Appendix E - Detailed Description of Alternative 1: DOF/Ri.-2001-1 i<br />

Full Removal and Disposal Rev. o i Dran p<br />

Redlinc/Strikcout<br />

ATTACHMENT El - FUNCTIONAL IIIERARCHY<br />

1 E.1.4.3.2 Prepare area along southeast side<br />

2 E.IS Manage Hazardous Wastes<br />

3 E.1.5.1 Identify waste generated<br />

4 E.1.5.2 Prepare inventory of waste shipments to ERDF and elsewhere<br />

7 E.2 OPERATE EXISTING COMPLEX<br />

8 E.2.1 D&D 221-U Building<br />

9 E.2.1.1 Mobilize and erect cranes<br />

10 E.2.1.2 Remove roof sections<br />

11 E.2.1.2.1 Wire saw panels<br />

12 E.2.1.2.2 Remove and place at ground level<br />

13 E.2.1.2.3 Size reduce panels with wire saw on ground<br />

14 E.2.1.2.4 Load & haul to ERDF<br />

15 E.2.1.2.5 ERDF unload & disposal<br />

^l6 E.2.1.3 Remove canyon walls down to canyon deck level<br />

17 E.2.1.3.1 Wire saw into bloeks (approx 90 metric tons). Will be done one<br />

18 building segment at a time.<br />

19 E.2.1.3.2 Use crane for block removal<br />

20 E.2.1.3.3 Load & haul to ERDF<br />

21 E.2.1.3.4 ERDF unload & disposal<br />

22 E.2.1.4 Excavate outside building for 221-U foundation demolition<br />

23 E.2.1.4.1 Excavate<br />

24 E.2.1.4.2 Haul material to stockpile area<br />

25 E.2.1.4.3 Dust control<br />

26 E.2.1.5 Demolish 221-U from canyon level to bottom of foundation<br />

27 E.2.1.5.1 Remove cell & trench covers<br />

28 E.2.1.5.2 Wire saw and remove concrete wall/slab segments down to<br />

29 foundation slab (approx 90 metric ton sections)<br />

30<br />

31<br />

E.2.1.5.3<br />

E.2.1.5.4<br />

Foundation slab will be split using Bristar.<br />

Excavate around and demolish Cell 10 lower section<br />

32 E.2.1.5.5 Load concrete into containers<br />

33 E.2.1.5.6 Haul containers to queue<br />

34 E.2.1.5.7 Transportation and disposal at ERDF<br />

35 E.2.1.6 Excavate soil 3 feet below foundation level<br />

36 E.2.1.6.1 Excavate for soil removal<br />

37<br />

E.2.1.6.2 Demolish cell drain header (24" pipe)<br />

^38<br />

39<br />

E.2.1.6.3<br />

E.2.1.6.4<br />

Load concrete debris onto site haul trucks<br />

Haul debris to ERDF for disposal<br />

Final Feasibifity Stady jor the Canyon Disposition lniNative (22!•t/ Facifiry)<br />

junc 2003 E-21