University of Sunderland - Travel Plan Final 200510-1
University of Sunderland - Travel Plan Final 200510-1
University of Sunderland - Travel Plan Final 200510-1
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>University</strong> <strong>of</strong> <strong>Sunderland</strong> <strong>Travel</strong> <strong>Plan</strong> Update<br />
• Highway improvements; mprovements; and<br />
• Better pedestrian and public transport links with St Peter’s Campus Campus.<br />
As part <strong>of</strong> the City Campus Development Framework, the following key projects have already<br />
been undertaken at the City Campus:<br />
• Demolition <strong>of</strong> Wearmouth Hall, Edinburgh Lecture Theatre, Edinburgh workshops and the<br />
Centre for Sports and Recreation Recreation;<br />
• Completion <strong>of</strong> the Gateway Building;<br />
• Fit out <strong>of</strong> the Murray Library;<br />
• Internal re-modelling modelling <strong>of</strong> the Edinburgh Building;<br />
• Reorganisation <strong>of</strong> Tec Technology Park to facilitate vacation <strong>of</strong> Hind Street Street; and<br />
• Completion <strong>of</strong> CitySpace – the new <strong>University</strong> Sports and Social Centre (pictured).<br />
In addition to projects already completed, the following emerging projects are identified in the<br />
2009 Development <strong>Plan</strong> Update:<br />
• New Faculty Building on St Michael’s Way;<br />
• Remodelling <strong>of</strong> the Design Centre;<br />
• Public realm improvements and arts project;<br />
• Centralised compoun compound for waste management;<br />
• Enhance Murray Library / Chester Road Facade;<br />
• Development <strong>of</strong> the proposed Hind Street Hotel and Conference Centre Centre; and<br />
• Priestman Building and Technology Park identified as long term development sites which<br />
could be leased to local business or disposed through sale sale.<br />
The implementation will be phased, with many projects scheduled for completion by the 2012/13<br />
academic year. . The phased strategy is requi required red so projects can be delivered in sequence which<br />
will allow the City Campus and the <strong>University</strong> as a whole to function as normal.<br />
Figure 1.2 overleaf is an extract from the latest version <strong>of</strong> the City Campus Development<br />
Framework and shows the expected layout <strong>of</strong> the City Campus on once re-development development work has<br />
been completed.<br />
5087709/<strong>University</strong> <strong>of</strong> <strong>Sunderland</strong> - <strong>Travel</strong> <strong>Plan</strong> <strong>Final</strong><br />
<strong>200510</strong>.docx<br />
13