Volume II DESIGNING THE BUILDING 9<br />

the soil. See Chapter 10 for considerations that must be taken into account with regard to the interaction<br />

between the foundation members and soil in the load path.<br />

EXAMPLE 9.6. UPLIFT LOAD PATH FOR SUPPORT BEAM TO PILE<br />

Given:<br />

Find:<br />

• Refer to Figure 9-18<br />

• Unit uplift load at top of floor beams = 463.2 plf (from Example 9.5)<br />

• Pile spacing = 9.33 ft<br />

• Continuous beam of 28-ft length at end wall<br />

COASTAL CONSTRUCTION MANUAL<br />

Figure 9-18.<br />

Connection of floor<br />

support beam to<br />

foundation (Link #8)<br />

• ASD capacity for 1-in. diameter bolt in beam-to-pile connection = 1,792 lb (where wood<br />

specific gravity (G) = 0.42, 3.5-in. side member, and 5.25-in. main member<br />

1. Uplift load for support beam-to-pile connections.<br />

2. Number of bolts required for support beam-to-pile connections for wind uplift.<br />

Solution for #1: The uplift load for the support beam-to-pile connections can be determined as<br />

follows:<br />

Uplift:<br />

Tributary length of center pile connection = 9.33 ft<br />

9-19