Appendix E - Detailed Description of Alternative 1: DOF/Ri.-2001-1 i<br />
Full Removal and Disposal Rev. o i Dran p<br />
Redlinc/Strikcout<br />
ATTACHMENT El - FUNCTIONAL IIIERARCHY<br />
1 E.1.4.3.2 Prepare area along southeast side<br />
2 E.IS Manage Hazardous Wastes<br />
3 E.1.5.1 Identify waste generated<br />
4 E.1.5.2 Prepare inventory of waste shipments to ERDF and elsewhere<br />
7 E.2 OPERATE EXISTING COMPLEX<br />
8 E.2.1 D&D 221-U Building<br />
9 E.2.1.1 Mobilize and erect cranes<br />
10 E.2.1.2 Remove roof sections<br />
11 E.2.1.2.1 Wire saw panels<br />
12 E.2.1.2.2 Remove and place at ground level<br />
13 E.2.1.2.3 Size reduce panels with wire saw on ground<br />
14 E.2.1.2.4 Load & haul to ERDF<br />
15 E.2.1.2.5 ERDF unload & disposal<br />
^l6 E.2.1.3 Remove canyon walls down to canyon deck level<br />
17 E.2.1.3.1 Wire saw into bloeks (approx 90 metric tons). Will be done one<br />
18 building segment at a time.<br />
19 E.2.1.3.2 Use crane for block removal<br />
20 E.2.1.3.3 Load & haul to ERDF<br />
21 E.2.1.3.4 ERDF unload & disposal<br />
22 E.2.1.4 Excavate outside building for 221-U foundation demolition<br />
23 E.2.1.4.1 Excavate<br />
24 E.2.1.4.2 Haul material to stockpile area<br />
25 E.2.1.4.3 Dust control<br />
26 E.2.1.5 Demolish 221-U from canyon level to bottom of foundation<br />
27 E.2.1.5.1 Remove cell & trench covers<br />
28 E.2.1.5.2 Wire saw and remove concrete wall/slab segments down to<br />
29 foundation slab (approx 90 metric ton sections)<br />
30<br />
31<br />
E.2.1.5.3<br />
E.2.1.5.4<br />
Foundation slab will be split using Bristar.<br />
Excavate around and demolish Cell 10 lower section<br />
32 E.2.1.5.5 Load concrete into containers<br />
33 E.2.1.5.6 Haul containers to queue<br />
34 E.2.1.5.7 Transportation and disposal at ERDF<br />
35 E.2.1.6 Excavate soil 3 feet below foundation level<br />
36 E.2.1.6.1 Excavate for soil removal<br />
37<br />
E.2.1.6.2 Demolish cell drain header (24" pipe)<br />
^38<br />
39<br />
E.2.1.6.3<br />
E.2.1.6.4<br />
Load concrete debris onto site haul trucks<br />
Haul debris to ERDF for disposal<br />
Final Feasibifity Stady jor the Canyon Disposition lniNative (22!•t/ Facifiry)<br />
junc 2003 E-21