<strong>University</strong> <strong>of</strong> <strong>Sunderland</strong> <strong>Travel</strong> <strong>Plan</strong> Update<br />
5.2 2010 – 2012/13 Revised <strong>Travel</strong> <strong>Plan</strong> Measures<br />
This section takes into account what has already been achieved through the <strong>University</strong> <strong>Travel</strong><br />
<strong>Plan</strong> over the last two years to introduce a revised action plan, taking the <strong>University</strong> forward to<br />
2012/13. It also considers the 2009 2009/10 staff and student travel survey urvey results and the new <strong>Travel</strong><br />
<strong>Plan</strong> targets..<br />
The main themes are similar to those lis listed in the 2007/08 <strong>Travel</strong> <strong>Plan</strong>, , which are shown in Table<br />
5.1. Each measure is discussed in the following section and and, , where relevant, is summarised in a<br />
short table which illustrates:<br />
• The targeted groups <strong>of</strong> staff, students or visitors;<br />
• The likely impact t on the <strong>Travel</strong> <strong>Plan</strong> targets, high, medium and low;<br />
- ‘High’ means it is essential that the measure is promoted by the <strong>University</strong> for reaching<br />
the <strong>Travel</strong> <strong>Plan</strong> targets targets;<br />
- ‘Medium’ means it is important that the measure is promoted by the <strong>University</strong> for<br />
reaching the <strong>Travel</strong> <strong>Plan</strong> targets targets; and<br />
- ‘Low’ means the measure is easier to put in place and could contribute to attaining the<br />
travel plan targets targets;<br />
• The level <strong>of</strong> difficulty for its implementation<br />
implementation, high, medium and low;<br />
- ‘High’ means that the measure wwould<br />
d be costly or that there is a high risk <strong>of</strong> strong<br />
opposition from management, staff or students;<br />
- ‘Medium’ means that the measure would involve some cost and there may be an element<br />
<strong>of</strong> opposition from management, staff or students; and<br />
- ‘Low’ means that th the e measure would involve little cost and there would be limited<br />
opposition from management, staff or students;<br />
• The person or organisation responsible for implementing the initiative; and<br />
• The timescale within which th the measure should be implemented<br />
At the end <strong>of</strong> the section, all the measures are collated into a Revised evised <strong>Travel</strong> <strong>Plan</strong> Action <strong>Plan</strong><br />
Summary Table.<br />