03.06.2013 Views

Registration Document 2005 - Total.com

Registration Document 2005 - Total.com

Registration Document 2005 - Total.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10<br />

Appendix 2 - Supplemental oil and gas information (unaudited)<br />

Other information<br />

The following table sets forth a breakdown of capitalized exploratory costs at year-end <strong>2005</strong>, 2004 and 2003 by category of exploratory activity:<br />

Amounts as of December 31 (in millions of euros) <strong>2005</strong> 2004 2003<br />

Projects with recent or planned exploratory activity 482 389 317<br />

Wells for which drilling is not <strong>com</strong>pleted 63 91 39<br />

Wells with drilling in past 12 months 200 126 223<br />

Wells with future exploratory activity firmly planned (1) 219 172 55<br />

• future exploratory drilling planned<br />

156 148 55<br />

other exploratory activity planned (2)<br />

• 63 24 0<br />

Projects with <strong>com</strong>pleted exploratory activity 108 41 105<br />

Projects not requiring major capital expenditures 0 0 0<br />

Projects requiring major capital expenditures 108 41 105<br />

<strong>Total</strong> 590 430 422<br />

Number of wells at end of year 85 56 62<br />

(1) All projects included in this line require major capital expenditures.<br />

(2) At the end of <strong>2005</strong>, this relates to five wells whose continuing capitalization is justified by firmly planned seismic activity for two wells and significant studies for the remaining three wells.<br />

At the end of <strong>2005</strong>, there was no amount of capitalized exploratory<br />

drilling costs that was associated with areas not requiring major<br />

capital expenditures before production could begin, where more<br />

than one year had elapsed since the <strong>com</strong>pletion of drilling.<br />

At the end of <strong>2005</strong>, an amount of 108 M€ was associated with<br />

suspended wells in areas where major capital expenditures will<br />

be required and no future exploratory activity is firmly planned.<br />

This amount corresponds to six projects (19 wells) and is mainly<br />

associated with the four projects further described below:<br />

The first project (PazFlor–3rd Pole of Block 17) relates to a group of<br />

four deepwater oil discoveries in Angola on which five wells were<br />

drilled between 2000 and 2004 for a capitalized amount of 39 M€<br />

as of December 31, <strong>2005</strong> and one well was drilled in <strong>2005</strong> for a<br />

capitalized amount of 10 M€ as at December 31, <strong>2005</strong>. Studies<br />

carried out in <strong>2005</strong> for the development of this group of discoveries<br />

have led to the selection of the development concept (Floating,<br />

Production, Storage and Offloading unit or FPSO with a capacity<br />

of 200 kbbl/d) on the basis of which engineering studies have now<br />

been launched. Booking of proved reserves is currently anticipated<br />

in 2006-2008.<br />

The second project (Usan) relates to a deepwater oil discovery in<br />

Nigeria for which six wells were drilled between 2001 and 2004<br />

for a capitalized amount of 28 M€ as of December 31, <strong>2005</strong> and<br />

Amounts and number of wells as of December 31<br />

(in millions of euros)<br />

242 TOTAL - <strong>Registration</strong> <strong>Document</strong> <strong>2005</strong><br />

two wells were drilled in <strong>2005</strong> for a capitalized amount of 7 M€<br />

as of December 31, <strong>2005</strong>. Following these exploration works,<br />

engineering and development studies have been performed in<br />

<strong>2005</strong> leading to the submission to the national oil <strong>com</strong>pany NNPC<br />

of a Field Development Plan which envisages the construction<br />

of a FPSO. Booking of proved reserves is currently anticipated in<br />

2006-2008.<br />

The third project (Laggan) relates to a deepwater gas discovery in<br />

the UK West of Shetland Islands, for which one well was drilled in<br />

2004 for a capitalized amount of 16 M€ as of December 31, <strong>2005</strong>.<br />

TOTAL and its partners have launched studies to define the<br />

development concept. Booking of proved reserves is currently<br />

anticipated in 2007-2009.<br />

The fourth project (Bonga SW) relates to a deepwater oil<br />

discovery in Nigeria for which three wells were drilled between<br />

2001 and 2003 and for which 8 M€ were capitalized as of<br />

December 31, <strong>2005</strong>. Together with the operator and co-venturers,<br />

the Company is working on the elaboration of a Field Development<br />

Plan and pursuing negotiations aimed at a possible unitization of<br />

the field with adjacent licenses. The project team set up in <strong>2005</strong><br />

by the operator has launched the selection of potential contractors<br />

for the development. Booking of proved reserves is currently<br />

anticipated in 2006-2008.<br />

<strong>2005</strong> 2004 2003<br />

amount number amount number amount number<br />

wells for which drilling is not <strong>com</strong>pleted 63 12 91 13 39 10<br />

wells with <strong>com</strong>pleted drilling<br />

Less than 1 year<br />

• 200 29 126 12 223 23<br />

Between 1 and 4 years<br />

• 304 40 198 29 139 26<br />

Between 4 years and 8 years<br />

• 23 4 15 2 21 3<br />

More than 8 years<br />

• - - - - - -<br />

<strong>Total</strong> 590 85 430 56 422 62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!