University of Sunderland - Travel Plan Final 200510-1
University of Sunderland - Travel Plan Final 200510-1
University of Sunderland - Travel Plan Final 200510-1
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>University</strong> <strong>of</strong> <strong>Sunderland</strong> <strong>Travel</strong> <strong>Plan</strong> Update<br />
5087709/<strong>University</strong> <strong>of</strong> <strong>Sunderland</strong> - <strong>Travel</strong> <strong>Plan</strong> <strong>Final</strong> <strong>200510</strong>.docx<br />
125<br />
Table 5.5 – Measure 2: Motorcycle Parking Facilities<br />
Measure 2: Motorcycle ycle Parking Facilities<br />
Summary<br />
Target Groups<br />
Impact<br />
Difficulty<br />
Responsibility<br />
Timescale<br />
5.2.3 Measure 3 – Changing Facilities and Showers<br />
2007/08 Expectation<br />
In 2007/08, some changing and showering facilities were available on both the City and St Peter’s<br />
campuses. The <strong>University</strong> aimed to consult with staff and students to ensure that additional<br />
facilities were provided in convenient locations and there was als also o a requirement to publicise their<br />
availability.<br />
Progress to 2009/10 /10 and moving forward to 2012/13<br />
Over the last two o years, the <strong>University</strong> has implemented additional shower and changing facilities<br />
at the City Campus. Where possible, the <strong>University</strong> will continue to provide additional shower and<br />
changing facilities in convenient locations.<br />
At present, City Campus is fully covered due to the brand new shower and changing facilities at<br />
CitySpace, which opened in October 2009. In addition to the new facilities lities at CitySpace, shower<br />
and changing facilities are also available in the Edinburgh and Darwin Buildings.<br />
At the St Peter’s Campus, shower and changing facilities are available at the David Goldman<br />
Informatics ormatics Centre (Ground Floor) and Media Centre (Level 2).<br />
It is expected that the upgrade <strong>of</strong> shower and changing facilities will continue across the campus<br />
as part <strong>of</strong> the ongoing campus re re-development. development. Maintaining and where possible increasing the<br />
number and quality <strong>of</strong> shower and changing facilities will be important for encouraging staff and<br />
students to cycle to the <strong>University</strong> <strong>University</strong>.<br />
Table 5.6 – Measure 3: Changing Rooms and Showers<br />
Measure 3: Changing Rooms and Showers<br />
Summary<br />
Target Groups<br />
Impact<br />
Difficulty<br />
Responsibility<br />
Timescale<br />
Provide 10 spaces at City and 10 spaces at St Peter’s Campus.<br />
Car users and motorcyclists, cyclists, staff, students and visitors<br />
Low<br />
Medium (funding and suitable locations required but small numbers)<br />
<strong>Travel</strong> <strong>Plan</strong> Coordinator, Facilities<br />
Total <strong>of</strong> 20 spaces (10 at each campus) by 2012 2012/13<br />
Continue with upgrade programme and provide additional facilities<br />
Car users and cyclists, staff and students<br />
Low<br />
Medium (funding and suitable locations required)<br />
<strong>Travel</strong> <strong>Plan</strong> Coordinator, Facilities<br />
Re-development development on campus to include the provision <strong>of</strong> new shower and<br />
changing rooms where possible. Should be incorporated into all new<br />
building developments on the campus. Ongoing going programme.