13.07.2015 Views

PT BERAU COAL AND SUBSIDIARY - Bakrie & Brothers

PT BERAU COAL AND SUBSIDIARY - Bakrie & Brothers

PT BERAU COAL AND SUBSIDIARY - Bakrie & Brothers

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PT</strong> BAKRIE & BROTHERS TbkDAN ANAK PERUSAHAANCATATAN ATAS LAPORAN KEUANGANKONSOLIDASIANUNTUK PERIODE ENAM BULAN YANG BERAKHIRPADA TANGGAL 30 JUNI 2010 (TIDAK DIAUDIT)(Dengan Angka Perbandingan untuk Periode EnamBulan yang Berakhir pada Tanggal 30 Juni 2009)(Disajikan dalam Ribuan Rupiah, kecuali dinyatakanlain)<strong>PT</strong> BAKRIE & BROTHERS Tbk<strong>AND</strong> SUBSIDIARIESNOTES TO CONSOLIDATED FINANCIALSTATEMENTSFOR THE SIX-MONTH PERIOD ENDEDJUNE 30, 2010 (UNAUDITED)(With Comparative Figures for the Six-MonthPeriod Ended June 30, 2009)(Expressed in Thousands Rupiah, unlessotherwise stated)13. BIAYA PENGEMBANGAN PROYEK (Lanjutan) 13. PROJECT DEVELOPMENT COSTS (Continued)a. Proyek Karet a. Rubber ProjectSampai dengan tanggal 30 Juni 2010, biayayang dikeluarkan BSP dan Anak perusahaanuntuk Proyek Karet sehubungan denganrencana proyek pengembangan perkebunankaret di Bengkulu dengan luas areal 3.528 Ha.Biaya yang telah dikeluarkan untuk proyek inimerupakan biaya survey lapangan,pengurusan perijinan, dan operasional kebun.As of June 30, 2010, cost incurred by BSPand Subsidiaries for Rubber Project is relatedto the development of the project plan ofrubber in Bengkulu of 3,528 Ha. Thedisbursement for this project is for surveys,license processing, and plant operationalcosts.b. Proyek Pesisir b. Pesisir ProjectSampai dengan tanggal 30 Juni 2010, biayayang dikeluarkan BSP dan Anak perusahaanuntuk Proyek Pesisir sehubungan denganrencana proyek pengembangan perkebunankelapa sawit di Desa Rawang Bubur,Kecamatan Basa Ampek Balai Tapan,Kabupaten Pesisir Selatan, Sumatera Baratdengan luas areal 3.000 Ha, merupakan biayasurvey lapangan, pengurusan perijinan danrencana pengembangan areal kebun.As of June 30, 2010, costs incurred by BSPand Subsidiaries for Pesisir Project regardingthe development the project plan of oil palmplantations in Rawang Bubur Village,Kecamatan Basa Ampek Balai Tapan,Kabupaten Pesisir Selatan, West Sumatra of3,000 Ha, which consisted of surveys,license processing and land developmentplan costs.c. Proyek Internasional c. International ProjectSampai dengan tanggal 30 Juni 2010, biayayang dikeluarkan BSP dan Anak perusahaanuntuk Proyek Internasional sehubungandengan rencana proyek pengembanganperkebunan karet seluas 4.000 Ha danperkebunan kelapa sawit seluas 4.000 Ha diLiberia, Afrika Barat, merupakan biaya surveylapangan dan pengurusan perijinan.As of June 30, 2010, costs incurred by BSPand Subsidiaries for International Project inrelation to the development project plan of4,000 Ha of rubber and 4,000 Ha of oil palmplantations in Liberia, West Africa, whichconsisted of surveys and license processingcosts.d. Proyek Sarolangun d. Sarolangun ProjectSampai dengan tanggal 30 Juni 2010, rencanapengembangan perkebunan kelapa sawit diKabupaten Sarolangun telah sampai padapemetaan lahan seluas 6.378 Ha,land clearing 2.154 Ha, pembangunanjalan dan jembatan produksi lebar 7Msepanjang 18.198 meter, pembangunan jalandan jembatan koleksi lebar 5M sepanjang69.705 meter, pembibitan 499.612 pokok danpenanaman seluas 1.920 Ha.As of June 30, 2010, the development of theproject plan of oil palm plantations inKabupaten Sarolangun has achieved theblocking of an area amounting to 6,378 Ha,land clearing of 2,154 Ha, infrastructure roadand bridge for production of 7M width of18,198 metres, infrastructure road and bridgefor collection of 5M width of 69,705 metres,499,612 seedlings and planting of 1,920 Ha.66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!