View Document Here - Hanford Site
View Document Here - Hanford Site
View Document Here - Hanford Site
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix F - Detailed Descriptioqof Alternative 3: DOFIR1,2001-11<br />
Entombment with Internal Waste Disposal Rev. a aR<br />
Redlinc/Slrikeoul<br />
ATTACI3111ENT Fl -FUNCTIONAL HIERARCHY<br />
I F.1.4.1.10 Disposition 291-U Stack<br />
2 F.1.4.1.11 Disposition 222-U Office Lab<br />
3 F.1.4.1.12 Disposition 224-U Concentration Facility, U03 Plant<br />
4 F.1.4.1.13 Disposition 224-UA Calcination Facility<br />
5 F.1.4.1.14 Disposition 272-U Maintenance Shop<br />
6 F.1.4.1.15 Disposition 292-U Stack Monitoring Station<br />
7 F.1.4.1.16 Disposition 2715-UA Maintenance Shop<br />
8 F.1.42 Disposition buried piping which are located bcneath the proposed<br />
9 environmental cap<br />
10 F.1.4.2.1 Remove air tunnel outside 221-U<br />
11 F.1.4.2.2 Remove misc yard piping and encasements<br />
12 F.1.43 Confirm remediation of waste sites within environmental cap footprint<br />
13 F.1.4.3.1 216-U-4 Reverse Well<br />
14 F.1.4.3.2 216-U- 4A French Drain<br />
15 F.1.43.3 216-Ur4B French Drain<br />
16 F.1.4.3.4 216-U-5 Trench<br />
17 F.1.4.3.5 216-U-6 Trench<br />
('118 F.1.4.3.6 216-U-7 French Drain<br />
19 F.1.4.3.7 216-U-iSTrench<br />
20 F.1.4.3.8 224-U-HWSA<br />
21 F.1.4.3.9 241-UX-154 Diversion Box<br />
22 F.1.4.3.10 241-UX-302A Catch Tank<br />
23 F.1.4.3.11 2607-W-7 Septic Tank and Drain Field<br />
24 F.1.43.12 UPR 200-W-33<br />
25 F.l .4.3.13 UPR200-W-39<br />
26 F.1.4.3.14 UPR 200-W-55<br />
27 F.1.4.3.15 UPR 200-W-60<br />
28 F.1.43.16 UPR 200-W-78<br />
29 F.1.43.17 UPR200-W-101<br />
30 F.1.4.3.18 UPR 200-W-118<br />
31 F.1.4.3.19 UPR200-W-125<br />
32 F.1.4.3.20 UPR 200-W-138<br />
33 F.1.4.3.21 UPR 200-W-162<br />
34 F.1.4.4 Confirm that wells located within environmental cap have been<br />
35 decommissioned<br />
36 F.1.4.4.1 299-W 19-8<br />
37 F.1.4.4.2 299-W19-55<br />
38 F.1.4.4.3 299-W 19-98<br />
39 F.1.4.5 Earthwork to prepare working area adjacent to 221-U<br />
40 F. 1.4.5.1 Prepare area along northwest side<br />
41 F.1.4.5.2 Prepare area along southeast side<br />
Final Feasibility Stndyjor the Canyon Disparirron /nitiative (221 •U Facilrty}<br />
une ^ F-31