Appendix G -Detailed Description of Alternative 4: DOF1R1,-200i-11<br />

^ Entombment with Internal and External Waste Disposal Rev. I Draft B<br />

Redline/Strikeout<br />

l plumes above 1Vashirtgton Admrn)arrarive Code (WAC) 173-340 .', Genfowl.Ae<br />

2 (14F6A}industrial limits associated with the Alternative 4 activities. During Alternative 4<br />

3 activities (such as buried pipe and exterior ventilation tunnel removal), if soil contamination<br />

4 above 1- 0 industrial limits is identified, then the Tri-Parties would need<br />

5 to evaluate the situation and make the decision whether to remove the contamination.<br />

6 Contaminated equipment and piping from demolition activities would be disposed at the<br />

7 Environmental Restoration Disposal Facility (ERDF).<br />

8<br />

9 2. Facilities to be decontaminated and decommissioned in support of implementation of<br />

10 Alternative 4 are the 221-U Facility stairwells, the railroad tunnel, the 271-U Office<br />

I l Building, and the 276-U Solvent Recovery Facility. Aboveground facilities that are within<br />

12 the footprint of the Alternative 4 environmental cap would be removed as part of<br />

13 Alternative 4 activities. These facilities include the 21 I-U and 21 I-UA Tank Farms,<br />

14 241-WR Vault'Iitorium Storage, 271-U Office Building, 276-U Solvent Recovery Facility,<br />

15 2714-U Warehouse, 275-UR Chemical Storage Warehouse, 200-W-44 Sand Filter, 291-U<br />

16 Process Unit Plant, 291-U-1 Stack, 296-U-10 Stack, 222-U Office Lab, 224-U Concentration<br />

17 Facility, 224-UA Calcination Facility, 272-U Maintenance Shop, 2715-UA Maintenance<br />

18 Shop, and 292-U Stack Monitoring Station. The rcmediation of these facilities is to be<br />

19 performed by others and. therefore, such rem diation work is not accounted for in the<br />

20 Alternative 4 cost estimate. However. disposition and removal of the same facilities after<br />

t^21 they have been remediat de are corsidcred part of the Alternative 4 scopc and are includcd in<br />

22 the cost estimates in Sections 5 .0 and 6 .0 and in Appendix K of this final feasibility study<br />

23 (FS),<br />

24<br />

25 3. Waste sites that are within the footprint of the environmental cap and must be remediated by<br />

26 other projects in time to support Alternative 4 include the 216-U-4 Reverse Well; 216-U-4A<br />

27 French Drain; 216-U-4B French Drain; 216-U-5 Trench; 216-U-6 Trench; 216-U-7 French<br />

28 Drain; 216-U-15 Trench; 224-U-FIWSA; 224-U CNT; 241-UX-154 Diversion Box;<br />

29 241-IJX-302A Catch Tank; 2607-W-7 Septic Tank and Drain Field; 270-W Tank; unplanned<br />

30 releases (UPRs) UPR 200W-33, UPR 200-W-39, UPR 200-W-55, UPR 200W-60,<br />

31 UPR 200-W-78, UPR 200-W-101, UPR-200-W-117, UPR 200-W-1 18, UPR 200-W-125,<br />

32 UPR 200-W-138, and UPR 200-W-162; and portions of process lines associated with<br />

33 200-W42, 200-W-84, and UPR-600-20. Three wells are located within the footprint of the<br />

34 environmental cap: wells 299-W 19-8, 299-W 19-55, and 299-W 19-98. It is assumed that<br />

35 these wells would be decommissioned in time to support Alternative 4. This work scope is<br />

36 not included in the cost estimatc<br />

37<br />

38 4. Unless otherwise noted In this appendix, wastes from legacy structure removal and removal<br />

39 of the operating gallery equipment and piping would be disposed at ERDF. This maintains<br />

40 the canyon and gallery volume for disposal of Class C wastes from other waste sites on the<br />

41 <strong>Hanford</strong> <strong>Site</strong>. For removal and hauling to ERDF, remediation waste would be in accordance<br />

42 with ERDF waste acceptance criteria (BHI 1997, 200Ib), and compliancc with size and<br />

43 weight reguirementj would be coordinated with ERDF operations during final design if this<br />

44 alternative is selected.<br />

45<br />

Final Feastbility Stady for the Canyon DisposFlton teltlative (?21•U FadAky)<br />

June '1oo G-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!