Registration Document 2005 - Total.com
Registration Document 2005 - Total.com
Registration Document 2005 - Total.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
10<br />
Appendix 2 - Supplemental oil and gas information (unaudited)<br />
Other information<br />
The following table sets forth a breakdown of capitalized exploratory costs at year-end <strong>2005</strong>, 2004 and 2003 by category of exploratory activity:<br />
Amounts as of December 31 (in millions of euros) <strong>2005</strong> 2004 2003<br />
Projects with recent or planned exploratory activity 482 389 317<br />
Wells for which drilling is not <strong>com</strong>pleted 63 91 39<br />
Wells with drilling in past 12 months 200 126 223<br />
Wells with future exploratory activity firmly planned (1) 219 172 55<br />
• future exploratory drilling planned<br />
156 148 55<br />
other exploratory activity planned (2)<br />
• 63 24 0<br />
Projects with <strong>com</strong>pleted exploratory activity 108 41 105<br />
Projects not requiring major capital expenditures 0 0 0<br />
Projects requiring major capital expenditures 108 41 105<br />
<strong>Total</strong> 590 430 422<br />
Number of wells at end of year 85 56 62<br />
(1) All projects included in this line require major capital expenditures.<br />
(2) At the end of <strong>2005</strong>, this relates to five wells whose continuing capitalization is justified by firmly planned seismic activity for two wells and significant studies for the remaining three wells.<br />
At the end of <strong>2005</strong>, there was no amount of capitalized exploratory<br />
drilling costs that was associated with areas not requiring major<br />
capital expenditures before production could begin, where more<br />
than one year had elapsed since the <strong>com</strong>pletion of drilling.<br />
At the end of <strong>2005</strong>, an amount of 108 M€ was associated with<br />
suspended wells in areas where major capital expenditures will<br />
be required and no future exploratory activity is firmly planned.<br />
This amount corresponds to six projects (19 wells) and is mainly<br />
associated with the four projects further described below:<br />
The first project (PazFlor–3rd Pole of Block 17) relates to a group of<br />
four deepwater oil discoveries in Angola on which five wells were<br />
drilled between 2000 and 2004 for a capitalized amount of 39 M€<br />
as of December 31, <strong>2005</strong> and one well was drilled in <strong>2005</strong> for a<br />
capitalized amount of 10 M€ as at December 31, <strong>2005</strong>. Studies<br />
carried out in <strong>2005</strong> for the development of this group of discoveries<br />
have led to the selection of the development concept (Floating,<br />
Production, Storage and Offloading unit or FPSO with a capacity<br />
of 200 kbbl/d) on the basis of which engineering studies have now<br />
been launched. Booking of proved reserves is currently anticipated<br />
in 2006-2008.<br />
The second project (Usan) relates to a deepwater oil discovery in<br />
Nigeria for which six wells were drilled between 2001 and 2004<br />
for a capitalized amount of 28 M€ as of December 31, <strong>2005</strong> and<br />
Amounts and number of wells as of December 31<br />
(in millions of euros)<br />
242 TOTAL - <strong>Registration</strong> <strong>Document</strong> <strong>2005</strong><br />
two wells were drilled in <strong>2005</strong> for a capitalized amount of 7 M€<br />
as of December 31, <strong>2005</strong>. Following these exploration works,<br />
engineering and development studies have been performed in<br />
<strong>2005</strong> leading to the submission to the national oil <strong>com</strong>pany NNPC<br />
of a Field Development Plan which envisages the construction<br />
of a FPSO. Booking of proved reserves is currently anticipated in<br />
2006-2008.<br />
The third project (Laggan) relates to a deepwater gas discovery in<br />
the UK West of Shetland Islands, for which one well was drilled in<br />
2004 for a capitalized amount of 16 M€ as of December 31, <strong>2005</strong>.<br />
TOTAL and its partners have launched studies to define the<br />
development concept. Booking of proved reserves is currently<br />
anticipated in 2007-2009.<br />
The fourth project (Bonga SW) relates to a deepwater oil<br />
discovery in Nigeria for which three wells were drilled between<br />
2001 and 2003 and for which 8 M€ were capitalized as of<br />
December 31, <strong>2005</strong>. Together with the operator and co-venturers,<br />
the Company is working on the elaboration of a Field Development<br />
Plan and pursuing negotiations aimed at a possible unitization of<br />
the field with adjacent licenses. The project team set up in <strong>2005</strong><br />
by the operator has launched the selection of potential contractors<br />
for the development. Booking of proved reserves is currently<br />
anticipated in 2006-2008.<br />
<strong>2005</strong> 2004 2003<br />
amount number amount number amount number<br />
wells for which drilling is not <strong>com</strong>pleted 63 12 91 13 39 10<br />
wells with <strong>com</strong>pleted drilling<br />
Less than 1 year<br />
• 200 29 126 12 223 23<br />
Between 1 and 4 years<br />
• 304 40 198 29 139 26<br />
Between 4 years and 8 years<br />
• 23 4 15 2 21 3<br />
More than 8 years<br />
• - - - - - -<br />
<strong>Total</strong> 590 85 430 56 422 62