Volume II INDEX Elevation, 15-8 advantages and disadvantages of, 15-9 above BFE, 7-10, 7-19, 7-20 design flood, 8-6 required, 7-8 Elevators, 9-39, 12-1 accessory equipment, 12-2 enclosure, 12-2 installation, 9-40 negative discount points, below the BFE, 7-21 NFIP coverage, 7-18 one- to four-family residential structures, 9-40 safety, 12-2 shaft, 12-2 Embedment, 7-8 connectors, 9-35 piles, 7-8, 7-21, 7-25, 8-3, 10-12, 10-13, 10-20, 10-21, 10-23, 13-6, 14-12 treated timber piles, 10-25 wood piles, 10-15, 10-18 Emergency generator, size of, 12-9 warning box, backfeeding emergency power, 12-10 Enclosure below the BFE, 7-14 below the lowest floor, 7-14, 7-16 breakaway walls, 7-8 breaking wave load on vertical walls, 8-23 flood and wind mitigation, 7-8 inspection points, 7-25 localized scour around, 8-36, 8-37, Equation 8.12 NFIP requirements, 7-16, 7-17, 7-180 EnergyStar, 7-24 Erosion, 7-1, 7-7, 7-8, 7-10, 10-4 control device, 7-20 depth, 10-5 during base flood, 8-8 during design flood, 8-10 effect on flood hazard, 8-7 effect on ground elevation, 8-8 flood and wind mitigation, 7-8 flood loads and, 8-5 hazard areas, 7-7 long-term, 7-7, 8-7, 8-11, Example 8.1 primary frontal dune, 8-15 short-term warning box, erosion, long-term and storm-induced, 13-6 wind-induced, 7-7 Exterior doors, 11-4 Exterior insulating finishing system (EIFS), 11-16, 11-19 Exterior-mounted mechanical equipment, 12-2 air-conditioning condenser, damaged, 12-4 air-conditioning condenser, elevation of, 12-4 COASTAL CONSTRUCTION MANUAL flooding, 12-3 high winds, 12-2 maintenance, 14-9 seismic events, 12-6 F 500-year flood elevation, 8-6 safe rooms, 8-67 FAIR Plan, 7-21 Fasteners, 7-9, 8-64, 9-6, 9-11, 9-24, 13-10 corrosion, 11-4, 11-48, 14-2, 14-5, 14-6 corrosion resistant, 9-38 felt, 11-28 flood and wind mitigation, 7-9 frame, 11-6, 11-10 galvanized, 9-35 heads, 11-43 laminated, 11-35 mechanical, 11-19 metal, 7-9, 9-25, 9-37, 14-9 shingle, 11-25, 11-30, 11-35, 11-37 siding, 11-17 slate, 11-47 spacing, 9-4 stainless steel, 11-23, 11-47, 11-48, 12-3 substitution, 13-28 tie, 11-18, 11-19 tile, 11-43 vertical, 13-14 wood frame building, 13-20 Fill (see Structural fill), 7-8 Fire sprinkler systems, 12-12 FIRM (see Flood Insurance Rate Map) Flashing, 7-8, 11-21 door and window, 11-22 roof-to-wall, 11-22 deck-to-wall, 11-22 Flood depth parameters, 8-9 depth, wave setup contribution to, 8-15 design, 8-5 design flood elevation, 8-6 insurance, 7-10, 7-13 (see also National Flood Insurance Program) load calculation, 8-44, Worksheets 1, 2 load combinations, 8-37, 8-38, Example 8.4 loads, 8-5 mitigation measures, 7-8, 15-8 (see also Flood mitigation) velocities during tsunamis, 8-15 I-5
INDEX Volume II Floodborne debris dead load, 8-3 electric service, 12-7 piles, 12-5 water supply line riser, 12-10 Flood damage-resistant material, 9-36, 10-2, 12-2, 13-18 inspection considerations, 7-26 flood mitigation, 15-8, 15-13 Flood elevation, 8-5 advisory, 8-7 design stillwater, 8-10 regulatory, 8-6 Flood hazard area elevators, 9-40 safe rooms, 8-68 Flood insurance (see also National Flood Insurance Program) Flood Insurance Rate Map (FIRM), 7-4, 7-10, 7-14, 7-15 BFE, 8-6 NFIP, 7-15, 7-19 pre-FIRM, 7-15 post-FIRM, 7-15, 7-16, 7-17, 7-19 use of, 8-6, 8-10 Flood Insurance Study (FIS) (see also National Flood Insurance Program), 7-4, 8-10 500-year flood elevation, 8-6 Flood mitigation, 7-8, 15-8 dry floodproofing, 15-11, 15-12 elevation, 15-8, 15-9 floodwalls and levees, 15-13, 15-14 multihazard mitigation, 15-16 relocation, 15-10 wet floodproofing, 15-12, 15-13 Floodproofing (see Dry floodproofing; Wet floodproofing) Flooding (see Flood) Floodplain 100-year (see Base flood), 7-15, 8-5, 8-6, 8-10 500-year, 8-67 administrator, 7-16 crawlspaces, 14-4 elevators, 12-2 inspection, 7-25 management program, 7-18 management regulations, 7-16, 7-17, 12-6 managers, 7-25, 9-40 NFIP regulations, 7-15 ordinances, 8-18, 9-40 relocation out of, 15-10 septic systems, 12-11 Flood retrofitting (see flood mitigation) Floodwalls, 15-13 advantages and disadvantages of, 15-14 warning box, floodwalls and levees, 15-14 Flood zones, 7-19, 10-5 Floor framing, 13-23 horizontal beams and girders, 13-24 inspection points, 13-25 substitution of materials, 13-25 Floors elevated buildings, floors in, 11-4 framing, 13-23 (see also Floor framing) framing to support beam connection, 9-17 lowest floor below the BFE, 9-34 support beam to foundation connection, 9-18, 9-19 Footings continuous, 9-27, 10-37, 10-45, 14-12 Force hydrostatic, 8-18, Equation 8.3, 8-19 vertical hydrostatic, 8-19, Equation 8.4, 8-20 Foundations (see also Foundation construction), 10-1 column, 7-8 closed, 10-3 closed, failure of, 10-4 closed/shallow, 10-35 construction, 13-2 (see also Foundation construction) design, 10-1 design criteria, 10-2 design process, 10-10 design requirements and recommendations, 10-4 deep, 10-4 erosion, long- and short-term, 10-5 open, 7-8, 10-3 open/deep, 10-25 (see also Open/deep foundation) open/shallow, 10-34 (see also Open/shallow foundation) perimeter wall, 7-8 pile, 7-8, 10-11 (see also Pile foundation; Foundation construction) pier, 7-8, 10-36 (see also Pier foundation) shallow, 10-4 site considerations, 10-5 site elevation, 10-5 site soils, 10-5 soils data, 10-5 style selection, 10-5 styles, 10-2 styles in coastal areas, 10-3 Foundation construction, 13-2 concrete, 13-10, 13-11 field preservative treatment, 13-17 inspection points, 13-18 layout, 13-2, 13-3 masonry, 13-8, 13-9, 13-10 material durability, 13-13 pile driving resistance, 13-8 piles, 13-3, 13-4, 13-5, 13-6 I-6 COASTAL CONSTRUCTION MANUAL
- Page 1 and 2:
Coastal Construction Manual Princip
- Page 3 and 4:
All illustrations in this document
- Page 5 and 6:
PREFACE Volume II Chapter 8 - Site-
- Page 7 and 8:
1 CHAPTER TITLE Contents COASTAL CO
- Page 9 and 10:
Volume II CONTENTS Chapter 9. Desig
- Page 11 and 12:
Volume II CONTENTS Chapter 11. Desi
- Page 13 and 14:
Volume II CONTENTS 12.5 Water and W
- Page 15 and 16:
Volume II CONTENTS 15.4.1 Evaluatin
- Page 17 and 18:
Volume II CONTENTS Figure 9-10. Roo
- Page 19 and 20:
Volume II CONTENTS Figure 11-3. Hou
- Page 21 and 22:
Volume II CONTENTS Figure 11-47. Da
- Page 23 and 24:
Volume II CONTENTS Chapter 15 Figur
- Page 25 and 26:
Volume II CONTENTS Table 10-9. Adva
- Page 27 and 28:
Volume II CONTENTS Example 8.4. Flo
- Page 29 and 30:
1 CHAPTER TITLE COASTAL CONSTRUCTIO
- Page 31 and 32:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 33 and 34:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 35 and 36:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 37 and 38:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 39 and 40:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 41 and 42:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 43 and 44:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 45 and 46:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 47 and 48:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 49 and 50:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 51 and 52:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 53 and 54:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 55 and 56:
Volume II PRE-DESIGN CONSIDERATIONS
- Page 57 and 58:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 59 and 60:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 61 and 62:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 63 and 64:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 65 and 66:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 67 and 68:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 69 and 70:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 71 and 72:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 73 and 74:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 75 and 76:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 77 and 78:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 79 and 80:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 81 and 82:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 83 and 84:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 85 and 86:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 87 and 88:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 89 and 90:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 91 and 92:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 93 and 94:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 95 and 96:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 97 and 98:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 99 and 100:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 101 and 102:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 103 and 104:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 105 and 106:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 107 and 108:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 109 and 110:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 111 and 112:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 113 and 114:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 115 and 116:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 117 and 118:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 119 and 120:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 121 and 122:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 123 and 124:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 125 and 126:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 127 and 128:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 129 and 130:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 131 and 132:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 133 and 134:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 135 and 136:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 137 and 138:
8 DETERMINING SITE-SPECIFIC LOADS V
- Page 139 and 140:
9 DESIGNING THE BUILDING Volume II
- Page 141 and 142:
9 DESIGNING THE BUILDING Volume II
- Page 143 and 144:
9 DESIGNING THE BUILDING Volume II
- Page 145 and 146:
9 DESIGNING THE BUILDING Volume II
- Page 147 and 148:
9 DESIGNING THE BUILDING Volume II
- Page 149 and 150:
9 DESIGNING THE BUILDING Volume II
- Page 151 and 152:
9 DESIGNING THE BUILDING Volume II
- Page 153 and 154:
9 DESIGNING THE BUILDING Volume II
- Page 155 and 156:
9 DESIGNING THE BUILDING Volume II
- Page 157 and 158:
9 DESIGNING THE BUILDING Volume II
- Page 159 and 160:
9 DESIGNING THE BUILDING Volume II
- Page 161 and 162:
9 DESIGNING THE BUILDING Volume II
- Page 163 and 164:
9 DESIGNING THE BUILDING Volume II
- Page 165 and 166:
9 DESIGNING THE BUILDING Volume II
- Page 167 and 168:
9 DESIGNING THE BUILDING Volume II
- Page 169 and 170:
9 DESIGNING THE BUILDING Volume II
- Page 171 and 172:
9 DESIGNING THE BUILDING Volume II
- Page 173 and 174:
9 DESIGNING THE BUILDING Volume II
- Page 175 and 176:
9 DESIGNING THE BUILDING Volume II
- Page 177 and 178:
9 DESIGNING THE BUILDING Volume II
- Page 179 and 180:
9 DESIGNING THE BUILDING Volume II
- Page 181 and 182:
1 CHAPTER TITLE COASTAL CONSTRUCTIO
- Page 183 and 184:
Volume II DESIGNING THE FOUNDATION
- Page 185 and 186:
Volume II DESIGNING THE FOUNDATION
- Page 187 and 188:
Volume II DESIGNING THE FOUNDATION
- Page 189 and 190:
Volume II DESIGNING THE FOUNDATION
- Page 191 and 192:
Volume II DESIGNING THE FOUNDATION
- Page 193 and 194:
Volume II DESIGNING THE FOUNDATION
- Page 195 and 196:
Volume II DESIGNING THE FOUNDATION
- Page 197 and 198:
Volume II DESIGNING THE FOUNDATION
- Page 199 and 200:
Volume II DESIGNING THE FOUNDATION
- Page 201 and 202:
Volume II DESIGNING THE FOUNDATION
- Page 203 and 204:
Volume II DESIGNING THE FOUNDATION
- Page 205 and 206:
Volume II DESIGNING THE FOUNDATION
- Page 207 and 208:
Volume II DESIGNING THE FOUNDATION
- Page 209 and 210:
Volume II DESIGNING THE FOUNDATION
- Page 211 and 212:
Volume II DESIGNING THE FOUNDATION
- Page 213 and 214:
Volume II DESIGNING THE FOUNDATION
- Page 215 and 216:
Volume II DESIGNING THE FOUNDATION
- Page 217 and 218:
Volume II DESIGNING THE FOUNDATION
- Page 219 and 220:
10 DESIGNING THE FOUNDATION Volume
- Page 221 and 222:
10 DESIGNING THE FOUNDATION Volume
- Page 223 and 224:
10 DESIGNING THE FOUNDATION Volume
- Page 225 and 226:
10 DESIGNING THE FOUNDATION Volume
- Page 227 and 228:
10 DESIGNING THE FOUNDATION Volume
- Page 229 and 230:
1 CHAPTER TITLE COASTAL CONSTRUCTIO
- Page 231 and 232:
Volume II Designing the builDing en
- Page 233 and 234:
Volume II Designing the builDing en
- Page 235 and 236:
Volume II Designing the builDing en
- Page 237 and 238:
Volume II Designing the builDing en
- Page 239 and 240:
Volume II Designing the builDing en
- Page 241 and 242:
Volume II Designing the builDing en
- Page 243 and 244:
Volume II Designing the builDing en
- Page 245 and 246:
Volume II Designing the builDing en
- Page 247 and 248:
Volume II Designing the builDing en
- Page 249 and 250:
Volume II Designing the builDing en
- Page 251 and 252:
Volume II Designing the builDing en
- Page 253 and 254:
Volume II Designing the builDing en
- Page 255 and 256:
Volume II Designing the builDing en
- Page 257 and 258:
Volume II Designing the builDing en
- Page 259 and 260:
Volume II Designing the builDing en
- Page 261 and 262:
Volume II Designing the builDing en
- Page 263 and 264:
Volume II Designing the builDing en
- Page 265 and 266:
Volume II Designing the builDing en
- Page 267 and 268:
Volume II Designing the builDing en
- Page 269 and 270:
Volume II Designing the builDing en
- Page 271 and 272:
Volume II Designing the builDing en
- Page 273 and 274:
Volume II Designing the builDing en
- Page 275 and 276:
Volume II Designing the builDing en
- Page 277 and 278:
Volume II Designing the builDing en
- Page 279 and 280:
Volume II Designing the builDing en
- Page 281 and 282:
Volume II Designing the builDing en
- Page 283 and 284:
Volume II Designing the builDing en
- Page 285 and 286:
12 INSTALLING MECHANICAL EQUIPMENT
- Page 287 and 288:
12 INSTALLING MECHANICAL EQUIPMENT
- Page 289 and 290:
12 INSTALLING MECHANICAL EQUIPMENT
- Page 291 and 292:
12 INSTALLING MECHANICAL EQUIPMENT
- Page 293 and 294:
12 INSTALLING MECHANICAL EQUIPMENT
- Page 295 and 296:
12 INSTALLING MECHANICAL EQUIPMENT
- Page 297 and 298:
13 CONSTRUCTING THE BUILDING Volume
- Page 299 and 300:
13 CONSTRUCTING THE BUILDING Volume
- Page 301 and 302:
13 CONSTRUCTING THE BUILDING Volume
- Page 303 and 304:
13 CONSTRUCTING THE BUILDING Volume
- Page 305 and 306:
13 CONSTRUCTING THE BUILDING Volume
- Page 307 and 308:
13 CONSTRUCTING THE BUILDING Volume
- Page 309 and 310:
13 CONSTRUCTING THE BUILDING Volume
- Page 311 and 312:
13 CONSTRUCTING THE BUILDING Volume
- Page 313 and 314:
13 CONSTRUCTING THE BUILDING Volume
- Page 315 and 316:
13 CONSTRUCTING THE BUILDING Volume
- Page 317 and 318:
13 CONSTRUCTING THE BUILDING Volume
- Page 319 and 320:
13 CONSTRUCTING THE BUILDING Volume
- Page 321 and 322:
13 CONSTRUCTING THE BUILDING Volume
- Page 323 and 324:
13 CONSTRUCTING THE BUILDING Volume
- Page 325 and 326:
13 CONSTRUCTING THE BUILDING Volume
- Page 327 and 328:
13 CONSTRUCTING THE BUILDING Volume
- Page 329 and 330:
14 MAINTAINING THE BUILDING Volume
- Page 331 and 332:
14 MAINTAINING THE BUILDING Volume
- Page 333 and 334:
14 MAINTAINING THE BUILDING Volume
- Page 335 and 336:
14 MAINTAINING THE BUILDING Volume
- Page 337 and 338:
14 MAINTAINING THE BUILDING Volume
- Page 339 and 340: 14 MAINTAINING THE BUILDING Volume
- Page 341 and 342: 1 CHAPTER TITLE COASTAL CONSTRUCTIO
- Page 343 and 344: Volume II RETROFITTING BUILDINGS FO
- Page 345 and 346: Volume II RETROFITTING BUILDINGS FO
- Page 347 and 348: Volume II RETROFITTING BUILDINGS FO
- Page 349 and 350: Volume II RETROFITTING BUILDINGS FO
- Page 351 and 352: Volume II RETROFITTING BUILDINGS FO
- Page 353 and 354: Volume II RETROFITTING BUILDINGS FO
- Page 355 and 356: Volume II RETROFITTING BUILDINGS FO
- Page 357 and 358: Volume II RETROFITTING BUILDINGS FO
- Page 359 and 360: Volume II RETROFITTING BUILDINGS FO
- Page 361 and 362: Volume II RETROFITTING BUILDINGS FO
- Page 363 and 364: 1 CHAPTER TITLE Acronyms COASTAL CO
- Page 365 and 366: Volume II ACRONYMS H HMA Hazard Mit
- Page 367 and 368: Volume II ACRONYMS T TMS The Masonr
- Page 369 and 370: GLOSSARY Volume II Basement - Under
- Page 371 and 372: GLOSSARY Volume II Conditions Great
- Page 373 and 374: GLOSSARY Volume II F Federal Emerge
- Page 375 and 376: GLOSSARY Volume II G Gabion - Rock-
- Page 377 and 378: GLOSSARY Volume II Location - The l
- Page 379 and 380: GLOSSARY Volume II O Open foundatio
- Page 381 and 382: GLOSSARY Volume II Risk tolerance -
- Page 383 and 384: GLOSSARY Volume II safe living cond
- Page 385 and 386: GLOSSARY Volume II Z Zone A - Under
- Page 387 and 388: INDEX Volume II Building envelope,
- Page 389: INDEX Volume II stillwater flood de
- Page 393 and 394: INDEX Volume II I IBHS (see Insuran
- Page 395 and 396: INDEX Volume II date of constructio
- Page 397 and 398: INDEX Volume II Seawall, 7-7, 7-17,
- Page 399 and 400: INDEX Volume II velocity pressure,