19.05.2013 Views

View Document Here - Hanford Site

View Document Here - Hanford Site

View Document Here - Hanford Site

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(O'N<br />

APPENDIX E<br />

3 ATTACHMENT El -FUNCTIONAL HIERARCHY<br />

4<br />

5<br />

6 E.1 PREPARE EXISTING COMPLEX<br />

7 E.1.1 Control hazards<br />

DOEIRL-2001-1 l<br />

Rev. 0 1 Draft D<br />

&dlinc/Strikenut<br />

8 E.1.1.1 Establish hazards protection<br />

9 E.1.1.t.1 Control heaith and safety hazards<br />

10 E.1.1.1.2 Control environmental hazards<br />

11 E.1.1.2 Manage hazardous materials<br />

12 E.1.1.2.1 Characterize hazardous materials<br />

13 E.1.1.2.2 Dccontaminate areas and systems<br />

14 E.1.1.2.3 Prepare hazardous materials for processing and disposition<br />

15 E.1.2 Establish inftastruMure<br />

16 E.1.2.1 Modify existing infrastruture<br />

17 E.1.2.1.1 Water<br />

18 E.1.2.1.2 Sewer<br />

(--N19 E.1.2.1.3 Electrical<br />

20 E.1.2.1.4 HVAC<br />

21 E.1.2.1.5 Lighting<br />

22 E.1.2.1.6 Recertify main bridge crane<br />

23 E.1.2.1.7 Install new roof system<br />

24 E.1.2.2 Establish support facilities<br />

25 E.1.2.2.1 Modifications to the existing building<br />

26 E.1.2.2.2 Install mobile office units<br />

27 E.1.2.3 Establish staging areas<br />

28 E.1.2.3.1 Establish personnel staging areas (change rooms, operations,<br />

29 lunchroom, first aid, emergency, offices...)<br />

30 E.1.2.3.2 Establish equipment staging areas (maintenance, repair,<br />

31 decontamination, packaging, waste shipping, haul vehicle<br />

32 frisking, parking,...)<br />

33 E.1.2.3.3 Add ramp and truck door to 221-U<br />

34 E.1.3 Modify Facility<br />

35 111.3.1 Prepare facility for use<br />

36 E.1.3.1.1 Inspect 271-U for its role during preparing the complex<br />

37 E.1.3.1.2 Identify 221-U building modifications, if any, required for its<br />

38 support during first phase of Altetnative 1<br />

/^39<br />

E.1.3.2 D&D Railroad Tunnel<br />

f 40 E.1.3.2.1 Remove soil cover<br />

41 E.1.3.2.2 Fix contamination on tunnel interior<br />

Final Feasibility Smdy/or the Canyon DLrpwUiai Initiative (271-U Facility)<br />

mc'+001 E-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!