03.06.2013 Views

1 - page screenshot of chlodzenie.pl

1 - page screenshot of chlodzenie.pl

1 - page screenshot of chlodzenie.pl

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Refrigerant piping work 5CSL0-06B<br />

Brazing work should be carried out either downwards or sideways.<br />

An upward direction should be avoided wherever possible(to prevent leakage).<br />

Piping size<br />

6.35<br />

9.52<br />

12.7<br />

15.9<br />

19.1<br />

22.2<br />

25.4<br />

31.8<br />

38.1<br />

44.5<br />

CAUTION<br />

Table 1: Correlation <strong>of</strong> nozzle tip and size <strong>of</strong> refrigeration piping<br />

# 200<br />

over 10mm<br />

(Expending pipe brazing)<br />

(Flare part brazing)<br />

N2<br />

N2<br />

over 10mm<br />

(Pipe brazing with socket)<br />

(Butt-brazing)<br />

Nozzle tip No. Brazing filler diameter Ø<br />

# 225 # 250 # 315 # 400 # 450 # 500 1.6 2.4 3.2<br />

1. Generally expending pipe brazing is performed with pan-coil type copper pipe, and socket blazing is<br />

performed with straight copper pipe.<br />

2. Do not perform flare part brazing or butt-brazing.<br />

3. Brazing should be performed on welding table.<br />

4. Any dust should enter in the pipe while brazing.<br />

5. Distance <strong>of</strong> copper pipe support spacing is within 1~2m<br />

6. The copper pipe should not be secured directly by metal brackets.<br />

296 Guideline for each installation process<br />

N2<br />

N2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!