</strong> 744 773 594 5 702 280 327 818 515 <strong>10</strong>0 .00 92 .87 99 .95 92 .34 0 .02 7 .63 0 0 .02 0 .03 0 98 .09 91 .88 7<br />
CNT-I Trillo ES PWR <strong>10</strong>66 <strong>10</strong>03 744 783 529 5 178 896 260 926 922 <strong>10</strong>0 .00 86 .29 <strong>10</strong>0 .00 85 .60 0 14 .04 0 0 0 0 .37 97 .94 82 .33 -<br />
Dukovany B1 CZ PWR 500 473 744 358 695 2 889 649 118 773 833 <strong>10</strong>0 .00 <strong>10</strong>0 .00 <strong>10</strong>0 .00 99 .95 0 0 .05 0 0 0 0 96 .42 98 .71 -<br />
Dukovany B2 CZ PWR 500 473 744 354 630 2 859 144 113 902 462 <strong>10</strong>0 .00 99 .90 <strong>10</strong>0 .00 99 .67 0 0 .05 0 0 0 0 .28 95 .33 97 .67 -<br />
Dukovany B3 CZ PWR 500 473 736 331 301 1 679 060 111 930 796 98 .93 60 .20 92 .69 58 .82 0 15 .71 0 0 7 .31 25 .46 89 .06 57 .35 -<br />
Dukovany B4 CZ PWR 500 473 744 362 313 2 404 064 113 111 021 <strong>10</strong>0 .00 82 .85 <strong>10</strong>0 .00 82 .80 0 14 .60 0 0 0 2 .60 97 .40 82 .12 -<br />
Temelin B1 CZ PWR <strong>10</strong>82 <strong>10</strong>32 744 797 762 4 528 724 126 443 537 <strong>10</strong>0 .00 71 .82 99 .91 70 .93 0 .09 24 .48 0 0 0 4 .59 99 .<strong>10</strong> 71 .49 -<br />
Temelin B2 CZ PWR <strong>10</strong>82 <strong>10</strong>32 537 566 281 4 892 583 122 375 201 72 .18 76 .33 70 .14 76 .02 29 .86 23 .96 0 0 0 0 .02 70 .35 77 .23 1<br />
Doel 1 BE PWR 454 433 744 327 687 898 926 138 634 986 <strong>10</strong>0 .00 34 .45 99 .96 33 .72 0 .04 56 .46 0 0 0 9 .82 94 .20 32 .86 -<br />
Doel 2 BE PWR 454 433 669 281 170 949 340 137 284 8<strong>10</strong> 89 .92 37 .17 88 .80 36 .56 <strong>10</strong> .52 43 .26 0 0 0 .69 20 .18 80 .44 35 .16 -<br />
Doel 3 BE PWR <strong>10</strong>56 <strong>10</strong>06 0 0 5 008 404 268 120 054 0 81 .48 0 81 .44 <strong>10</strong>0 .00 18 .56 0 0 0 0 0 80 .57 2<br />
Doel 4 BE PWR <strong>10</strong>86 <strong>10</strong>38 744 787 249 5 620 482 275 258 757 <strong>10</strong>0 .00 88 .86 99 .61 88 .05 0 11 .68 0 0 0 .39 0 .27 95 .81 87 .04 -<br />
Tihange 1 BE PWR <strong>10</strong>09 962 0 0 0 307 547 424 0 0 0 0 0 78 .67 0 0 <strong>10</strong>0 .00 21 .33 0 0 2<br />
Tihange 2 BE PWR <strong>10</strong>55 <strong>10</strong>08 744 756 061 5 852 472 263 906 990 <strong>10</strong>0 .00 96 .52 99 .98 96 .19 0 .02 0 .03 0 0 .06 0 3 .72 97 .03 95 .60 -<br />
Tihange 3 BE PWR <strong>10</strong>89 <strong>10</strong>38 0 0 4 096 335 284 658 911 0 64 .81 0 64 .74 <strong>10</strong>0 .00 35 .25 0 0 0 0 .01 0 64 .63 2<br />
Remarks<br />
1<br />
PWR: Pressurised water reactor<br />
Beginning <strong>of</strong> the year<br />
2<br />
BWR: Boiling water reactor<br />
Final data were not yet available in print<br />
* Net-based values (Czech <strong>and</strong> Swiss nuclear power plants gross-based)<br />
** Planned: the beginning <strong>and</strong> duration <strong>of</strong> unavailability have to be determined more than 4 weeks be<strong>for</strong>e commencement<br />
*** Unplanned: the beginning <strong>of</strong> unavailability cannot be postponed or only within 4 weeks.<br />
All values were entered in the column not postponable.<br />
– Postponable: the beginning <strong>of</strong> unavailability can be postponed more than 12 hours to 4 weeks.<br />
– Not postponable: the beginning <strong>of</strong> unavailability cannot be postponed or only within 12 hours.<br />
Remarks:<br />
1 Refuelling<br />
2 Inspection<br />
3 Repair<br />
4 Stretch-out-operation<br />
5 Stretch-in-operation<br />
6 Here<strong>of</strong> traction supply:<br />
7 Here<strong>of</strong> steam supply:<br />
KKB 1 Beznau<br />
Month: <br />
400 MWh<br />
Since the beginning <strong>of</strong> the year: <strong>10</strong>,915 MWh<br />
Since commissioning: 560,113 MWh<br />
KKB 2 Beznau<br />
Month:<br />
11 MWh<br />
Since the beginning <strong>of</strong> the year: 2,138 MWh<br />
Since commissioning: 134,754 MWh<br />
KKG Gösgen<br />
Month:<br />
7,219 MWh<br />
Since the beginning <strong>of</strong> the year: 52,984 MWh<br />
Since commissioning: 2,437,185 MWh<br />
8 New nominal capacity since January <strong>2020</strong><br />
92