8.4 ELITE Satellite design 167<br />

incorporate its own warm reset/reboot capability. The backup processor will provide a<br />

cold boot capability for the main CPU. Both the main and back-up processors will have<br />

anomaly detection and safing functions.<br />

8.4.3 Telemetry and mission operations<br />

For the GEO-type orbit, the nominal operations can be performed via a single groundstation,<br />

essentially in real-time. NORAD and on-board GPS [TBD for GEO] (to ≈ 100 m)<br />

will provide sufficiently accurate orbit determination so ground-based tracking/ranging<br />

will not be required.<br />

Telemetry will be packetised according to CCSDS standards and managed by either the<br />

main or backup processor [TBD]. Standard S-band telemetry rates are: 2 Mbps S-band<br />

downlink (11 m ground-station), 1 kbps uplink. If a 1 m portable station is used, the<br />

available downlink rate is reduced by an order of magnitude (i.e. to 1.4 kbps) which is,<br />

nevertheless, sufficient for ELITE (see Table 8.1). For the GEO orbit, an on-board solidstate<br />

storage capability would not be required.<br />