20.07.2013 Views

FEMA P55 Coastal Construction Manual, Fourth Edition - Mad Cad

FEMA P55 Coastal Construction Manual, Fourth Edition - Mad Cad

FEMA P55 Coastal Construction Manual, Fourth Edition - Mad Cad

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Volume II INDEX<br />

wave, 8-20<br />

wave slam, 8-25<br />

wind, 8-47<br />

wind, determining, 8-49<br />

window header, uplift and lateral load path, 9-14,<br />

Example 9.3<br />

Localized scour, 8-34<br />

Losses from natural hazards in coastal areas, 7-5<br />

Lowest floor<br />

below the BFE, 9-34<br />

corrosion below, 14-2<br />

DFE, 15-8<br />

elevation of, 7-8, 7-10, 7-14, 7-15, 7-16, 7-20, 8-6, 8-28,<br />

15-8<br />

elevator, 9-40, 10-5<br />

enclosures below, 7-16, 7-17<br />

flood damage above, 7-10<br />

inspection, 7-25<br />

penalties related to areas below the lowest floor, 7-16<br />

piles, 10-25<br />

pool, 9-40<br />

Zone A, lowest floor in, 7-15<br />

Zone V, lowest floor in, 7-15<br />

Lowest horizontal structural member, 7-8,, 7-14, 7-15,<br />

7-16, 10-23, 13-5<br />

M<br />

Main wind force resisting system (MWFRS), 8-48, 8-52<br />

determining pressures, 8-49, 8-51<br />

elements of shear walls and roof diaphragms, 8-61<br />

Maintenance, 14-1, 14-5<br />

decks and exterior wood, 14-9<br />

exterior-mounted mechanical and electrical equipment,<br />

14-9<br />

glazing, 14-7<br />

inspection checklist, 14-5<br />

metal connectors, 14-10<br />

roofs, 14-8<br />

siding, 14-7<br />

techniques, 14-11 (see also Maintenance techniques)<br />

Maintenance techniques, 14-11<br />

flooding, 14-12<br />

seismic and wind, 14-12<br />

Manufactured home, 7-14<br />

Masonry<br />

building material, 9-33<br />

buildings, 7-22<br />

chimneys, 15-5, 15-7<br />

concrete masonry unit (CMU), 11-16, 11-20<br />

construction, 9-12, 9-27, 9-32<br />

deterioration, 13-2<br />

COASTAL CONSTRUCTION MANUAL<br />

exterior walls, 7-23, 9-27<br />

foundation, 9-30, 13-3, 13-8, 13-18, 14-5<br />

frames, 9-27<br />

gables, 9-28<br />

grouted masonry cell, 9-11<br />

joints, 13-8<br />

materials, 9-35, 10-36, 15-14<br />

piers, 9-34<br />

termites, 11-13<br />

unreinforced masonry walls, 8-24<br />

veneer, 7-23, 14-6<br />

walls, 9-11, 11-7, 13-30, 15-5<br />

MEPS (see Molded expanded polystyrene)<br />

Metal connectors (see also Fasteners), 7-9<br />

maintenance, 14-10<br />

Metal roof panel, 11-45<br />

Mitigation<br />

elevation, 15-8, 15-9<br />

flood, 7-8, 15-8 (see also Flood mitigation)<br />

floodwalls and levees, 15-13<br />

high wind, 15-15 (see also High wind mitigation)<br />

multihazard, 15-14<br />

relocation, 15-10<br />

retrofitting, 15-2<br />

seismic, 15-5 (see also Seismic mitigation)<br />

wildfire, 15-2<br />

wind, 7-8<br />

Moisture, 9-35, 11-28, 12-11<br />

barrier, 11-16, 11-22, 13-9<br />

corrosion, 14-2<br />

exterior, 14-3<br />

framing construction, 13-14<br />

inspection, 13-18, 13-27, 13-29, 14-6<br />

interior, 14-3<br />

intrusion, 9-33, 11-20, 13-1, 13-8<br />

penetration or retention, 13-9<br />

stairs, 13-16<br />

sustainable design considerations, 7-24<br />

termites, 14-4<br />

Molded expanded polystyrene (MEPS), 11-19<br />

Municipal water connections, 12-12<br />

MWFRS (see Main wind force resisting system)<br />

N<br />

NAHB (see National Association of Home Builders)<br />

National Association of Home Builders (NAHB), 7-24<br />

National Flood Insurance Program (NFIP), 7-13<br />

building occupancy, 7-14<br />

building type, 7-14<br />

contents, 7-17<br />

covered items, 7-17<br />

I-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!