8 DETERMINING SITE-SPECIFIC LOADS Volume II<br />

EXAMPLE 8.1. DESIGN STILLWATER FLOOD DEPTH CALCULATIONS (continued)<br />

Find:<br />

Illustration B. Primary frontal dune will be lost to erosion during a 100-year flood<br />

because dune reservoir is less than 1,100 ft 2 (Section A of Illustration A)<br />

The design stillwater flood depth (d s ) at the seaward row of piles for varying values of stillwater<br />

elevation, presence of freeboard, and consideration of the effects of future conditions (e.g., sea-level<br />

rise and long-term erosion).<br />

The basis of the design flood for four scenarios are as follows:<br />

1. 100-year stillwater elevation (NGVD). Future conditions not considered.<br />

2. 100-year stillwater elevation (NGVD) plus freeboard. Future conditions not considered.<br />

3. 100-year stillwater elevation (NGVD). Future conditions (sea-level rise and long-term erosion)<br />

in 50 years considered.<br />

4. 500-year wave crest elevation (NGVD). Future conditions not considered.<br />

Note: Design stillwater flood depth (d s ) is determined using Equation A for scenarios in which a non-100year<br />

frequency-based DFE is specified by the AHJ. Freeboard tied to the 100-year flood should not be used<br />

to increase d s since load factors in ASCE 7 were developed for the 100-year nominal flood load.<br />

8-12 COASTAL CONSTRUCTION MANUAL