9 DESIGNING THE BUILDING Volume II<br />

EXAMPLE 9.1. ROOF SHEATHING NAIL SPACING FOR WIND UPLIFT (concluded)<br />

• For framing at 24 in. o.c., roof suction loads on a plf basis is:<br />

• Nail spacing:<br />

Rounding down to next typical spacing value, specify 3-in. spacing<br />

Note: Edge zone nail spacing associated with Zone 3 OH pressures is conservative for other edge zone<br />

locations. Although increased nail spacing may be calculated for an edge zone away from the building<br />

corners, it is recommended that the same nailing schedule be used throughout all edge zones.<br />

9.1.2 Roof Framing to Exterior Wall (Link #2)<br />

Link #2 is the connection between the roof framing member (truss or rafter) and the top of the wall below<br />

(see Figures 9-6 and 9-8) for resistance to wind uplift. Metal connectors are typically used where uplift forces<br />

are large. A variety of metal connectors are available for attaching roof framing to the wall. Manufacturers’<br />

literature should be consulted for proper use of the connector and allowable capacities for resistance to uplift.<br />

Prescriptive solutions for the connection of the roof framing to the wall top plates are available in building<br />

codes and wind design standards. One method of sizing the connection between the roof framing and the<br />

exterior wall is provided in Example 9.2.<br />

Figure 9-8.<br />

Connection of roof<br />

framing to exterior wall<br />

(Link #2)<br />

9-8 COASTAL CONSTRUCTION MANUAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!