Sleeve and insert work 5CSL0-06B<br />

2. Guideline for each installation process<br />

2.1 Sleeve and insert work<br />

2.1.1 Positioning <strong>of</strong> the pipe holes<br />

1. The through holes for the drain piping should be positioned<br />

such that pipes have a downward gradient (the<br />

gradient must be at least 1/100.The thickness <strong>of</strong> the insulating<br />

materials must also be taken into consideration.)<br />

2. The diameter <strong>of</strong> the through holes for the refrigerant piping<br />

should include an allowance for the thickness <strong>of</strong> the<br />

heat insulation materials.<br />

3. Attention should be paid to the construction <strong>of</strong> the beam<br />

themselves since there are sometimes parts <strong>of</strong> the beam<br />

which cannot be used to accommodate through holes.<br />

2.1.2 Selection <strong>of</strong> sleeve<br />

1. Sleeve work should be performed to make a space for<br />

passing pipe and wire through the wall or ground under<br />

construction.<br />

For exam<strong>pl</strong>e if gas pipe and liquid pipe is 12.7mm , 6.35mm<br />

the sleeve diameter is minimum 79.05mm .<br />

Gas pipe diameter 12.7mm<br />

Liquid pipe diameter 6.35mm<br />

Insulation thickness(gas pipe) 10mm x 2<br />

Insulation thickness(liquid pipe) 10mm x 2<br />

20mm sur<strong>pl</strong>us 20mm<br />

Total sleeve diameter 79.05mm<br />

* Assumption : Gas pipe insulation thickness and liquid pipe<br />

insulation thickness is 10mm and 10mm respectively<br />

2.1.3 Sleeve type<br />

NOTE<br />

Pipe<br />

Sleeve<br />

Insulation<br />

Sleeve type should be considered as per local regulation &<br />

laws.<br />

NOTE<br />

CAUTION<br />

1. In high voltage generation <strong>pl</strong>aces, water-pro<strong>of</strong> flexible<br />

conduit should be used. (in substation room, in elevator<br />

room)<br />

2. Conduit should be chosen in accordance with electrical<br />

installation regulation.<br />

Cable conduit should be considered under the local regulation<br />

& laws.<br />

2.1.4 Insert work and support work<br />

An insert is a metal tool which is inserted into a floor or<br />

beam before the concrete is set such that fittings such as<br />

duct , pipes or suspension bolts for hanging units can be fitted<br />

into the <strong>pl</strong>ace later. The positioning <strong>of</strong> the inserts must<br />

be decided early.<br />

1. Insert work<br />

Exam<strong>pl</strong>e : Through holes in a reinforced concrete beam<br />

Molding box<br />

290 Guideline for each installation process<br />

Embedding<br />

depth h<br />

Polyblock<br />

Nail securing<br />

molding box<br />

Suspension bolt