03.06.2013 Views

1 - page screenshot of chlodzenie.pl

1 - page screenshot of chlodzenie.pl

1 - page screenshot of chlodzenie.pl

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Refrigerant piping work 5CSL0-06B<br />

2.2 Refrigerant piping work<br />

2.2.1 Flaring work<br />

NOTE<br />

CAUTION<br />

Flare connection and procedure<br />

1. Stiffened pipe must always be annealed at least once<br />

prior to the flaring work.<br />

A<br />

2. A pipe cutter must be used to cut the pipe.<br />

(A large pipe cutter must be used where<br />

the pipe has a large diameter. When cutting<br />

a pipe which is too big for the pipe cutter a<br />

metal saw may be used but care must be<br />

taken to ensure that the debris from sawing<br />

does not get into the pipe.)<br />

D<br />

CAUTION<br />

Choice <strong>of</strong> material for refrigerant piping<br />

Copper pipe selection<br />

a. The wall thickness <strong>of</strong> the refrigerant piping should com<strong>pl</strong>y with relevant local and national regulation for<br />

R410A the design pressure is 3.8MPa.(38.7kgf/cm2 )<br />

b. If not, we recommend to use with phosphorus deoxidized copper type<br />

c. Generally used copper pipe specifications as follows;<br />

Size(ø)mm<br />

Torque<br />

kg·f.m R22<br />

Thickness<br />

R410A<br />

6.35 1.80~2.50 0.7 0.8<br />

9.52 3.40~4.20 0.8 0.8<br />

12.70 5.50~6.60 0.8 0.8<br />

15.88 6.30~8.20 1.0 1.0<br />

19.05 9.90~12.1 1.0 1.0<br />

* Never use the pipe which is mixed scrap or a pipe used somewhere else<br />

The method how to distinguish the pipe mixed scarp : check the oxidization evidence after leaving the pipe for 24hour.<br />

External diameter <strong>of</strong> pipe D<br />

(in) (mm)<br />

1. Burrs should be carefully removed.<br />

2. 2 spanners should be used to grip the pipe.<br />

3. The flare nut must be inserted before starting the flaring operation.<br />

4. The appropriate amount <strong>of</strong> torque should be used to tighten the flare nut.<br />

5. Check that there is no superficial damage to the surface <strong>of</strong> the flare.<br />

H<br />

3. Set the flaring tool to make sure the flare size remains<br />

within the prescribed limits.<br />

4. Coat the inner and outer surface <strong>of</strong> the<br />

flare with refrigerator oil (Ester or ether<br />

oil).<br />

(this ensures that the flare nut passes<br />

smoothly, preventing the pipe Oil<br />

Oil<br />

from twisting.)<br />

Do not use SUNISO-4GS oil.<br />

Pipe widening dimension A<br />

(mm)<br />

Required flare height H<br />

(mm)<br />

1/4 6.35 8.6~9.0 1.1~1.3<br />

3/8 9.52 12.6~13.0 1.5~1.7<br />

1/2 12.7 15.8~16.2 1.6~1.8<br />

5/8 15.88 19.0~19.4 1.6~1.8<br />

3/4 19.05 22.9~23.3 1.9~2.1<br />

292 Guideline for each installation process

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!