Volume II Designing the builDing envelope 11<br />

Enhanced Underlayment Option 3. Option 3 is the typical underlayment scheme (i.e., a single layer<br />

of #15 felt tacked to the sheathing, as shown in Figure 11-25) with the added enhancement of selfadhering<br />

modifed bitumen tape. Tis option provides limited protection against water infltration if<br />

the shingles blow of. However, this option provides more protection than the typical underlayment<br />

scheme. Option 3 is illustrated in Fact Sheet 7.2 in <strong>FEMA</strong> P-499.<br />

Figure 11-28 shows a house that used Option 3. Te self-adhering modifed bitumen tape at the sheathing<br />

joints was intended to be a third line of defense against water leakage (with the shingles the frst line and the<br />

felt the second line). However, as shown in the inset at Figure 11-28, the tape did not provide a watertight<br />

seal. A post-storm investigation revealed application problems with the tape. Staples (arrow, inset) were<br />

used to attach the tape because bonding problems were experienced during application. Apparently, the<br />

applicator did not realize the tape was intended to prevent water from leaking through the sheathing joints.<br />

With the tape in an unbonded and wrinkled condition, it was incapable of fulflling its intended purpose.<br />

Self-adhering modifed bitumen sheet and tape normally bond quite well to sheathing. Bonding problems<br />

are commonly attributed to dust on the sheathing, wet sheathing, or a surfacing (wax) on the sheathing that<br />

interfered with the bonding.<br />

In addition to taping the sheathing joints in the feld of the roof, the hip and ridge lines should also be taped<br />

unless there is a continuous ridge vent, and the underlayment should be lapped over the hip and ridge. By<br />

doing so, leakage will be avoided if the hip or ridge shingles blow of (see Figure 11-29). See Section 11.6 for<br />

recommendations regarding leakage avoidance at ridge vents.<br />

Figure 11-28.<br />

House that used enhanced underlayment Option 3 with taped sheathing joints (arrow). The self-adhering<br />

modifed bitumen tape (inset) was stapled because of bonding problems. Estimated wind speed: 110 mph.<br />

Hurricane Ike (Texas, 2008)<br />

SoURCE: IBHS, USED WITH PERMISSIoN<br />

COASTAL CONSTRUCTION MANUAL<br />

11-29