Volume II CONSTRUCTING THE BUILDING 13<br />

Table 13-3. Roof Frame Inspection Points<br />

Inspection Point Reason<br />

1. Roof framing attachment to<br />

walls<br />

Only material that is rated and specified for the expected use and environmental conditions should<br />

be used.<br />

Builders should understand that the weakest connections fail first and that it is therefore critical to<br />

pay attention to every connection. The concept of continuous load path must be considered for every<br />

connection in the structure.<br />

Exposed steel in the structural frame corrodes even in places such as the attic space. The builder should<br />

plan for it by installing hot-dipped galvanized or stainless steel hardware and nails.<br />

Compliance with suggested nailing schedules for roof, wall, and floor sheathing is very important.<br />

13.3 Building Envelope<br />

The building envelope comprises the exterior doors, windows, skylights, non-load-bearing walls, wall<br />

coverings, soffits, roof systems, and attic vents. The floor is also considered a part of the envelope in buildings<br />

elevated on open foundations. Building envelope design is discussed in detail in Chapter 11. The key to<br />

successful building envelope construction is having a detailed plan that is followed carefully by the builder,<br />

as described below.<br />

A suitable design must be provided that is sufficiently specified and detailed to allow the builder to<br />

understand the design intent and to give the contractor adequate and clear guidance. Lack of sufficient and<br />

clear design guidance regarding the building envelope is common. If necessary, the contractor should seek<br />

additional guidance from the design professional or be responsible for providing design services in addition<br />

to constructing the building.<br />

COASTAL CONSTRUCTION MANUAL<br />

Ensures that the sufficient number, size, and type of nails are used in<br />

the proper connector<br />

2. Size and location of openings Ensures performance of roof as a diaphragm<br />

3. “H” clips or roof frame<br />

blocking<br />

4. Sheathing nailing – number,<br />

spacing, depth of nails<br />

5. Material storage – protection<br />

from elements prior to<br />

installation<br />

6. Rafter or ceiling joist material<br />

– excessive crown or lateral<br />

warping<br />

7. Gable-end bracing<br />

Ensures that there is support for edges of the sheathing material<br />

Ensures that sheathing acts as a shear diaphragm and is able to resist<br />

uplift<br />

Ensures that the wood does not absorb too much moisture prior to<br />

installation—exposure promotes checks and splits in wood, warp, and<br />

separation in plywood<br />

Maintains level ceilings<br />

Ensures that bracing conforms to design requirements and<br />

specifications<br />

13-29