03.06.2013 Views

1 - page screenshot of chlodzenie.pl

1 - page screenshot of chlodzenie.pl

1 - page screenshot of chlodzenie.pl

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5CSL0-06B<br />

2.2.5 Refrigerant pipe flushing<br />

Flushing is a method <strong>of</strong> cleaning extraneous matter out <strong>of</strong> pipes using pressurized gas.<br />

NOTE<br />

Refrigerant pipe flushing <strong>of</strong> 3 major effects<br />

1. Removal <strong>of</strong> oxidation bubbles formed inside copper pipes when “nitrogen re<strong>pl</strong>acement is insufficient”<br />

during soldering work<br />

2. Removal <strong>of</strong> extraneous material and moisture from pipes when covering has been insufficient<br />

3. Checks connections in pipes linking outdoor and indoor units (Both liquid and gas pipes)<br />

① Set pressure regulator on nitrogen cylinder.<br />

② Connect the charge hose from pressure regulator to<br />

service port on the liquid pipe side <strong>of</strong> the outdoor unit<br />

before its connection to BD unit or indoor unit.<br />

③ Open the main valve on the nitrogen cylinder and set<br />

the pressure regulator to 0.5MPa.<br />

④ Ensure that nitrogen is flowing through the pipe properly.<br />

⑤ For flushing block the end <strong>of</strong> the pipe with wood insulation<br />

block.<br />

⑥ When the pressure becomes great remove the block<br />

quickly.<br />

⑦ Do step 6 & 7 repeatedly till cleanness is ensured.<br />

⑧ Connect the charge hose from pressure regulator to<br />

service port on the gas pipe side <strong>of</strong> outdoor unit before<br />

its connection to BD unit or indoor unit.<br />

⑨ Flow the steps 3, 4, 5, 6, 7.<br />

⑩ In case <strong>of</strong> BD unit system, before connecting to indoor<br />

units, each pipe should be flushed individually.<br />

⑪ Flow the steps 3, 4, 5, 6, 7.<br />

CAUTION<br />

After welding the pipe, nitrogen flushing is strongly<br />

recommended.<br />

Nitrogen<br />

Nitrogen<br />

Primary<br />

side<br />

Nitrogen<br />

Pressure regulator<br />

Gas pressure <strong>of</strong> 0.5 MPa<br />

Refrigerant piping work<br />

Guideline for each installation process 297<br />

Lo Hi<br />

Lo Hi<br />

Wood Insulation<br />

Lo Hi<br />

Secondary<br />

side 0.5 MPa<br />

Taping

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!