Appendix 11 - Detailed Description of Alternative 6: Do>:JRL-2001-1t<br />

Close in Place - Collapsed Structure Rev.1e ntatt B<br />

R ^icilin •4/Sirj{,ctxit<br />

1<br />

2<br />

3 gallefy-wtwld-be-re,-. o..-•l:-;e-4 emparat^ eeveF-end-rellup^leer used foF the lewerlevel gallery<br />

4 would be Feleealed.<br />

5<br />

6 H.2.1.2 Grout Pipe Gallery. The pipe gallery would be grouted in the same manner as the<br />

7 1 electrical gallery. Greut•wetdd-be-pleeed-inside-the-eentainers-e.44hey-er<br />

9<br />

10<br />

11 H.2.2 Demolition of 221-U Building<br />

12<br />

13 Conventional methods and technologies, such as wrecking balls and shears, are not suited for<br />

14 demolishing this concrete structure and are not effective when wall or floor thickness exceeds<br />

15 0.9 m ( 1 ft). The 221-U Facility contains structural components that typically exceed 1.5 m in<br />

16 thickness. The recommended demolition method would be to cut the building into sections using<br />

17 diamond wire saws. Large elevated pieces (such as roof panels) that would be hazardous to<br />

18 demolish in place due to their elevation would be removed intact and set on the ground.<br />

19 Elevated wall pieces would be cut into large sections that would be placed either on top of the<br />

20 1 roof slabs or on the canvon deck . The end walls of the canyon would be<br />

i^'.1 demolished by wire sawing It into blocks.<br />

22<br />

23 The diamond wire cutting technique uses a small quantity of water to cool and lubricate the wire.<br />

24 The wastewater would be captured and, if needed, removed from the site for treatment. Adjacent<br />

25 roof panels are keyed with a stair-step joint similar to the cover block edges, making it feasible to<br />

26 cut the canyon into pieces that are about 12 m(40 ft) long.<br />

27<br />

28 13.2.2.1 Mobilize and Erect Cranes. Cranes necessary for removal of roof panels would be<br />

29 brought to the site and erected. These cranes would be used to remove building sections as they<br />

30 are cut by the diamond wire saws.<br />

31<br />

32 H.2.2.2 Retnove End Walls and Roof Sections. Removal would start with the end wall at the<br />

33 building's north end. The end walls are unreinforced. The northeast end wall should be<br />

34 removed first because the roof removal would begin at that end of 221-U. Removing the roof<br />

35 panel above the end wall, with the end wall in place, could damage this unreinforced concrete,<br />

36 with the risk of collapsing it. The end walls would be wire sawed into blocks and lifted to the<br />

37 ground level. Wall demolition debris would be placed with other building sections. The end<br />

38 walls would not be required for the structural stability of the canyon during the Alternative 6<br />

39 activities. The end wall at the southwest end of 221-U would be dealt with similarly, any time<br />

40 prior to removal of the adjacent roof panel.<br />

41<br />

42 Wire saws would be used to cut the roof panels from their connection to the walls. The roof<br />

(ON3 panels would be removed from the building as a full (12-m [40-ft]) section. lrfting the roof<br />

44 panel in one piece would be safer than supporting the roof and walls and breaking the elevated<br />

45 slab into pieces. The ground must be shaped to fit the underside of the roof to eliminate voids<br />

Final FeasibiUry Study for drc Canyon Dispoittion biltiative (221-U Faciliry)<br />

^ lune2003 1-1-17