8 DETERMINING SITE-SPECIFIC LOADS Volume II<br />

EXAMPLE 8.4. FLOOD LOAD EXAMPLE PROBLEM (continued)<br />

Solution for #7: Breaking wave height (H b ) at seaward row of pilings can be found as follows:<br />

At seaward row of pilings, H b = (d s )(0.78) where d s = 4.6 ft from Solution #3<br />

Solution for #8: Hydrodynamic (velocity flow) loads (F dyn ) on a pile (not in seaward row) can be<br />

calculated using Equation 8.8 as follows:<br />

On one pile:<br />

where:<br />

C d = 2.0 for a square pile<br />

A =<br />

= 1.99 slugs/ft 3<br />

V = 12.2 ft/sec (because the building is on oceanfront, use the upper bound flow velocity<br />

for calculating loads)<br />

F dyn on one pile = 909 lb<br />

Solution for #9: Breaking wave loads (F brkp) on seaward row of pilings can be found using<br />

Equation 8.5 as follows:<br />

F brkp on one pile<br />

where:<br />

for square piles<br />

for saltwater<br />

from Solution #7<br />

F brkp on one pile = 868 lb<br />

F brkp on seaward row of piles (i.e., 7 piles) = (625 lb)(7) = 6,076 lb<br />