The deficiency is caused by material shortages and not by poor training or<br />

deficient use of doctrines, tactics or processes.<br />

Due to technological innovations that can provide a new capability or more<br />

efficiency in the accomplishment of a current one.<br />

Market opportunities that favor the substitution of obsolete equipment in an<br />

economic way.<br />

Moreover, the OCRs must provide information, as detailed as possible, of the<br />

following aspects related to the requested system: 26<br />

Description of the operational deficiency.<br />

Description of the intended uses, and in which scenarios.<br />

Required performance, described as complete as possible.<br />

Suggestions of systems already in use in the internal/external market that<br />

could be used as a reference.<br />

Logistic necessities.<br />

Requested quantity of systems.<br />

Expected results and benefits.<br />

After an OCR is generated, it follows the chain of command until it gets to the Air<br />

Force Chief of Staff‘s Office (AFCS) in order to be analyzed. The accepted OCRs are<br />

used to generate a Preliminary Operational Requirements document (POR), which<br />

describes in greater detail the desired characteristics and applications of the requested<br />

26 Comando da Aeronáutica, ICA 400-14 Confecção de Necessidade Operacional - NOP (Brasilia, Brasil:<br />

Comando da Aeronáutica, 2003), 18.<br />