02.08.2013 Views

[Sample B: Approval/Signature Sheet] - George Mason University

[Sample B: Approval/Signature Sheet] - George Mason University

[Sample B: Approval/Signature Sheet] - George Mason University

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The actual thresholds can be defined by the DM in order to establish the minimum<br />

acceptable level of utility and the maximum acceptable cost. In this example, the best<br />

region of the graph for an alternative to be is region 1 and the worst is region 4 (see fig.<br />

45).<br />

Utility<br />

0.6<br />

0.5<br />

0.4<br />

0.3<br />

0.2<br />

0.1<br />

0<br />

1 2<br />

3 4<br />

0 10 20 30 40 50 60 70<br />

Million U$<br />

Figure 45. Cost Effectiveness Regions.<br />

In the hypothetical scenario, the alternative ASW is in the borderline between<br />

region 1 and 2, thus it may or not meet the cost requirements if estimates vary enough.<br />

The FTR alternative is the most expensive, but it also brings the largest contribution to<br />

the BAF‘s operational capability. On the other hand, CGO is below the utility threshold<br />

and is the second most expensive alternative, thus it should be one of the less preferred<br />

by the DM. Finally, HLA and UAV are the only alternatives within region 1, but small<br />

90

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!