9 DESIGNING THE BUILDING Volume II<br />

EXAMPLE 9.6. UPLIFT LOAD PATH FOR SUPPORT BEAM-TO-PILE (concluded)<br />

Uplift load at center pile connection = (9.33 ft)(463.2 plf )= 4,322 lb<br />

Uplift load at end pile connection = (4.67 ft)(463.2 plf) = 2,163 lb<br />

Solution for #2: The number of bolts required for the support beam-to-pile connections can be<br />

determined as follows:<br />

Connection at center pile (number of bolts) =<br />

3 bolts at support beam-to-pile connection<br />

2 bolt at support beam-to-pile connection<br />

Figure 9-19.<br />

Diaphragm stiffening and<br />

corner pile bracing to<br />

reduce pile cap rotation<br />

9-20 COASTAL CONSTRUCTION MANUAL