03.06.2013 Views

Registration Document 2005 - Total.com

Registration Document 2005 - Total.com

Registration Document 2005 - Total.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TOTAL is pursuing decentralized rural electrification activities by<br />

responding to calls for tenders from public authorities in various<br />

countries such as Mali, Morocco and South Africa. In South Africa,<br />

the project underway to equip 15,000 households, led by<br />

Kwazulu Energy Service Company (TOTAL 35%), had equipped<br />

almost 10,000 households by the end of <strong>2005</strong>, <strong>com</strong>pared to 4,000<br />

at the end of 2004 and 3,000 at the end of 2003.<br />

In Morocco, Temasol, 32.2% of which is directly owned by TOTAL<br />

and another 35.6% by TENESOL, continued to work on a project<br />

awarded in 2002 to equip 16,000 households. In 2004, Temasol<br />

was also awarded a project to equip 37,000 households. In <strong>2005</strong>,<br />

it was awarded part of a project to equip an additional 5,500<br />

households. At the end of <strong>2005</strong>, approximately 20,000 of the<br />

total of 58,500 households covered by these projects had been<br />

equipped, <strong>com</strong>pared to 10,000 at the end of 2004 and 4,200 at<br />

the end of 2003.<br />

wind power<br />

TOTAL operates a wind farm in Mardyck, France and has initiated<br />

development studies for both onshore and offshore projects in<br />

France, the UK and Spain.<br />

The 12 MW capacity Mardyck wind farm in northern France,<br />

<strong>com</strong>missioned in November 2003, produced approximately<br />

26.4 GWh of electricity in <strong>2005</strong>. This wind farm allows the<br />

<strong>com</strong>parison of different technologies at the same site in order to<br />

prepare for possible larger scale offshore or onshore projects in<br />

the future.<br />

Business overview<br />

Gas & Power - Upstream<br />

TOTAL - <strong>Registration</strong> <strong>Document</strong> <strong>2005</strong><br />

2<br />

In December <strong>2005</strong>, TOTAL was selected by the French Ministry<br />

of Industry for a wind power project with a 90 MW capacity in the<br />

Aveyron region pursuant to a call for tenders organized by the<br />

public authorities. Pursuant to the terms of the bid, the construction<br />

of the project is subject to obtaining a permit. The efforts to obtain<br />

this permit will be coupled with efforts to inform and consult with<br />

concerned parties and will also be the object of a public inquiry.<br />

The wind farm may be operational in 2008. Work on this project<br />

will be conducted by an equal partnership between TOTAL and<br />

Harpen, a member of the RWE group, organized as the<br />

“Éoliennes de Mounès” <strong>com</strong>pany.<br />

TOTAL responded to a call for tenders from the French authorities<br />

by submitting a proposal in 2004 to create a wind farm offshore<br />

Dunkirk. This proposal was not selected by the French Ministry of<br />

Industry, which announced a new call for tenders. TOTAL plans on<br />

resubmitting a proposal for this offer.<br />

wave power<br />

In addition to its participation in the development of solarphotovoltaic<br />

and wind power, TOTAL has decided to participate<br />

in the development of wave power. In June <strong>2005</strong> TOTAL acquired<br />

a 10% interest in a pilot project located offshore Santona, on the<br />

northern coast of Spain.<br />

Studies are underway to determine the ultimate size of the facilities,<br />

including the generation capacity. This research and development<br />

project should provide information necessary to better assess the<br />

technical and economic potential of this technology.<br />

39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!